Home / Browse projects / Mumbai Suburban, Maharashtra / SAMARTH GARDEN WINGS F AND G
SAMARTH GARDEN WINGS F AND G
RG-MH-20326 · RERA P51800009013 · Last updated on MahaRERA portal: 3 Sep 2021
Source: official MahaRERA filing
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 47 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SAMARTH GARDEN WINGS F AND G is a Residential / Group Housing project by S.A.Developers in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800009013 on 19 Aug 2017. The registration is recorded completed; possession was promised by 30 Nov 2021. The completion date has moved by 47 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NameSAMARTH GARDEN WINGS F AND G
- TypeResidential / Group Housing
- Location
- DATTA MANDIR ROAD
- BHANDUP (W)
- Kurla
- Mumbai Suburban
- 400078
- Pincode400078
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800009013
- ReraGenie IDRG-MH-20326
Builder
- NameS.A.Developers
- Entity typePartnership
- PartnersDHANSUKH HARIDAS NANDA, CHINMAY ARVIND SAWANT, PARAG PRAKSAH WAGH, PRADNESH PRAKASH SHIRWADKAR, BHARTI DHANSUKH NANDA, ASHISH KANMAL JAIN, HARILAL BHANJI PATEL, HANSA HARISH BHANUSHALI, POOJA DILIP SAWANT, HARISH THAKARSHI BHANUSHALI, KANMAL ANRAJ JAIN, DHILEN HARILAL PATEL and 6 more
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on19 Aug 2017
- Promised completion30 Nov 2021
- Revised completionRevised to 30 Nov 2021 (originally 31 Dec 2017)
- Buildings1 building record
- Documents filed57 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SAMARTH GARDEN WINGS F AND G | NA | 24 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 3 Sep 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
SAMARTH GARDEN WINGS F AND G: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities17
As on 3 Sep 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
| Club House | Yes | 0% |
| MECHANISED PARKING SYSTEM | Yes | 50% |
Parking filed146
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RAMESH DAVI AND ASSOCIATES |
| Engineer | SHANTI CONSULTANTS |
| Engineer | N S LELE AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| S.A.Developers | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe building has been complete in all sense and also most of the allotees have taken the possession of their respective flats in the year 2017. The building have got the Occupancy Certificate till 15th floor and 17th floor for G and F wing respectively in the year 2017. But, due to some unavoidable reason, the competent authority has not yet given the remaining occupancy certificate till date, which have been informed to the allotees as well. To acquire the Occupancy Certificate and to register few remaining flats, we urge you to kindly grant us the extension for 6 months from now. In such fin
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 160/2017 | NATIONAL GREEN TRIBUNAL PUNE | PENDING |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000056272 | Kiran Krishna Shetty | M/s S.A. Developers | 21/09/2018 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 19 Nov 2020
Documents filed57
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Disclosure of sold/ booked inventoryFile: SA Developers.pdf | 3 Sep 2021 |
| Certificates of CA (Form 3)File: Form 3 Samarth Wings F and G June 21.pdf | 27 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 SA Developers FY 20-21.pdf | 26 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Certificate 086 (1) (1).pdf | 26 Aug 2021 |
| Declaration about Commencement CertificateFile: SA_Developers_declaration_certificate.pdf | 23 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: document(123).pdf | 19 Nov 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: document(124).pdf | 19 Nov 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: document(123).pdf | 19 Nov 2020 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: document(122).pdf | 19 Nov 2020 |
| Certificates of CA (Form 5)File: RERA_Audit_Report-Form_5_19-20.pdf | 9 Oct 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificates of Engineer 31122018.pdf | 10 Jul 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Cerificate of Engineer 31032019.pdf | 10 Jul 2019 |
| Certificates of CA (Form 3)File: CA Certificate 31122018.pdf | 10 Jul 2019 |
| Certificates of CA (Form 3)File: CA Certificate 31032019.pdf | 10 Jul 2019 |
| Certificates of Architect (Form 4)File: Certificate of Architect 31122018.pdf | 10 Jul 2019 |
| Certificates of Architect (Form 4)File: Certificate of Architect 31032019.pdf | 10 Jul 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate of Architect 31122018.pdf | 6 May 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Certificate of Architect 31032019.pdf | 6 May 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificates of Engineer 31122018.pdf | 6 May 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificate of Engineers 31032019.pdf | 6 May 2019 |
| Certificates of CA (Form 3)File: CERTIFICATE OF CA (FORM 3).pdf | 29 Nov 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificates of Engineer (Form 2).PDF | 21 Nov 2018 |
| Certificates of Architect (Form 4)File: Certificates of Architect (Form 4).pdf | 21 Nov 2018 |
| Certificates of CA (Form 3)File: CA certificate30062018.pdf | 30 Sep 2018 |
| Certificates of CA (Form 5)File: RERA_Form_5_Scan.pdf | 30 Sep 2018 |
| Certificates of CA (Form 5)File: RERA_Form_5_Scan.pdf | 30 Sep 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate 30062018.pdf | 20 Sep 2018 |
| Certificates of CA (Form 3)File: CA certificate30062018.pdf | 20 Sep 2018 |
| Certificates of Architect (Form 4)File: Architect certificate 30062018.pdf | 20 Sep 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERT RERA31032018 (1) COMPRESSED.pdf | 9 May 2018 |
| Certificates of CA (Form 3)File: CA CERT RERA31032018.pdf | 9 May 2018 |
| Certificates of Architect (Form 4)File: ARCH CERT RERA31032018.pdf | 9 May 2018 |
| OtherFile: PART OC COPY DT 28032018.pdf | 6 May 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CERTIFICATE OF ARCHITECT(FORM 1).pdf | 26 Jan 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CERTICATE OF ENGINEER (FORM 2).PDF | 26 Jan 2018 |
| Certificates of CA (Form 3)File: CERTIFICATE OF CA (FORM3).pdf | 26 Jan 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA Arch Certi 05-10-2017.pdf | 5 Dec 2017 |
| Certificates of CA (Form 3)File: CERTIFICATE OF CA.pdf | 5 Dec 2017 |
| Certificates of CA (Form 5)File: CERTIFICATE OF CA.pdf | 5 Dec 2017 |
| Certificates of Architect (Form 4)File: RERA Arch Certi 05-10-2017.pdf | 5 Dec 2017 |
| OtherFile: NGT APPLICATION.pdf | 5 Dec 2017 |
| Building plan approvalFile: IOD RERA.pdf | 30 Jul 2017 |
| Building plan approvalFile: AMENDED PLAN.pdf | 30 Jul 2017 |
| Layout approvalFile: LAYOUT.pdf | 30 Jul 2017 |
| PAN CardFile: PAN CARD.pdf | 30 Jul 2017 |
| Copy of the legal title reportFile: TITLE CERT.pdf | 30 Jul 2017 |
| Details of encumbrancesFile: Encumbrances certi.pdf | 30 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: LAYOUT.pdf | 30 Jul 2017 |
| Building Plan Approval (IOD)File: IOD RERA.pdf | 30 Jul 2017 |
| Building Plan Approval (IOD)File: AMENDED PLAN.pdf | 30 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: CC COPY.pdf | 30 Jul 2017 |
| Declaration in FORM BFile: Affidavit.pdf | 30 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT'S CERTIFICATE.pdf | 30 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGINEER'S CERTIFICATE.pdf | 30 Jul 2017 |
| Certificates of CA (Form 3)File: CHARTERED ACCOUNTANT'S CERTIFICATE.pdf | 30 Jul 2017 |
| Proforma of Allotment letterFile: agreement.pdf | 30 Jul 2017 |
| OtherFile: EC.pdf | 30 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 57 filed documents as one ZIP, foldered, with a manifest
Keep SAMARTH GARDEN WINGS F AND G on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BHANDUP (W)6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 249 registered projects within 2 km.
Runwal Forests Tower 9 - 11
Wheelabrator Alloy Castings Limited
SHRADDHA VARDAAN
SHRADDHA LANDMARK PRIVATE LIMITED
SHRADDHA EVOQUE
SHRADDHA LANDMARK PRIVATE LIMITED
Sugee Vaayu
Sugee Developers Private Limited
SHRADDHA CLASSIC
SHRADDHA LANDMARK PRIVATE LIMITED
Om Siddhivinayak CHS Ltd
Shree Shiv Samarth Reality
See every Mumbai Suburban project, with the district possession charts
Builder: S.A.Developers
S.A.Developers has 1 registration on MahaRERA, including SAMARTH GARDEN WINGS F AND G. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if SAMARTH GARDEN WINGS F AND G is delayed beyond 30 Nov 2021?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SAMARTH GARDEN WINGS F AND G?
The registered promoter entity is S.A.Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SAMARTH GARDEN WINGS F AND G?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SAMARTH GARDEN WINGS F AND G?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SAMARTH GARDEN WINGS F AND G?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SAMARTH GARDEN WINGS F AND G?
The professionals named in the filing: Architect: RAMESH DAVI AND ASSOCIATES; Engineer: SHANTI CONSULTANTS; Engineer: N S LELE AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SAMARTH GARDEN WINGS F AND G?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback