ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Samriddhi Garden Wing C Gulmohar Wing D Deodhar

Registration lapsed No litigation declared Residential / Group Housing project

Samriddhi Garden Wing C Gulmohar Wing D Deodhar

By SIVANA REALTY PRIVATE LIMITED

RG-MH-25133 · RERA P51800009515 · Last updated on MahaRERA portal: 5 Aug 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 12 months past the filed date
  • 6 complaints at MahaRERA
  • Completion date moved by 61 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Oct 2025Possession promised12 months past this date
6Complaints at MahaRERAon this registration
Jump to the 61 documents Report an error

Samriddhi Garden Wing C Gulmohar Wing D Deodhar is a Residential / Group Housing project by SIVANA REALTY PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800009515 on 22 Aug 2017. Possession was promised by 31 Oct 2025 and is now 12 months past that date. The completion date has moved by 61 months from the original filing. 6 complaints are on record with the regulator.

At a glance

Project

  • NameSamriddhi Garden Wing C Gulmohar Wing D Deodhar
  • TypeResidential / Group Housing
  • Location
    • Kurla
    • Mumbai Suburban
    • 400078
  • Pincode400078
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800009515
  • ReraGenie IDRG-MH-25133

Builder

  • NameSIVANA REALTY PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsMANISH KAMALKISHORE KABRA, GOURAV JAIGOPAL KABRA

Key dates

12 months past promisethis monthRegisteredAug 2017First promiseSep 2020Revised toOct 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on22 Aug 2017
  • Promised completion31 Oct 2025
  • Revised completionRevised to 31 Oct 2025 (originally 30 Sep 2020)
  • Buildings2 building records
  • Documents filed61 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING C GULMOHARNA250000
WING D DEODHARNA250000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 5 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

WING C GULMOHARNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
WING D DEODHARNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities17

As on 5 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes70%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes50%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
Community BuildingNoNot applicable
CLUBHOUSEYes75%

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
WING C GULMOHAR11
WING D DEODHAR11

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,952 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI12671.86
Proposed, not sanctioned10,905 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchARUNODAY BUILDING C D BARFIWALA ROAD MUMBAI 400058

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
SIVANA REALTY PRIVATE LIMITED-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800019790Sep 2020 → Mar 2025

Reason as filed by the promoterThis Project along with the Company has been awarded to us by NCLT vide its Order dated 19.07.2023, The Project was delayed due to the previous owners not fulfilling there commitment. we shall be completing the Project by 31.03.2025.

EXT51800028260Sep 2020 → Oct 2025

Reason as filed by the promoterLIFT WORK IN D WING OF 2 LIFTS IS BALANCE WHICH IS EXPECTED TO BE COMPLETED IN 2 MONTHS

Complaints filed with MahaRERA6

Case no.ComplainantRespondentFiled
CC0060000000788721) Kailas Shamji Veera (1(a) Ritesh Kailas Veera. 1(b) Urvee Kailas Veera.)& 2) Jyotsna Kailas VeeraM/s Sunshine Housing Private Limited07/05/2019
CC006000000089766DR GIRISH KALYANJI SHAH , ANKUSH KISHORE SHAH AND GRISHMA ANKUSH SHAHSUNSHINE HOUSING PVT LTD01/07/2019
CC006000000171564Vaibhavi Prabhakar PawarKashyap Kanaiyalal Mehta17/11/2019
CC006000000193196Rajesh BhakadeKashyap kanaiyalal mehta08/05/2020
CC006000000500406Nihir K VoraSivana Realty Private Limited09/05/2024
CC006000000500606Darshan Shantilal SavlaKabra Estate and Investments Consultants29/05/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed61

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1.pdf5 Aug 2025
Form 2File: Form 2Upload.pdf5 Aug 2025
Form 3File: Form 3Upload.pdf5 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold Upload.pdf5 Aug 2025
Declaration in FORM BFile: FORM B Upload.pdf2 May 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inv Upload.pdf2 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Upload.pdf23 Apr 2025
Certificates of CA (Form 3)File: FORM 3 Upload.pdf23 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Upload.pdf23 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1_compressed.pdf13 Mar 2025
Certificates of CA (Form 3)File: Form 3.pdf7 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf7 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1.pdf30 Oct 2024
Certificates of CA (Form 3)File: Form3.pdf30 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2.pdf30 Oct 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Change Declaration.pdf3 Jul 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Legal.pdf26 Jun 2024
Details of encumbrances concerned to LegalFile: Encumbrance Legal.pdf26 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Directors.pdf26 Jun 2024
Proforma of Agreement for saleFile: Agreement for Sale.pdf26 Jun 2024
Proforma of Allotment letterFile: Allotment Letter_compressed.pdf26 Jun 2024
Deviation Report with respect to Allotment letterFile: Deviation Allotment.pdf26 Jun 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Agreement.pdf26 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Annexure A_Declaration.pdf25 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Self Declaration.pdf25 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Letter.pdf7 Jun 2024
Declaration about Commencement CertificateFile: Declaration of CC FORMAT - D.pdf31 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold,Booked InventoryBuilding Wise_compressed.pdf31 May 2024
CERSAI detailsFile: CERSAI Letter.pdf31 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration Bank FORMAT A.pdf31 May 2024
Declaration in FORM BFile: Form B Declaration.pdf29 May 2024
Declaration in FORM BFile: Annexure A_Declaration.pdf29 May 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Revalidate NoteSheet_16575_signed.pdf16 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf16 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf16 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf16 May 2024
Certificates of CA (Form 3)File: Form 3.pdf16 May 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - July - compressed.pdf28 Feb 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2- Oct - compressed.pdf28 Feb 2019
Certificates of CA (Form 3)File: SAMRIDDHI C D CA CERT MAR 18.pdf15 Oct 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: 12 Name Reservation of Society C wing.pdf27 Apr 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: 11 Name Reservation of Society D wing.pdf27 Apr 2018
Commencement Certificates / NA Order for plotted developmentFile: CC SAMRIDDHI.pdf22 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Samriddhi Garden wing C - D.pdf31 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate-Samriddhi C - D.pdf31 Jan 2018
Certificates of CA (Form 3)File: CA CERTIFICATE SAMRIDDHI CD DEC 17.pdf31 Jan 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE SAMRIDDHI C D SEP 17.pdf31 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate SAMRIDDHI CD sep 2017.pdf28 Oct 2017
Certificates of CA (Form 3)File: CA CERTIFICATE SAMRIDDHI CD SEP 17.pdf28 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: C D Engineers Certificate.pdf28 Jul 2017
Certificates of CA (Form 3)File: for upload SHPL CA CERTIFICATE SAMRIDDHI GARDENS C AND D WING 27072017.pdf28 Jul 2017
Proforma of Allotment letterFile: Decleration_SHPL FOR SALE AGREEMENT.pdf28 Jul 2017
Layout approvalFile: Approved Layout Plan.pdf27 Jul 2017
Building plan approvalFile: I O D_Samriddhi Garden.pdf27 Jul 2017
PAN CardFile: SHPL PAN CARD.pdf27 Jul 2017
Copy of the legal title reportFile: TITLE SAMRIDDHI GARDEN1.pdf27 Jul 2017
Details of encumbrancesFile: C AND D ENCUMBRENCE CERTIFICATE.pdf27 Jul 2017
Copy of Layout Approval (in case of layout)File: Approved Layout Plan.pdf27 Jul 2017
Building Plan Approval (IOD)File: I O D_Samriddhi Garden.pdf27 Jul 2017
Declaration in FORM BFile: For Upload FORM-B-SAMRIDDHI C D.pdf27 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE BY VG.pdf27 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 61 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Samriddhi Garden Wing C Gulmohar Wing D Deod on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kurla6,700+ in Mumbai Suburban

2 kmSamriddhi Garden Wing C Completed 48Lapsed / revoked 25Other 73Dot size: filed unitsN

Filed coordinates, straight-line distance. 146 registered projects within 2 km.

Builder: SIVANA REALTY PRIVATE LIMITED

SIVANA REALTY PRIVATE LIMITED has 1 registration on MahaRERA, including Samriddhi Garden Wing C Gulmohar Wing D Deodhar. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Samriddhi Garden Wing C Gulmohar Wing D Deodhar shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Samriddhi Garden Wing C Gulmohar Wing D Deodhar is delayed beyond 31 Oct 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Samriddhi Garden Wing C Gulmohar Wing D Deodhar?

The registered promoter entity is SIVANA REALTY PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Samriddhi Garden Wing C Gulmohar Wing D Deodhar?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Samriddhi Garden Wing C Gulmohar Wing D Deodhar?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Samriddhi Garden Wing C Gulmohar Wing D Deodhar?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Samriddhi Garden Wing C Gulmohar Wing D Deodhar?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Samriddhi Garden Wing C Gulmohar Wing D Deodhar. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Samriddhi Garden Wing C Gulmohar Wing D Deod to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.