SAMARTHA GAURAV
By SAMARTHA DEVELOPMENT CORPORATION
RG-MH-86714 · RERA P51800018812 · Last updated on MahaRERA portal: 22 Apr 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 24 months past the filed date
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SAMARTHA GAURAV is a Residential / Group Housing project by SAMARTHA DEVELOPMENT CORPORATION in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800018812 on 5 Dec 2018. Possession was promised by 30 Oct 2024 and is now 24 months past that date. 1 complaint is on record with the regulator.
At a glance
Project
- NameSAMARTHA GAURAV
- TypeResidential / Group Housing
- Location
- 120 FT WIDE DP ROAD
- OSHIWARA
- Andheri
- Mumbai Suburban
- 400053
- Pincode400053
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800018812
- ReraGenie IDRG-MH-86714
Builder
- NameSAMARTHA DEVELOPMENT CORPORATION
- Entity typePartnership
- PartnerVIKAS KAMLAKAR WALAWALKAR
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on5 Dec 2018
- Promised completion30 Oct 2024
- Revised completionNone
- Buildings3 building records
- Documents filed74 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SAMARTHA GAURAV A WING | NA | 23 | 0 | 0 | 0 | 0 |
| SAMARTHA GAURAV B WING | NA | 16 | 0 | 0 | 0 | 0 |
| SAMARTHA GURAV C WING | NA | 14 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 22 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
30 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.
SAMARTHA GAURAV A WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
SAMARTHA GAURAV B WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
SAMARTHA GURAV C WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 22 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed109
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| SAMARTHA GAURAV A WING | 11 | 36 | 47 |
| SAMARTHA GAURAV B WING | 11 | 22 | 33 |
| SAMARTHA GURAV C WING | 11 | 18 | 29 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AJIT C GUPTE |
| Engineer | GIREESH M RAJADHYAKSHA |
| Partner | Role in project |
|---|---|
| SAMARTHA DEVELOPMENT CORPORATION | - |
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 802/2013 | BOMBAY HIGH COURT | FRAMING ISSUES |
| 46/2014 | BOMBAY HIGH COURT | FRAMING ISSUES |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000197896 | KALPVRUKSH DEVELOPERS | SAMARTHA DEVELOPMENT CORPORATION | 06/08/2021 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Aug 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Aug 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 1 Dec 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 1 Dec 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed74
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Architects Certificate_March 2025.pdf | 22 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3_CA Certificate_March 2025.pdf | 22 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineers Certificate_March 2025.pdf | 22 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold-unsold inventory_March 2025.pdf | 22 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_23-24_S Gaurav.pdf | 6 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A_Certificate_2022.pdf | 28 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Certificate_2023.pdf | 28 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_Certificate for quality assurance.pdf | 19 Jun 2024 |
| Declaration in FORM BFile: Form B Affidavit_compressed.pdf | 30 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 _ Architects Certificate.pdf | 30 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_Engineers Certificate.pdf | 30 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold_Booked Inventory.pdf | 30 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22-23.pdf | 30 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_2021-2022.pdf | 7 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - Quality assurance certificate.pdf | 13 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold_Booked Inventory SDC_compressed.pdf | 13 Apr 2022 |
| Declaration about Commencement CertificateFile: Declaration for Commencement Certificate.pdf | 11 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_June 21_compressed.pdf | 11 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Sept 21_compressed.pdf | 11 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Dec 21_compressed.pdf | 11 Apr 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form_2_June 2021.pdf | 11 Apr 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form_2_September 2021.pdf | 11 Apr 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form_2_December 2021.pdf | 11 Apr 2022 |
| CERSAI detailsFile: CERSAI_Search_Report.pdf | 11 Apr 2022 |
| Certificates of CA (Form 3)File: Form 3 March 19_compressed.pdf | 11 Apr 2022 |
| Certificates of CA (Form 3)File: Form 3 March 2020_compressed.pdf | 11 Apr 2022 |
| Certificates of CA (Form 3)File: Form 3 March 2021_compressed.pdf | 11 Apr 2022 |
| Certificates of CA (Form 3)File: Form 3 June 21_compressed.pdf | 11 Apr 2022 |
| Certificates of CA (Form 3)File: Form 3 Sep 21_compressed.pdf | 11 Apr 2022 |
| Certificates of CA (Form 3)File: Form 3 Dec 21_compressed.pdf | 11 Apr 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5-20-21_compressed.pdf | 11 Apr 2022 |
| Details of encumbrancesFile: Details of encumbrances.pdf | 17 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 _2019-2020.pdf | 6 Feb 2021 |
| Building plan approvalFile: Further amended IOD Plans_Sept,2020.pdf | 1 Dec 2020 |
| Building plan approvalFile: Amended IOD letter_Sept,2020.pdf | 1 Dec 2020 |
| Building Plan Approval (IOD)File: Further amended IOD Plans_Sept,2020.pdf | 1 Dec 2020 |
| Building Plan Approval (IOD)File: Amended IOD letter_Sept,2020.pdf | 1 Dec 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: Further CC - Nov, 2020.pdf | 1 Dec 2020 |
| OtherFile: Structural Engineer's certificate for 21 floors.pdf | 1 Dec 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A_Dec,2019.pdf | 6 Jan 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 _ 18-19.pdf | 31 Oct 2019 |
| Building plan approvalFile: Amended plans - I (1-4)_.pdf | 14 Aug 2019 |
| Building plan approvalFile: Amended plans - II (5-8)_.pdf | 14 Aug 2019 |
| Building plan approvalFile: IOD Letter_.pdf | 14 Aug 2019 |
| Building Plan Approval (IOD)File: Amended plans - I (1-4)_.pdf | 14 Aug 2019 |
| Building Plan Approval (IOD)File: Amended plans - II (5-8)_.pdf | 14 Aug 2019 |
| Building Plan Approval (IOD)File: IOD Letter_.pdf | 14 Aug 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Re-endorsed CC.pdf | 10 Aug 2019 |
| OtherFile: Stay vacating order in PIL.pdf | 30 Jul 2019 |
| OtherFile: Status quo order in PIL.pdf | 6 Jul 2019 |
| OtherFile: Form No 2A.pdf | 29 Mar 2019 |
| Building plan approvalFile: Readable plan.pdf | 21 Nov 2018 |
| Building Plan Approval (IOD)File: Readable plan.pdf | 21 Nov 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: REVALIDATION OF CC.pdf | 21 Nov 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: REVALIDATION OF CC.pdf | 21 Nov 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: ARCHITECT CERTIFICATE.pdf | 21 Nov 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERING CERTIFICATE.pdf | 21 Nov 2018 |
| Certificates of CA (Form 3)File: Certificate of CA Form 3.pdf | 21 Nov 2018 |
| OtherFile: NGT Order.pdf | 21 Nov 2018 |
| Proforma of Allotment letterFile: Agreement.pdf | 30 Oct 2018 |
| PAN CardFile: PAN - SDC.pdf | 20 Oct 2018 |
| Building plan approvalFile: IOD.pdf | 30 Aug 2018 |
| Layout approvalFile: IOD PLANS NEW.pdf | 30 Aug 2018 |
| Copy of the legal title reportFile: Title Report.pdf | 30 Aug 2018 |
| Details of encumbrancesFile: Self Decl reg encumbrances.pdf | 30 Aug 2018 |
| Copy of Layout Approval (in case of layout)File: IOD PLANS NEW.pdf | 30 Aug 2018 |
| Building Plan Approval (IOD)File: IOD.pdf | 30 Aug 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 30 Aug 2018 |
| Declaration in FORM BFile: Form B - Affidavit cum Declaration.pdf | 30 Aug 2018 |
| OtherFile: MCGM's stop work notice.pdf | 30 Aug 2018 |
| OtherFile: MCGM's stopp work notice withdrawal letter.pdf | 30 Aug 2018 |
| OtherFile: MCZMA's stop work order.pdf | 30 Aug 2018 |
| OtherFile: MCZMA permission-2011-ilovepdf-compressed.pdf | 30 Aug 2018 |
| OtherFile: MCZMA permission-2017-ilovepdf-compressed.pdf | 30 Aug 2018 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SAMARTHA SIDDHI | OPP. JOGGERS PARK SWAMI SAMARTHA NAGAR ANDHERI WEST MUMBAI 400 053 | 48 | Completed | Mar 2016 | Mar 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 74 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep SAMARTHA GAURAV on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near OSHIWARA6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 136 registered projects within 2 km.
LIVSMART KURLA
D. K. REALTY (INDIA) PVT. LTD.
MOONGIPA ARCADE
MOONGIPA REALTY PRIVATE LIMITED
LINKBAY RESIDENCES PHASE I
PORTSMOUTH BUILDCON PRIVATE LIMITED
Purva Estrella
Puravankara Ltd
78 LAKE TOWN
ANIRDESH DEVELOPERS PRIVATE LIMITED
Transcon Triumph Tower 2
Transcon Triumph Phase 2 Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: SAMARTHA DEVELOPMENT CORPORATION
SAMARTHA DEVELOPMENT CORPORATION has 1 registration on MahaRERA, including SAMARTHA GAURAV. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that SAMARTHA GAURAV shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SAMARTHA GAURAV is delayed beyond 30 Oct 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SAMARTHA GAURAV?
The registered promoter entity is SAMARTHA DEVELOPMENT CORPORATION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SAMARTHA GAURAV?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SAMARTHA GAURAV?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SAMARTHA GAURAV?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SAMARTHA GAURAV?
The professionals named in the filing: Architect: AJIT C GUPTE; Engineer: GIREESH M RAJADHYAKSHA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SAMARTHA GAURAV?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback