SAMRUDDHI HEIGHTS
RG-MH-93301 · RERA P51800015900 · Last updated on MahaRERA portal: 29 Nov 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 34 months past the filed date
- 10 complaints at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SAMRUDDHI HEIGHTS is a Residential / Group Housing project by SAVITA GHANSHYAM GAJARE in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800015900 on 4 Apr 2018. Possession was promised by 30 Dec 2023 and is now 34 months past that date. 25 of the 69 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 10 complaints are on record with the regulator.
At a glance
Project
- NameSAMRUDDHI HEIGHTS
- TypeResidential / Group Housing
- Location
- Unnat Nagar 2
- Pahadi Goregaon (West)
- Borivali
- Mumbai Suburban
- 400062
- Pincode400062
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800015900
- ReraGenie IDRG-MH-93301
Builder
- NameSAVITA GHANSHYAM GAJARE
- Entity typeIndividual
- AopROHIT SADANAND SAWANT
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on4 Apr 2018
- Promised completion30 Dec 2023
- Revised completionNone
- Buildings1 building record
- Documents filed79 files
Current status
Figures as on 29 Nov 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SAMRUDDHI HEIGHTS | NA | 20 | 18 | 69 | 0 | 69 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 57%.
SAMRUDDHI HEIGHTS: 42% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 57% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 29 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed18
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 14.95 cr | Rs 9.72 cr |
| SAMRUDDHI HEIGHTS | NA | Rs 11.70 cr | Rs 9.95 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sandeep Pandurang Vichare |
| Architect | Sagar Makhela |
| Engineer | Prasanna Suresh Joshi |
| Engineer | JC Consultants |
| Chartered Accountant | G.D shah & Associates |
| Chartered Accountant | H P Jadeja & Associates |
| Partner | Role in project |
|---|---|
| SARATHI CONSTRUCTION | - |
Complaints filed with MahaRERA10
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000375127 | Gautam Pradeep Ghadge | M/S SARATHI CONSTRUCTION | 06/04/2023 |
| CC006000000375150 | SIDDHARTHA PRADEEP GHADGE | M/S SARATHI CONSTRUCTION | 06/04/2023 |
| CC006000000429131 | Satish Mahabaleshwar Ambe | Mrs Savita Ghanshyam Gajare | 16/02/2024 |
| CC006000000429345 | Dilip Ratilal Chudasama | SAVITA GHANSHYAM GAJARE | 20/02/2024 |
| CC12400402 | Sarvesh Sampati Yadav | SAVITA GHANSHYAM GAJARE | 12/10/2024 |
| CC12503290 | SAVITA GHANSHYAM GAJARE | Bhavya Pankaj shah | 15/09/2025 |
| CC12503291 | SAVITA GHANSHYAM GAJARE | Disha Pankaj Shah | 15/09/2025 |
| CC12503798 | SIDDHARTHA PRADEEP GHADGE | SAVITA GHANSHYAM GAJARE | 30/10/2025 |
| CC12504594 | Shailesh Malekar | SAVITA GHANSHYAM GAJARE | 23/12/2025 |
| CC12601183 | Gautam Pradeep Ghadge | SAVITA GHANSHYAM GAJARE | 04/03/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Mar 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Mar 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Oct 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Oct 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed79
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: FORM 1 Q4 18-19.pdf | 29 Nov 2025 |
| Form 2File: Form 2 Q4 18-19.pdf | 29 Nov 2025 |
| Form 3File: Form 3 Q4 18-19.pdf | 29 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory Q4 18-19.pdf | 29 Nov 2025 |
| Form 1File: FORM 1 Q4 19-20.pdf | 29 Nov 2025 |
| Form 2File: Form 2 Q4 19-20.pdf | 29 Nov 2025 |
| Form 3File: Form 3 Q4 19-20.pdf | 29 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: New Inventory Q4 19-20.pdf | 29 Nov 2025 |
| Form 1File: FORM 1 Q4 20-21.pdf | 29 Nov 2025 |
| Form 2File: Form 2 Q4 20-21.pdf | 29 Nov 2025 |
| Form 3File: Form 3 Q4 20-21 new.pdf | 29 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY Q4 20-21.pdf | 29 Nov 2025 |
| Form 1File: FORM 1 Q1 22-23.pdf | 29 Nov 2025 |
| Form 2File: Form 2 Q1 22-23.pdf | 29 Nov 2025 |
| Form 3File: Form 3 Q1 22-23.pdf | 29 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY Q1 22-23.pdf | 29 Nov 2025 |
| Form 1File: FORM 1 Q2 22-23 new.pdf | 29 Nov 2025 |
| Form 2File: Form 2 Q2 22-23 (1).pdf | 29 Nov 2025 |
| Form 3File: Form 3 Q2 22-23 (1).pdf | 29 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY Q2 22-23.pdf | 29 Nov 2025 |
| Form 1File: FORM 1 Q3 22-23 (1).pdf | 29 Nov 2025 |
| Form 2File: Form 2 Q3 22-23.pdf | 29 Nov 2025 |
| Form 3File: Form 3 Q3 22-23.pdf | 29 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY Q3 22-23.pdf | 29 Nov 2025 |
| Form 5 (FY 2020-2021)File: Fom 5 20-21.pdf | 28 Nov 2025 |
| Form 5 (FY 2021-2022)File: Form 5 21-22.pdf | 28 Nov 2025 |
| Form 5 (FY 2022-2023)File: Form 5 22-23.pdf | 28 Nov 2025 |
| Form 5 (FY 2023-2024)File: Form 5 23-24.pdf | 28 Nov 2025 |
| Form 2A (FY 2019-2020)File: Form 2A 19-20.pdf | 18 Sep 2025 |
| Form 2A (FY 2020-2021)File: Form 2A 20-21.pdf | 18 Sep 2025 |
| Form 2A (FY 2021-2022)File: Form 2A 21-22.pdf | 18 Sep 2025 |
| Form 2A (FY 2022-2023)File: Form 2A 22-23.pdf | 18 Sep 2025 |
| Form 2A (FY 2023-2024)File: Form 2A 23-24.pdf | 18 Sep 2025 |
| Form 5 (FY 2019-2020)File: Form 5 19-20.pdf | 18 Sep 2025 |
| Form 1File: FORM 1 Q4 22-23.pdf | 11 Sep 2025 |
| Form 2File: Form 2 Q4 22-23.pdf | 11 Sep 2025 |
| Form 3File: Form 3 Q4 22-23.pdf | 11 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY Q4 22-23.pdf | 11 Sep 2025 |
| Form 1File: FORM 1 Q4 21-22.pdf | 11 Sep 2025 |
| Form 2File: Form 2 Q4 21-22.pdf | 11 Sep 2025 |
| Form 3File: Form 3 Q4 21-22.pdf | 11 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY Q4 21-22.pdf | 11 Sep 2025 |
| Form 1File: FORM 1 Q1 23-24.pdf | 10 Sep 2025 |
| Form 2File: Form 2 Q1 23-24.pdf | 10 Sep 2025 |
| Form 3File: Form 3 Q1 23-24.pdf | 10 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY Q1 23-24 new.pdf | 10 Sep 2025 |
| Form 1File: FORM 1 Q2 23-24.pdf | 10 Sep 2025 |
| Form 2File: Form 2 Q2 23-24.pdf | 10 Sep 2025 |
| Form 3File: FORM 3 Q2 23-24.pdf | 10 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY Q2 23-24 new.pdf | 10 Sep 2025 |
| Form 1File: FORM 1 Q3 23-24.pdf | 10 Sep 2025 |
| Form 2File: Form 2 Q3 23-24.pdf | 10 Sep 2025 |
| Form 3File: FORM 3 Q3 23-24.pdf | 10 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: INVENTORY Q3 23-24 new.pdf | 10 Sep 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: download.pdf | 4 Nov 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5.pdf | 4 Nov 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: Further CC up to 14th Floor (Pt).pdf | 9 Oct 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects certficate Form 1.pdf | 9 Oct 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate- Form 2.pdf | 9 Oct 2020 |
| Certificates of CA (Form 3)File: CA Certificte RERA FORM 3.pdf | 9 Oct 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: Further_CC_up_to_14th_Floor__Pt_.pdf | 1 Mar 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1-_Architect_Certificate_01.pdf | 1 Mar 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_Certificate_01.pdf | 1 Mar 2020 |
| Certificates of CA (Form 3)File: CA_Certificate_01.pdf | 1 Mar 2020 |
| Building plan approvalFile: Amended Plan.pdf | 10 Oct 2019 |
| Building Plan Approval (IOD)File: Amended Plan.pdf | 10 Oct 2019 |
| Annual Audit Report of Statutory CA (Form 5)File: Form-5.pdf | 9 Oct 2019 |
| Building plan approvalFile: IOD.pdf | 23 Mar 2018 |
| Layout approvalFile: Building Permission.pdf | 23 Mar 2018 |
| PAN CardFile: Pan Card -Pramoter Owner Savita Gajare.pdf | 23 Mar 2018 |
| Copy of the legal title reportFile: Title Certificate.pdf | 23 Mar 2018 |
| Details of encumbrancesFile: Non Encumbarance Certificate.pdf | 23 Mar 2018 |
| Copy of Layout Approval (in case of layout)File: Building Permission.pdf | 23 Mar 2018 |
| Building Plan Approval (IOD)File: IOD.pdf | 23 Mar 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 23 Mar 2018 |
| Declaration in FORM BFile: Form B.pdf | 23 Mar 2018 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 23 Mar 2018 |
| Proforma of Allotment letterFile: allotment letter on Srathi construction Letter Head.pdf | 23 Mar 2018 |
| Proforma of Allotment letterFile: RERA Agreement for sale - Sarathi Construction.pdf | 23 Mar 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 79 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SAMRUDDHI HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Pahadi Goregaon (West)6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 347 registered projects within 2 km.
NIRLON EMPLOYEES COOPERATIVE HOUSING SOCIETY L
SHIVAM PARIVAR DEVELOPERS PVT LTD
GUNDECHA REXON SUITES PHASE 1
ANAYA INFRASTRUCTURE PVT LTD
PALAI TOWERS
N D DEVELOPERS
AGARWAL FLORENCE
PARAM ANAND BUILDERS LLP
KRISHNA KUNJ PHASE 1
PRINCE HOUSING AND HOSPITALITY PRIVATE LIM
NIRLON EMPLOYEES CHS LTD BUILDING NO. 10
Shivam Parivar Developers Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: SAVITA GHANSHYAM GAJARE
SAVITA GHANSHYAM GAJARE has 1 registration on MahaRERA, including SAMRUDDHI HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that SAMRUDDHI HEIGHTS shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SAMRUDDHI HEIGHTS is delayed beyond 30 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SAMRUDDHI HEIGHTS?
The registered promoter entity is SAVITA GHANSHYAM GAJARE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SAMRUDDHI HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SAMRUDDHI HEIGHTS?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SAMRUDDHI HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SAMRUDDHI HEIGHTS?
The professionals named in the filing: Architect: Sandeep Pandurang Vichare; Architect: Sagar Makhela; Engineer: Prasanna Suresh Joshi; Engineer: JC Consultants; Chartered Accountant: G.D shah & Associates; Chartered Accountant: H P Jadeja & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SAMRUDDHI HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback