Home / Browse projects / Mumbai Suburban, Maharashtra / NIRLON EMPLOYEES COOPERATIVE HOUSING SOCIETY LIMITED BUILDING NO 11, 12 ,13
NIRLON EMPLOYEES COOPERATIVE HOUSING SOCIETY LIMITED BUILDING NO 11, 12 ,13
By SHIVAM PARIVAR DEVELOPERS PVT LTD
RG-MH-37267 · RERA P51800011447 · Last updated on MahaRERA portal: 21 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 13 complaints at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
NIRLON EMPLOYEES COOPERATIVE HOUSING SOCIETY LIMITED BUILDING NO 11, 12 ,13 is a Residential / Group Housing project by SHIVAM PARIVAR DEVELOPERS PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800011447 on 31 Aug 2017. Possession was promised by 30 Dec 2025 and is now 10 months past that date. The completion date has moved by 12 months from the original filing. 305 of the 421 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 13 complaints are on record with the regulator.
At a glance
Project
- NameNIRLON EMPLOYEES COOPERATIVE HOUSING SOCIETY LIMITED BUILDING NO 11, 12 ,13
- TypeResidential / Group Housing
- Location
- Siddharth Nagar SV Road
- Goregaon west
- Borivali
- Mumbai Suburban
- 400062
- Pincode400062
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800011447
- ReraGenie IDRG-MH-37267
Builder
- NameSHIVAM PARIVAR DEVELOPERS PVT LTD
- Entity typeCompany
- DirectorsSanjay Waman Bhosale, Pramod Waman Bhosale, Ajit Waman Bhosale
- Other registrations4 more →
- Completed1 of 5
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on31 Aug 2017
- Promised completion30 Dec 2025
- Revised completionRevised to 30 Dec 2025 (originally 30 Dec 2024)
- Buildings1 building record
- Documents filed187 files
Current status
Figures as on 21 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| NIRLON EMPLOYEES CHS LTD | NA | 28 | 28 | 390 | 31 | 421 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 21 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 62%.
NIRLON EMPLOYEES CHS LTD: 56% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 62% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 51% |
| Sanitary Fittings within the flats / premises | 18% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 59% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 23% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 2% |
Progress on shared amenities15
As on 21 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 30% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed146
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| NIRLON EMPLOYEES CHS LTD | NA | Rs 81.66 cr | Rs 61.24 cr |
| - | NA | Rs 3.56 cr | Rs 1.78 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Space Moulders |
| Engineer | Vaijnath Nachankar |
| Chartered Accountant | Shripati Gandhi Choudhari and Co |
| Chartered Accountant | Rahul Bera |
| Partner | Role in project |
|---|---|
| SHIVAM PARIVAR DEVELOPERS PVT LTD | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterAs per attachment
Litigation declared5
| Case | Court | Status |
|---|---|---|
| 1204/2013 | DINDOSHI COURT | this matter is between complainant and society and doesnt effect redevelopment project of SPDPL |
| CC/14/325/2014 | CONSUMER COURT | For final hearing and disposal of the matter |
| CC/14/347/2014 | CONSUMER COURT | For final hearing and disposal of the matter |
| CC/14/270/2014 | CONSUMER COURT | For final hearing and disposal of the matter |
| CC/14/308/2014 | CONSUMER COURT | For final hearing and disposal of the matter |
Complaints filed with MahaRERA13
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000001479 | Nilesh Dave | M/s. Shivam Parivar DevelopersPvt Ltd | 27/10/2017 |
| CC006000000057271 | Nirlon Ltd | Shivam Parivar Developers Pvt. Ltd. | 12/12/2018 |
| CC006000000396591 | Praveen U Sute | Shivam Parivar Developers Pvt Ltd | 10/07/2023 |
| CC12500872 | Amit Yogesh Dave | SHIVAM PARIVAR DEVELOPERS PVT LTD | 13/03/2025 |
| CC12500933 | kanaiyalal bhura bhai davda | SHIVAM PARIVAR DEVELOPERS PVT LTD | 17/03/2025 |
| CC12600341 | GUNJAN SURENDRA SINGH | SHIVAM PARIVAR DEVELOPERS PVT LTD | 18/01/2026 |
| CC12601660 | AMBAVI VALA VAVIYA | SHIVAM PARIVAR DEVELOPERS PVT LTD | 24/03/2026 |
| CC12601720 | Namit Vijaykant Furia | SHIVAM PARIVAR DEVELOPERS PVT LTD | 25/03/2026 |
| CC12602577 | SAYYED MOHD NOORUL HASAN | SHIVAM PARIVAR DEVELOPERS PVT LTD | 03/05/2026 |
| CC12602856 | sanjay yashwant pawaskar | SHIVAM PARIVAR DEVELOPERS PVT LTD | 15/05/2026 |
| CC12604081 | kanchan sanjay butani | SHIVAM PARIVAR DEVELOPERS PVT LTD | 30/06/2026 |
| CC12603729 | Navin C Asthana | SHIVAM PARIVAR DEVELOPERS PVT LTD | 17/06/2026 |
| CC12603773 | Mangesh Jayram Koltharkar | SHIVAM PARIVAR DEVELOPERS PVT LTD | 18/06/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Nov 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Jun 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Jun 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed187
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 187 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A - March 26.pdf | 21 Apr 2026 |
| Form 5 (FY 2024-2025)File: Form 5.pdf | 2 Mar 2026 |
| Form 2A (FY 2024-2025)File: Form 2A - March 25.pdf | 19 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 - 11 12 13 - Dec 25.pdf | 16 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 - 11 12 13 - Dec 25.pdf | 16 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 - 11 12 13 - Dec 25.pdf | 16 Feb 2026 |
| Withdrawal Update Form 1File: Form 1 - Sept 25.pdf | 18 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 - 11,12 u0026 13.pdf | 18 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 - Nirlon 11,12 u0026 13 Sept 2025.pdf | 18 Nov 2025 |
| Withdrawal Update Form 1File: Form 1 - June 25 - Nirlon 11 12 13.pdf | 15 Sep 2025 |
| Withdrawal Update Form 2File: Form 2 - June 25 - Nirlon 11 12 13.pdf | 15 Sep 2025 |
| Withdrawal Update Form 3File: Final Form 3 - June 25.pdf | 15 Sep 2025 |
| Form 5 (FY 2020-2021)File: Form 5 - Nirlon 11 12 13 FY 20-21.pdf | 25 Aug 2025 |
| Form 5 (FY 2021-2022)File: Form 5 - Nirlon 11 12 13 FY 21-22.pdf | 25 Aug 2025 |
| Form 5 (FY 2022-2023)File: Form 5 - Nirlon 11 12 13 FY 22-23.pdf | 25 Aug 2025 |
| Form 5 (FY 2023-2024)File: Form 5 - Nirlon 11 12 13 FY 23-24.pdf | 25 Aug 2025 |
| Form 2A (FY 2018-2019)File: March 19.pdf | 21 Aug 2025 |
| Form 2A (FY 2019-2020)File: March 20.pdf | 21 Aug 2025 |
| Form 2A (FY 2020-2021)File: March 21.pdf | 21 Aug 2025 |
| Form 2A (FY 2021-2022)File: Form-2A FY-2021-22.pdf | 21 Aug 2025 |
| Form 2A (FY 2023-2024)File: Form-2A 23-24.pdf | 21 Aug 2025 |
| Form 2A (FY 2022-2023)File: March 23 Form 2A.pdf | 21 Aug 2025 |
| Form 5 (FY 2019-2020)File: Form 5 - Nirlon 11 12 13 FY 19-20.pdf | 21 Aug 2025 |
| Form 1File: Form-1 Nirlon-11,12,13 (1).pdf | 15 Jul 2025 |
| Form 2File: Form-2 Nirlon-11,12,13 (1).pdf | 15 Jul 2025 |
| Form 3File: Form 3 - New_compressed (1).pdf | 15 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure -Nirlon 11,12 & 13 March 25.pdf | 15 Jul 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 Nirlon-11,12,13.pdf | 23 Apr 2025 |
| Declaration in FORM BFile: Affidavit - Form B - Nirlon 11 12 13_compressed.pdf | 11 Feb 2025 |
| Declaration in FORM BFile: FOrm B _100225.pdf | 10 Feb 2025 |
| Certificates of CA (Form 3)File: Form March 20_compressed.pdf | 8 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 March 21_compressed.pdf | 8 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 March 22_compressed.pdf | 8 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 March 23_compressed.pdf | 8 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 March 24_compressed.pdf | 8 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 June 24_compressed.pdf | 8 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 Sep 24_compressed.pdf | 8 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 Dec 24_compressed.pdf | 8 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: RERA Disclaousure - NIrlon 11 12 13 - As on 31122024_compressed.pdf | 8 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 271224 Form-1Nirlon-111213 dtd31 March 2024.pdf | 7 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 Nirlon-111213 dtd30 June 202.pdf | 7 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 Nirlon-111213 dtd30 Sep 2024.pdf | 7 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1 Nirlon-111213 Dec2024.pdf | 7 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Nirlon-111213 Dec2024.pdf | 7 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 271224 Form-2 Nirlon-111213June-24.pdf | 7 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 271224 Form-2 Nirlon-111213 -March-24.pdf | 7 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Nirlon-111213 Dec2024.pdf | 7 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 271224 Form-2 Nirlon-111213 -Sept24.pdf | 7 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 271224 Form-2 Nirlon-111213 -Sept24.pdf | 7 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold - Nirlon 11 12 13 - Sept 2024_compressed.pdf | 7 Feb 2025 |
| CERSAI detailsFile: Declaration CERSAI - Nirlon 11 12 13.pdf | 7 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclousure of Interest in other RERA - Sanjay Bhosale.pdf | 7 Feb 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclousure of Interest in other RERA - Ajit Bhosale.pdf | 7 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 271224 Form-2A Nirlon-111213 FY-2023.pdf | 7 Feb 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclousure of Interest in other RERA - Sanjay Bhosale.pdf | 7 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - Nirlon 11 12 13 FY 19-20.pdf | 31 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - Nirlon 11 12 13 FY 20-21.pdf | 31 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - Nirlon 11 12 13 FY 21-22.pdf | 31 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Nirlon 11 12 13 FY 22-23.pdf | 31 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Nirlon 11 12 13 FY 23-24.pdf | 31 Jan 2025 |
| Declaration in FORM BFile: Form B.pdf | 17 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A 23-24.pdf | 17 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold booked inventory June24_compressed.pdf | 17 Oct 2024 |
| Layout approvalFile: MYSCAN_20240115_0001.pdf | 13 Jun 2024 |
| Layout approvalFile: MYSCAN_20240115_0002_.pdf | 13 Jun 2024 |
| Layout approvalFile: MYSCAN_20240115_0003.pdf | 13 Jun 2024 |
| Layout approvalFile: MYSCAN_20240115_0004_.pdf | 13 Jun 2024 |
| Layout approvalFile: MYSCAN_20240115_0005_.pdf | 13 Jun 2024 |
| Layout approvalFile: MYSCAN_20240115_0006_.pdf | 13 Jun 2024 |
| Layout approvalFile: MYSCAN_20240115_0007.pdf | 13 Jun 2024 |
| Layout approvalFile: MYSCAN_20240115_0008.pdf | 13 Jun 2024 |
| Layout approvalFile: MYSCAN_20240115_0009.pdf | 13 Jun 2024 |
| Layout approvalFile: MYSCAN_20240115_0010.pdf | 13 Jun 2024 |
| Layout approvalFile: MYSCAN_20240115_0011.pdf | 13 Jun 2024 |
| Layout approvalFile: MYSCAN_20240115_0012.pdf | 13 Jun 2024 |
| Layout approvalFile: MYSCAN_20240115_0013_.pdf | 13 Jun 2024 |
| Layout approvalFile: MYSCAN_20240115_0014.pdf | 13 Jun 2024 |
| Layout approvalFile: MYSCAN_20240115_0015_.pdf | 13 Jun 2024 |
| Layout approvalFile: MYSCAN_20240115_0016_.pdf | 13 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20240115_0001.pdf | 13 Jun 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 187 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep NIRLON EMPLOYEES COOPERATIVE HOUSING SOCIETY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Goregaon west6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 347 registered projects within 2 km.
GUNDECHA REXON SUITES PHASE 1
ANAYA INFRASTRUCTURE PVT LTD
PALAI TOWERS
N D DEVELOPERS
AGARWAL FLORENCE
PARAM ANAND BUILDERS LLP
KRISHNA KUNJ PHASE 1
PRINCE HOUSING AND HOSPITALITY PRIVATE LIM
NIRLON EMPLOYEES CHS LTD BUILDING NO. 10
Shivam Parivar Developers Private Limited
Rishabraj Avyaana
RISHABRAJ ESTATE DEVELOPERS PRIVATE LIMITE
See every Mumbai Suburban project, with the district possession charts
Builder: SHIVAM PARIVAR DEVELOPERS PVT LTD
SHIVAM PARIVAR DEVELOPERS PVT LTD has 5 registrations on MahaRERA, including SIDDHARTH NAGAR GULMOHAR CHS LTD and NIRLON EMPLOYEES COOPERATIVE HOUSING SOCIETY LIMITED BUILDING NO 11, 12 ,13. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that NIRLON EMPLOYEES COOPERATIVE HOUSING SOCIETY LIMITED BUILDING NO 11, 12 ,13 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if NIRLON EMPLOYEES COOPERATIVE HOUSING SOCIETY LIMITED BUILDING NO 11, 12 ,13 is delayed beyond 30 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of NIRLON EMPLOYEES COOPERATIVE HOUSING SOCIETY LIMITED BUILDING NO 11, 12 ,13?
The registered promoter entity is SHIVAM PARIVAR DEVELOPERS PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in NIRLON EMPLOYEES COOPERATIVE HOUSING SOCIETY LIMITED BUILDING NO 11, 12 ,13?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against NIRLON EMPLOYEES COOPERATIVE HOUSING SOCIETY LIMITED BUILDING NO 11, 12 ,13?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for NIRLON EMPLOYEES COOPERATIVE HOUSING SOCIETY LIMITED BUILDING NO 11, 12 ,13?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at NIRLON EMPLOYEES COOPERATIVE HOUSING SOCIETY LIMITED BUILDING NO 11, 12 ,13?
The professionals named in the filing: Architect: Space Moulders; Engineer: Vaijnath Nachankar; Chartered Accountant: Shripati Gandhi Choudhari and Co; Chartered Accountant: Rahul Bera. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in NIRLON EMPLOYEES COOPERATIVE HOUSING SOCIETY LIMITED BUILDING NO 11, 12 ,13?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback