PALAI TOWERS
RG-MH-83212 · RERA P51800010465 · Last updated on MahaRERA portal: 29 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 7 complaints at MahaRERA
- Completion date moved by 66 months
- 5 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PALAI TOWERS is a Residential / Group Housing project by N D DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800010465 on 27 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 66 months from the original filing. 191 of the 217 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 7 complaints are on record with the regulator.
At a glance
Project
- NamePALAI TOWERS
- TypeResidential / Group Housing
- Location
- Piramal Nagar
- SV Road
- Borivali
- Mumbai Suburban
- 400062
- Pincode400062
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800010465
- ReraGenie IDRG-MH-83212
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on27 Aug 2017
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 30 Jun 2021)
- Buildings1 building record
- Documents filed101 files
Current status
Figures as on 29 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PALAI TOWERS | NA | 42 | 35 | 213 | 4 | 217 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 75%.
PALAI TOWERS: 74% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 75% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 49% |
| Sanitary Fittings within the flats / premises | 45% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 45% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 40% |
Progress on shared amenities15
As on 29 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 40% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 40% |
| Storm Water Drains | Yes | 45% |
| Landscaping & Tree Planting | Yes | 10% |
| Street Lighting | Yes | 20% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 35% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 45% |
| Electrical meter room, sub-station, receiving station | Yes | 75% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 100% |
Parking filed484
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| PALAI TOWERS | NA | Rs 176.47 cr | Rs 149.18 cr |
| - | NA | Rs 58.82 cr | Rs 30.26 cr |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | GAJJAR AND ASSOCIATES |
| Engineer | gaurav nanda |
| Chartered Accountant | JRSM AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| N D DEVELOPERS | - |
Extensions applied for5
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe Secretary, Maharashtra Real Estate Regulatory Authority 3rd Floor, A-Wing, Slum Rehabilitation Authority, Administrative Building, Anant Kanekar Marg, Bandra (E), Mumbai 400051 SUBJECT: Extension of Date of Completion of the project ‘Palai Towers’ RERA Registration Number: P51800010465 Dear Sir, With reference to the captioned subject, we would like to inform your goodself that our project ‘Palai Towers’ is registered on the MahaRERA webportal vide Registration Number: P51800010465. The registration certificate was issued for the period ending 30 June 2021 (A copy of the certificate is att
Reason as filed by the promoterDear Sir, With reference to the captioned subject, we would like to inform your goodself that our project ‘Palai Tower’ is registered on the MahaRERA webportal vide Registration Number: P51800010465. The registration certificate was issued for the period ending 30 June 2021 (A copy of the certificate is attached herewith as Annexure 1). We would like to request you to extend the date of completion by a further twelve months i.e 30 June 2022. With reference to the above, we would also like to inform your goodself that the construction and all the major allied are ongoing for the project. There
Reason as filed by the promoterDear Sir/Madam We are applying for extension of date of completion to 31/12/2024. There has been a delay due to obtaining permissions required for further construction of the building. However, all the required permissions have been obtained and we shall complete the construction of the building within the extended due date of 31/12/2024. We request you to kindly consider the same.
Reason as filed by the promoterDear Sir/Madam
Reason as filed by the promoterDear Sir/Madam, please refer annexure for reason for delay
Complaints filed with MahaRERA7
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000195510 | N D DEVELOPERS | ND DEVELOPERS | 04/01/2021 |
| CC006000000197801 | Mushtaq A. Kasmani | N.D. Developers | 30/07/2021 |
| CC006000000197803 | Vasim A Kasmani | N.D. Developers | 30/07/2021 |
| CC006000000197804 | Jabin M. Kasamani | N.D. Developers | 30/07/2021 |
| CC006000000197806 | Sain V. Kasmani | N.D. Developers | 30/07/2021 |
| CC006000000429006 | M/s N D Developers | Mr. Altaz Shabudin Ratnani | 21/02/2024 |
| CC12501959 | Manoj Kumar | N D DEVELOPERS | 16/06/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Apr 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed101
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 PALAI TOWERS.pdf | 29 May 2026 |
| Withdrawal Update Form 2File: Rera Form 2 - Upto MAr 26.pdf | 29 May 2026 |
| Withdrawal Update Form 3File: form 3-palai towers.pdf | 29 May 2026 |
| Form 5 (FY 2024-2025)File: FORM 5 N D PT 2 MAR 25.pdf | 1 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 - Palai Tower - 7-Jan-26.pdf | 25 Feb 2026 |
| Withdrawal Update Form 2File: Rera Form 2 - Upto dec 2025 -PTG.pdf | 25 Feb 2026 |
| Withdrawal Update Form 3File: form 3-palai towers.pdf | 25 Feb 2026 |
| Form 2A (FY 2023-2024)File: Form 2 A Engineers Certificate for Quality Assurance.pdf | 25 Feb 2026 |
| Form 5 (FY 2023-2024)File: FORM 5 PALAI TOWER MAR 24.pdf | 25 Feb 2026 |
| Withdrawal Update Form 1File: FORM 1 PALAI TOWERS.pdf | 19 Feb 2026 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 (1).pdf | 19 Feb 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form3 (1).pdf | 19 Feb 2026 |
| Form 2A (FY 2024-2025)File: Form 2 A Engineers Certificate for Quality Assurance.pdf | 29 Dec 2025 |
| Withdrawal Update Form 1File: FORM 1.pdf | 28 Dec 2025 |
| Withdrawal Update Form 1File: Withdrawal Application Form1 (1).pdf | 28 Dec 2025 |
| Withdrawal Update Form 2File: PT FORM 2 ENGINEERS_SEPT.pdf | 28 Dec 2025 |
| Withdrawal Update Form 2File: Withdrawal Application Form2 (1).pdf | 28 Dec 2025 |
| Withdrawal Update Form 3File: Form 3_compressed.pdf | 28 Dec 2025 |
| Withdrawal Update Form 3File: Withdrawal Application Form3 (1).pdf | 28 Dec 2025 |
| Form 1File: Form 1 Architect Certificate.pdf | 15 May 2025 |
| Form 2File: FORM2 - PTG - MARCH2025.pdf | 15 May 2025 |
| Disclosure of Sold and Booked InventoryFile: 5 Disclosure of sold_ booked inventory MAR 25.pdf | 15 May 2025 |
| Form 3File: 3454_250424183028_001_compressed.pdf | 15 May 2025 |
| Self-declaration of Quarterly ProgressFile: 3454_250424183028_001_compressed.pdf | 15 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate.pdf | 30 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate.pdf | 30 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A Engineers Certificate for Quality Assurance.pdf | 30 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: 5 Disclosure of sold_ booked inventory MAR 25.pdf | 29 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM2 - PTG - MARCH2025.pdf | 28 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - PTG - MARCH2025.pdf | 28 Apr 2025 |
| Certificates of CA (Form 3)File: 3454_250424183028_001_compressed.pdf | 24 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 Architect Certificate_mar 25.pdf | 23 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - 18-Jan-25.pdf | 19 Mar 2025 |
| Certificates of CA (Form 3)File: 3390_250318101941_001_compressed.pdf | 18 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: Decleration PT Inventory.pdf | 18 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form -2 Engineers Certificate.pdf | 17 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form - 2A Engineers Certificate for Quality Assurance.pdf | 17 Mar 2025 |
| Certificates of CA (Form 3)File: Form 3 - Sep-24_signed_compressed.pdf | 13 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 PALAI TOWER MAR 24.pdf | 17 Feb 2025 |
| Declaration in FORM BFile: Form B Affidavit Com Declaration.pdf | 12 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Annexure_signed_merged_compressed.pdf | 12 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 23 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: PT- Form 2a, Dec-2024.pdf | 23 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Decleration Pt_compressed.pdf | 17 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: PT Form 2A_updated.pdf | 12 Dec 2023 |
| Certificates of CA (Form 3)File: Form 3_compressed.pdf | 12 Dec 2023 |
| Declaration in FORM BFile: Affidavit Cum Decleration.pdf | 11 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Disclouser of Sold and Unsold.pdf | 11 Dec 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 8 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PT FORM 2 ENGINEERS_SEPT.pdf | 8 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: PT Form 2A.pdf | 8 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: PT Form 2A.pdf | 8 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 PALAI TOWER MAR 23.pdf | 8 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5_21.pdf | 2 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_22.pdf | 2 Nov 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 2327614_FurtherCC_signed.pdf | 23 Aug 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PT ARCHITECT CERTIFICATE.pdf | 23 Aug 2022 |
| Certificates of CA (Form 3)File: Form 3_Palai Tower-30-6-22_final.pdf | 23 Aug 2022 |
| Details of encumbrancesFile: P T.pdf | 18 Apr 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 N D.pdf | 12 Jul 2021 |
| Declaration about Commencement CertificateFile: Declaration about CC , Format D.pdf | 7 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: PALAI TOWERS Form 2A,.pdf | 7 Jul 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: PALAI TOWERS Form 2A,.pdf | 7 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: RERA Sale Sheet_compressed.pdf | 7 Jul 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 PA.pdf | 7 Jul 2021 |
| Certificates of CA (Form 3)File: Form 3 Palai Towers.pdf | 12 Nov 2019 |
| Certificates of CA (Form 5)File: FORM 5 PALAI TOWER.pdf | 8 Nov 2019 |
| Certificates of CA (Form 3)File: PALAI TOWERS (1).pdf | 23 Jul 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PT FORM 2.pdf | 18 Jul 2019 |
| Certificates of CA (Form 3)File: Palaitowers (2).pdf | 19 Jun 2019 |
| Certificates of CA (Form 3)File: Palaitowers (2).pdf | 19 Jun 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Palai Tower - Forrm 2.pdf | 5 Nov 2018 |
| Certificates of CA (Form 5)File: FORM 5 PALAI TOWER.pdf | 13 Oct 2018 |
| Certificates of CA (Form 3)File: PalaiTowers.pdf | 8 Oct 2018 |
| Certificates of CA (Form 3)File: FORM 5 PALAI TOWER.pdf | 1 Oct 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PALAI TOWERS, FORM-1.pdf | 11 Jul 2018 |
| Certificates of CA (Form 3)File: PALAI TOWERS - FORM 3.pdf | 11 Jul 2018 |
| Certificates of CA (Form 3)File: 04_18-19.pdf | 30 May 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: 2170319_furthercc_signed.PDF | 1 May 2018 |
| Layout approvalFile: Palai Tower_Amended Plan.pdf | 13 Apr 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 101 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep PALAI TOWERS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SV Road6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 394 registered projects within 2 km.
NIRLON EMPLOYEES COOPERATIVE HOUSING SOCIETY L
SHIVAM PARIVAR DEVELOPERS PVT LTD
GUNDECHA REXON SUITES PHASE 1
ANAYA INFRASTRUCTURE PVT LTD
AGARWAL FLORENCE
PARAM ANAND BUILDERS LLP
KRISHNA KUNJ PHASE 1
PRINCE HOUSING AND HOSPITALITY PRIVATE LIM
NIRLON EMPLOYEES CHS LTD BUILDING NO. 10
Shivam Parivar Developers Private Limited
Rishabraj Avyaana
RISHABRAJ ESTATE DEVELOPERS PRIVATE LIMITE
See every Mumbai Suburban project, with the district possession charts
Builder: N D DEVELOPERS
N D DEVELOPERS has 5 registrations on MahaRERA, including PALAI VILLAS and RATNA RESIDENCY. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if PALAI TOWERS is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PALAI TOWERS?
The registered promoter entity is N D DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PALAI TOWERS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against PALAI TOWERS?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for PALAI TOWERS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PALAI TOWERS?
The professionals named in the filing: Architect: GAJJAR AND ASSOCIATES; Engineer: gaurav nanda; Chartered Accountant: JRSM AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PALAI TOWERS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback