Home / Browse projects / SAMRADNI PRESTIGE
SAMRADNI PRESTIGE
RG-MH-14237 · RERA P51600031501 · Last updated on MahaRERA portal: 21 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 15 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SAMRADNI PRESTIGE is a Residential / Group Housing project by ABHISHEK ANNASAHEB GADAKH in SINNER NASHIK MAHARASHTRA, 422103, registered with MahaRERA as P51600031501 on 25 Oct 2021. Possession is promised by 31 Mar 2027. The completion date has moved by 15 months from the original filing. 16 of the 20 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.
At a glance
Project
- NameSAMRADNI PRESTIGE
- TypeResidential / Group Housing
- Location
- PLOT NO 14 AND 15 SURVEY NO 179(175) SINNER NASHIK
- SINNER NASHIK MAHARASHTRA
- 422103
- Pincode422103
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600031501
- ReraGenie IDRG-MH-14237
Builder
- NameABHISHEK ANNASAHEB GADAKH
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on25 Oct 2021
- Promised completion31 Mar 2027
- Revised completionRevised to 31 Mar 2027 (originally 31 Dec 2025)
- Buildings1 building record
- Documents filed79 files
Current status
Figures as on 21 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SAMRADNI PRESTIGE | NA | 6 | 6 | 20 | 0 | 20 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 21 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
SAMRADNI PRESTIGE: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 21 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed26
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SUKDEO PANDURANG SATPUTE | - | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SAMRADNI PRESTIGE | NA | Rs 1.69 cr | Rs 1.66 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | NISHANT MAHESHWARI |
| Engineer | NISHANT MAHESHWARI |
| Chartered Accountant | SANDEEP CHAVANKE |
| Chartered Accountant | SAHEBRAO DADAJI PAWAR |
| Partner | Role in project |
|---|---|
| ABHISHEK ANNASAHEB GADAKH | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe delay in completion of the project is mainly due to administrative delays caused by the Nashik Municipal Corporation (NMC) election, which resulted in slow processing of approvals, inspections, and documentation. These factors affected the overall project timeline and completion schedule. As of date, the project is 98% complete. All superstructure slabs and internal wall works have been fully completed. The balance works, including lift installation, final colour coat, and electrical meter installation, are pending and are expected to be completed upon receipt of the remaining approvals an
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Oct 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Oct 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 13 Oct 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2027
Documents filed79
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 21 Jul 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 21 Jul 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 21 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 31032026.pdf | 20 May 2026 |
| Withdrawal Update Form 2File: Form 2 31032026.pdf | 20 May 2026 |
| Withdrawal Update Form 3File: form 3.pdf | 20 May 2026 |
| Withdrawal Update Form 1File: FORM 1 31-12-2025.pdf | 17 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2 31-12-2025.pdf | 17 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3 31-12-2025.pdf | 17 Jan 2026 |
| Form 5 (FY 2024-2025)File: FORM 5 ABHISHEK GADAKH 31032025.pdf | 31 Dec 2025 |
| Form 1File: Form 1.pdf | 28 Oct 2025 |
| Form 2File: Form 2.pdf | 28 Oct 2025 |
| Form 3File: form 3.pdf | 28 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure.pdf | 28 Oct 2025 |
| Form 1File: form 1.pdf | 23 Jul 2025 |
| Form 2File: FORM 2.pdf | 23 Jul 2025 |
| Form 3File: Form 3.pdf | 23 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD AND BOOKED INVENTORY.pdf | 23 Jul 2025 |
| Self-declaration of Quarterly ProgressFile: Self Declaration of QPR 31032025.pdf | 23 Jul 2025 |
| Form 1File: Form 1.pdf | 23 Jul 2025 |
| Form 2File: Form 2.pdf | 23 Jul 2025 |
| Form 3File: Form3.pdf | 23 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD AND BOOKED INVENTORY 30062025.pdf | 23 Jul 2025 |
| Self-declaration of Quarterly ProgressFile: Self Declaration of QPR 30062025.pdf | 23 Jul 2025 |
| Form 2A (FY 2024-2025)File: Form 2A.pdf | 23 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 16 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 16 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 16 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 30062024.pdf | 16 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 30092024.pdf | 16 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 31122024.pdf | 16 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 16 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 16 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 16 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5.pdf | 27 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf | 27 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 3 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 3 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 3 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 3 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 3 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 3 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 3 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 3 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 3 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 3 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A.pdf | 3 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf | 3 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 30 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 30 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 30 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 30 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 30 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5.pdf | 30 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5.pdf | 30 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - 3.pdf | 15 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 2 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 2 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A.pdf | 2 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf | 2 Feb 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE (1).pdf | 23 Oct 2021 |
| Declaration about Commencement CertificateFile: FORM D.pdf | 23 Oct 2021 |
| Building plan approvalFile: BUILDING PLAN.pdf | 13 Oct 2021 |
| Layout approvalFile: AUTHORISED PLOT LAYOUT (1).pdf | 13 Oct 2021 |
| Layout approvalFile: AUTHORISED PLOT LAYOUT (2).pdf | 13 Oct 2021 |
| Layout approvalFile: AUTHORISED PLOT LAYOUT (3).pdf | 13 Oct 2021 |
| PAN CardFile: PAN ABHISHEK.pdf | 13 Oct 2021 |
| Copy of the legal title reportFile: LEGAL TITLE SEARCH REPORT.pdf | 13 Oct 2021 |
| Details of encumbrancesFile: ENCUMBERANCE LETTER.pdf | 13 Oct 2021 |
| Copy of Layout Approval (in case of layout)File: AUTHORISED PLOT LAYOUT (1).pdf | 13 Oct 2021 |
| Copy of Layout Approval (in case of layout)File: AUTHORISED PLOT LAYOUT (2).pdf | 13 Oct 2021 |
| Copy of Layout Approval (in case of layout)File: AUTHORISED PLOT LAYOUT (3).pdf | 13 Oct 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN.pdf | 13 Oct 2021 |
| Declaration in FORM BFile: FORM B ABHISHEK.pdf | 13 Oct 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 13 Oct 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 13 Oct 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 13 Oct 2021 |
| Proforma of Allotment letterFile: PROFARMA OF ALLOTMENT.pdf | 13 Oct 2021 |
| Proforma of Allotment letterFile: Draft of Agreement-for-sale.pdf | 13 Oct 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 79 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SAMRADNI PRESTIGE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SINNER NASHIK MAHARASHTRA
Filed coordinates, straight-line distance. 33 registered projects within 2 km.
SAI ANAND PRIDE-B
DEEPAK KALYANJI CHANDE
VEDANT AANANDVAN
GORAKSHNATH DASHRATH MHASKE
AVADHOOT HIGH CITY PHASE 1
Avadhoot Developers
Ramtek Ayodhya
Shinde Construction
SHREE SHANKAR ENCLAVE
Akash Anilkumar Bumb
SHREE GANESH EMPIRE
SHREE GANESH CONSTRUCTION
Builder: ABHISHEK ANNASAHEB GADAKH
ABHISHEK ANNASAHEB GADAKH has 1 registration on MahaRERA, including SAMRADNI PRESTIGE. Its filings disclose no earlier MahaRERA projects. Read the full track record.
Frequently asked questions
What are my rights if SAMRADNI PRESTIGE is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SAMRADNI PRESTIGE?
The registered promoter entity is ABHISHEK ANNASAHEB GADAKH, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SAMRADNI PRESTIGE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SAMRADNI PRESTIGE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SAMRADNI PRESTIGE?
The professionals named in the filing: Architect: NISHANT MAHESHWARI; Engineer: NISHANT MAHESHWARI; Chartered Accountant: SANDEEP CHAVANKE; Chartered Accountant: SAHEBRAO DADAJI PAWAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SAMRADNI PRESTIGE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback