Home / Browse projects / Nashik, Maharashtra / Samruddhi Haripath
Samruddhi Haripath
RG-MH-66556 · RERA P51600048577 · Last updated on MahaRERA portal: 29 Oct 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 1 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Samruddhi Haripath is a Residential / Group Housing project by Samruddhi Realty in Nashik, Maharashtra, registered with MahaRERA as P51600048577 on 10 Jan 2023. The registration is recorded completed; possession was promised by 31 Dec 2027. 3 of the 16 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.
At a glance
Project
- NameSamruddhi Haripath
- TypeResidential / Group Housing
- Location
- Parijat Nagar
- Nashik (M Corp.)
- Nashik
- 422005
- Pincode422005
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600048577
- ReraGenie IDRG-MH-66556
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on10 Jan 2023
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed92 files
Current status
Figures as on 29 Oct 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Samruddhi Haripath | NA | 7 | 7 | 16 | 0 | 16 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
Samruddhi Haripath: 73% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 29 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed39
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Harishchandra Tatyaba Shelar | Kalyan | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | M/s Origin Architects |
| Engineer | Er Mahendra Shirsat |
| Engineer | Er Shailesh Dhumne |
| Engineer | Pravin Pawar |
| Chartered Accountant | CA Paresh Sabadra |
| Chartered Accountant | RSPH & Associates |
| Chartered Accountant | P N Sabadra and Associates |
| Chartered Accountant | CA Suchita Pawar |
| Partner | Role in project |
|---|---|
| Samruddhi Realty | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Nov 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Nov 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Nov 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed92
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2023-2024)File: Form 2A.pdf | 29 Oct 2025 |
| Occupational CertificateFile: FULL OCCUPANCY.pdf | 15 Oct 2025 |
| Form 1File: AR Cert Spt24.pdf | 11 Sep 2025 |
| Form 2File: ER Cert Sept 24.pdf | 11 Sep 2025 |
| Form 3File: CA Certificate Sept 24.pdf | 11 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure SEP 24.pdf | 11 Sep 2025 |
| Form 1File: AR Crt Jun 24.pdf | 11 Sep 2025 |
| Form 2File: ER Cert Jun 24.pdf | 11 Sep 2025 |
| Form 3File: CA Jun 24 Final.pdf | 11 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Jun 24.pdf | 11 Sep 2025 |
| Form 1File: Samruddhi Haripath Architect Certificate march 24.pdf | 11 Sep 2025 |
| Form 2File: Samruddhi Haripath Engineer Certificate march 24.pdf | 11 Sep 2025 |
| Form 3File: Samruddhi haripath CA cert March 24.pdf | 11 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Booked Disclosure march 24.pdf | 11 Sep 2025 |
| Form 1File: AR Signed _Sep 23.pdf | 11 Sep 2025 |
| Form 2File: ER Signed Copy_Sep 23.pdf | 11 Sep 2025 |
| Form 3File: CA Signed_ Sep 23.pdf | 11 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Sept 23.pdf | 11 Sep 2025 |
| Form 5 (FY 2022-2023)File: RERA Audit Signed Copy-22-23.pdf | 11 Sep 2025 |
| Form 5 (FY 2023-2024)File: RERA Audit Report-FY 2023-24 Final.pdf | 11 Sep 2025 |
| Form 1File: AR June 25.pdf | 21 Jul 2025 |
| Form 2File: ER june 25.pdf | 21 Jul 2025 |
| Form 3File: CA June 25 Final.pdf | 21 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold.pdf | 21 Jul 2025 |
| Form 1File: Architect Certificate.pdf | 21 Jul 2025 |
| Form 2File: Engineer Certificate.pdf | 21 Jul 2025 |
| Form 3File: Final CA Q4.pdf | 21 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure March 25.pdf | 21 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 8 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final CA Q4.pdf | 8 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 8 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 28 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 28 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure Certificate-1-2.pdf | 28 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure.pdf | 13 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: from 1.pdf | 5 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final CA cert.pdf | 5 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: from 2.pdf | 5 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Audit Report-FY 2023-24 Final.pdf | 12 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: SEP 24.pdf | 28 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Cert.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sept 24.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Cert.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Jun 24 Final Signed copy.pdf | 30 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arcer.pdf | 18 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ercert.pdf | 18 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: disclsr.pdf | 18 Jul 2024 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 12 Jul 2024 |
| Proforma of Agreement for saleFile: Agreement to Sale.pdf | 12 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Samruddhi Haripath Architect Certificate.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Samruddhi Haripath Engineer Certificate.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Booked Disclosure.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Signed.pdf | 20 Apr 2024 |
| Other - TechnicalFile: Form 2A.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Samruddhi relaty- Form 3 Final.pdf | 22 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Samruddhi Realty Form 1 Dec 2023.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Samruddhi Realty Form 2 Dec 2023.pdf | 20 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure-Dec 23.pdf | 20 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA Audit Signed Copy-22-23.pdf | 2 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Sold 01 (2 files merged).pdf | 25 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Signed _Sep 23.pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Signed Copy_Sep 23.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Signed_ Sep 23.pdf | 20 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: smaruddhi Arch Cert.pdf | 3 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: samruddhi ER Certificate.pdf | 3 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Samruddhi Realty CA certificate _Signed.pdf | 3 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR.pdf | 5 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER.pdf | 5 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: samrudhhi Realty CA Certificate Mar-2023-.pdf | 5 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.pdf | 5 Jan 2023 |
| Other - LegalFile: Title Report.pdf | 5 Jan 2023 |
| Other - LegalFile: CC_compressed.pdf | 5 Jan 2023 |
| Layout approvalFile: Plan.pdf | 30 Nov 2022 |
| Building plan approvalFile: Plan.pdf | 30 Nov 2022 |
| Details of encumbrances concerned to FinanceFile: EC-Finca.pdf | 30 Nov 2022 |
| Details of encumbrances concerned to LegalFile: EC-Finca.pdf | 30 Nov 2022 |
| Copy of Layout Approval (in case of layout)File: Plan.pdf | 30 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan.pdf | 30 Nov 2022 |
| Declaration in FORM BFile: Form B Developers.pdf | 30 Nov 2022 |
| CERSAI detailsFile: CERSAI Search Report.pdf | 30 Nov 2022 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SAMRUDDHI GARDENP51600026144 | COLLEGE ROAD, Nashik | Aug 2020 | Completed | Sep 2023 | Jan 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 92 filed documents as one ZIP, foldered, with a manifest
Keep Samruddhi Haripath on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Parijat Nagar4,100+ in Nashik
Filed coordinates, straight-line distance. 134 registered projects within 2 km.
SHREEJI EXCELENCIA
SHREEJI DEVELOPERS
HARI VASANT
Hari Vasant Association of Allottees
NATHSEETA YEOLEKAR COMPLEX
DEEPAK INFRA AND HOMES PRIVATE LIMITED
Aaradhya Nakshatra
SHREYASH BUILDCON
Shri Ram Kunj
shree balaji developers
SAI COURT
JAY WIN DEVELOPERS
See every Nashik project, with the district possession charts
Builder: Samruddhi Realty
SAMRUDDHI REALTY has 2 registrations on MahaRERA, including SAMRUDDHI GARDEN and Samruddhi Haripath. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if Samruddhi Haripath is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Samruddhi Haripath?
The registered promoter entity is Samruddhi Realty, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Samruddhi Haripath?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Samruddhi Haripath?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Samruddhi Haripath?
The professionals named in the filing: Architect: M/s Origin Architects; Engineer: Er Mahendra Shirsat; Engineer: Er Shailesh Dhumne; Engineer: Pravin Pawar; Chartered Accountant: CA Paresh Sabadra; Chartered Accountant: RSPH & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Samruddhi Haripath?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback