Home / Browse projects / Mumbai Suburban, Maharashtra / GUNDECHA REXON SUITES PHASE 1
GUNDECHA REXON SUITES PHASE 1
By ANAYA INFRASTRUCTURE PVT LTD
RG-MH-45270 · RERA P51800034503 · Last updated on MahaRERA portal: 14 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Litigation declared, 1 case
- Completion date moved by 31 months
- 1 extension taken
Clear
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
GUNDECHA REXON SUITES PHASE 1 is a Residential / Group Housing project by ANAYA INFRASTRUCTURE PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800034503 on 11 Apr 2022. Possession is promised by 30 Oct 2028. The completion date has moved by 31 months from the original filing. 25 of the 230 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameGUNDECHA REXON SUITES PHASE 1
- TypeResidential / Group Housing
- Location
- CTS No. 1383
- 1385A
- 1385B of Malad-S and CTS No. 918A of Pahadi Goregaon West
- S.V.Road
- Goregaon West
- Goregaon
- Borivali
- Mumbai Suburban
- 400062
- Pincode400062
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800034503
- ReraGenie IDRG-MH-45270
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on11 Apr 2022
- Promised completion30 Oct 2028
- Revised completionRevised to 30 Oct 2028 (originally 31 Mar 2026)
- Buildings1 building record
- Documents filed166 files
Current status
Figures as on 14 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| REXON AURA | NA | 56 | 38 | 230 | 0 | 230 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 14 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 35%.
REXON AURA: 42% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 27% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 35% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities16
As on 14 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 25% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
| Treatment and Disposal of sewerage and sullage water | Yes | 0% |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| JAI RAMESHWAR CHSL | Borivali | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 149.75 cr | Rs 69.51 cr |
| REXON AURA | NA | Rs 93.45 cr | Rs 54.44 cr |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | KALPESH SHAH |
| Engineer | Vijay Vishwanath Koli Vishwanath Koli |
| Chartered Accountant | Nikesh Jain |
| Partner | Role in project |
|---|---|
| ANAYA INFRASTRUCTURE PVT LTD | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe have come into the project recently after order for change of Promoter was issued on 18.09.2023. We would like to say that neither previous Developers Rexon Developers LLP have sold any unit nor have we sold any unit, hence there will not be any prejudice, loss or any problem to any person if the date of completion of the project is allowed to be change to 30/10/2028. This is to safeguard the interest of proposed Purchasers and to bring transparency on actual Completion Date.
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 491/2025 | City Civil Court of Bombay at Dindoshi | Ongoing |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 10 Oct 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 10 Oct 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Oct 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Oct 2028
Documents filed166
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 166 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: License Surveyor Cert Form1.pdf | 14 Aug 2026 |
| Withdrawal Update Form 2File: Engineer Cert Form2.pdf | 14 Aug 2026 |
| Withdrawal Update Form 3File: AIPL FORM 3.pdf | 14 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 Rexon.pdf | 12 Aug 2026 |
| Withdrawal Update Form 1File: Licensed Surveyor Cert Form1.pdf | 12 Aug 2026 |
| Withdrawal Update Form 1File: fom1 rexon.pdf | 12 Aug 2026 |
| Withdrawal Update Form 2File: Engineers Cert Form2.pdf | 12 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 Rexon.pdf | 12 Aug 2026 |
| Withdrawal Update Form 2File: Form 2 Rexon.pdf | 12 Aug 2026 |
| Withdrawal Update Form 3File: AIPL FORM 3.pdf | 12 Aug 2026 |
| Withdrawal Update Form 3File: AIPL FORM 3.pdf | 12 Aug 2026 |
| Withdrawal Update Form 3File: AIPL FORM 3.pdf | 12 Aug 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 10 Aug 2026 |
| Withdrawal Update Form 2File: EngineerCertForm2.pdf | 10 Aug 2026 |
| Withdrawal Update Form 3File: AIPL FORM 3 JUN 25 SIGNED.pdf | 10 Aug 2026 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AIPL FORM 3.pdf | 5 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Rexon.pdf | 5 May 2025 |
| Disclosure of sold/ booked inventoryFile: Rexon Sold Unsold Inventory.pdf | 5 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Rexon.pdf | 5 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 19 Feb 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Amended CC Rexon.pdf | 19 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AIPL FORM 3.pdf | 10 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 10 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory.pdf | 10 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 12 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AIPL FORM 3.pdf | 12 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 12 Nov 2024 |
| OtherFile: Disclosure of Sold Booked Inventory.pdf | 12 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 9 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 9 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf | 9 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AIPL FORM 3.pdf | 9 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 29 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf | 29 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf | 29 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate Form 1.pdf | 26 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AIPL CA Form 3.pdf | 26 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Rexon 31march 2023.pdf | 14 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect.pdf | 2 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 2 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf | 2 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AIPL CA Certificate Form 3.pdf | 2 Feb 2024 |
| OtherFile: Sold Unsold Report.pdf | 2 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 12 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Cert Form 2.pdf | 12 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA.pdf | 12 Oct 2023 |
| Declaration about Commencement CertificateFile: Declaration for Commencement Certificate.pdf | 11 Oct 2023 |
| Proforma of Agreement for saleFile: AFS RERA DRAFT Gundecha Rexon Suites Phase 1.pdf | 11 Oct 2023 |
| Deviation Report with respect to model copy of AgreementFile: Devation Report In Draft Agreement For Sale.pdf | 11 Oct 2023 |
| OtherFile: Board Resolution.pdf | 11 Oct 2023 |
| Layout approvalFile: Declration of No Layout.pdf | 10 Oct 2023 |
| Building plan approvalFile: JR plan 1.pdf | 10 Oct 2023 |
| Building plan approvalFile: JR plan 2.pdf | 10 Oct 2023 |
| Building plan approvalFile: JR plan 3.pdf | 10 Oct 2023 |
| Building plan approvalFile: JR plan 4.pdf | 10 Oct 2023 |
| Building plan approvalFile: JR plan 5.pdf | 10 Oct 2023 |
| Building plan approvalFile: JR plan 6.pdf | 10 Oct 2023 |
| Building plan approvalFile: JR plan 7.pdf | 10 Oct 2023 |
| Building plan approvalFile: JR plan 8.pdf | 10 Oct 2023 |
| Building plan approvalFile: JR plan 9.pdf | 10 Oct 2023 |
| Building plan approvalFile: JR plan 10.pdf | 10 Oct 2023 |
| Building plan approvalFile: JR plan 11.pdf | 10 Oct 2023 |
| Building plan approvalFile: JR plan 12.pdf | 10 Oct 2023 |
| Building plan approvalFile: JR plan 13.pdf | 10 Oct 2023 |
| Building plan approvalFile: JR plan 14.pdf | 10 Oct 2023 |
| Building plan approvalFile: JR plan 15.pdf | 10 Oct 2023 |
| Building plan approvalFile: JR plan 16.pdf | 10 Oct 2023 |
| Building plan approvalFile: JR plan 17.pdf | 10 Oct 2023 |
| Building plan approvalFile: JR plan 18.pdf | 10 Oct 2023 |
| Building plan approvalFile: JR plan 19.pdf | 10 Oct 2023 |
| Building plan approvalFile: JR plan 20.pdf | 10 Oct 2023 |
| Building plan approvalFile: JR plan 21.pdf | 10 Oct 2023 |
| Building plan approvalFile: JR plan 22.pdf | 10 Oct 2023 |
| Building plan approvalFile: JR plan 23.pdf | 10 Oct 2023 |
| Building plan approvalFile: JR plan 24.pdf | 10 Oct 2023 |
| Building plan approvalFile: JR plan 25.pdf | 10 Oct 2023 |
| PAN CardFile: pancard Anaya.pdf | 10 Oct 2023 |
| Copy of the legal title reportFile: Title Certificate.pdf | 10 Oct 2023 |
| Details of encumbrancesFile: Declaration of Emcrumbance.pdf | 10 Oct 2023 |
| Details of encumbrances concerned to FinanceFile: Declaration no legal encumberance.pdf | 10 Oct 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|
| GUNDECHA ASTA PHASE IP51800001504 | Andheri, Mumbai Suburban | Jul 2017 | Completed | May 2018 | Feb 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 166 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep GUNDECHA REXON SUITES PHASE 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near S.V.Road, Goregaon West6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 374 registered projects within 2 km.
NIRLON EMPLOYEES COOPERATIVE HOUSING SOCIETY L
SHIVAM PARIVAR DEVELOPERS PVT LTD
PALAI TOWERS
N D DEVELOPERS
AGARWAL FLORENCE
PARAM ANAND BUILDERS LLP
KRISHNA KUNJ PHASE 1
PRINCE HOUSING AND HOSPITALITY PRIVATE LIM
NIRLON EMPLOYEES CHS LTD BUILDING NO. 10
Shivam Parivar Developers Private Limited
Rishabraj Avyaana
RISHABRAJ ESTATE DEVELOPERS PRIVATE LIMITE
See every Mumbai Suburban project, with the district possession charts
Builder: ANAYA INFRASTRUCTURE PVT LTD
Anaya Infrastructure Pvt. Ltd. has 2 registrations on MahaRERA, including GUNDECHA ASTA PHASE I and GUNDECHA REXON SUITES PHASE 1. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if GUNDECHA REXON SUITES PHASE 1 is delayed beyond 30 Oct 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of GUNDECHA REXON SUITES PHASE 1?
The registered promoter entity is ANAYA INFRASTRUCTURE PVT LTD, a company as per the filing. Its GSTIN 27AAHCA8244Q1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in GUNDECHA REXON SUITES PHASE 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for GUNDECHA REXON SUITES PHASE 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at GUNDECHA REXON SUITES PHASE 1?
The professionals named in the filing: Architect: KALPESH SHAH; Engineer: Vijay Vishwanath Koli Vishwanath Koli; Chartered Accountant: Nikesh Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in GUNDECHA REXON SUITES PHASE 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback