Home / Browse projects / Mumbai Suburban, Maharashtra / SAMARTH AURA PHASE -2

Completed No litigation declared Residential / Group Housing project

SAMARTH AURA PHASE -2

By SHREE ASHAPURA COMBINE

RG-MH-50055 · RERA P51800050555 · Last updated on MahaRERA portal: 21 Sep 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Apr 2028Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 0%
48 of 84Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 147 documents Report an error

SAMARTH AURA PHASE -2 is a Residential / Group Housing project by SHREE ASHAPURA COMBINE in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800050555 on 21 Apr 2023. The registration is recorded completed; possession was promised by 30 Apr 2028. The completion date has moved by 4 months from the original filing. 36 of the 84 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSAMARTH AURA PHASE -2
  • TypeResidential / Group Housing
  • Location
    • DATTA MANDIR ROAD
    • BHANDUP WEST
    • Bhandup
    • Kurla
    • Mumbai Suburban
    • 400078
  • Pincode400078
  • RERA no.P51800050555
  • ReraGenie IDRG-MH-50055

Builder

  • NameSHREE ASHAPURA COMBINE
  • Entity typePartnership
  • PartnersDHANSUKH HARIDAS NANDA, BHARTI DHANSUKH NANDA, HARISH THAKARSHI BHANUSHALI, HANSA HARISH BHANUSHALI, HARILAL BHANJI PATEL, NAVIN BHANJI PATEL, KANMAL ANRAJ JAIN
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredApr 2023First promiseDec 2027Revised toApr 2028Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on21 Apr 2023
  • Promised completion30 Apr 2028
  • Revised completionRevised to 30 Apr 2028 (originally 31 Dec 2027)
  • Buildings1 building record
  • Documents filed147 files

Current status

43%36 of 84 units booked
100.0%Work done, per cost certificate

Figures as on 21 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B WINGNA242284084

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 0%.

B WING: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 21 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed145

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots145
Closed/Covered145

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,754 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Jun 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI10575.47
Proposed, not sanctioned5,674 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 5/6/7, Jalaram Ashish Society, Devidayal Rd, opposite Raj Hospital, Mulund West, Mumbai, Mah
Estimated costRs 23.75 cr
Cost incurredRs 23.75 cr
Work done100.0%
BuildingWingEstimatedIncurred
B WINGNARs 21.38 crRs 21.38 cr
-NARs 2.38 crRs 2.38 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAMESH DALVI AND ASSOCIATES
ArchitectAR DESIGN STUDIO
EngineerJW CONSULTANT LLP
EngineerTREKKBENCH STRUCTURAL ENGINEERS AND CONSULTANTS
EngineerMM Enterprises
Chartered AccountantKAPURE & KAPURE
Chartered AccountantSUMARIA & SUMARIA
PartnerRole in project
SHREE ASHAPURA COMBINE-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P51800050555/WarDec 2027 → Apr 2028

Reason as filed by the promoterNA

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12601382Mr Rahul Dattatrey KumbharSHREE ASHAPURA COMBINE12/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Aug 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Aug 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed147

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 147 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: OC.pdf21 Sep 2026
Occupational CertificateFile: Final OC Plan Phase 2.pdf21 Sep 2026
Form 2A (FY 2024-2025)File: SAMARTH AURA PHASE 2 Form 2A.pdf9 Sep 2026
Form 2A (FY 2025-2026)File: SAMARTH AURA PHASE 2 Form 2A.pdf29 Aug 2026
Withdrawal Update Form 1File: Form 1 PH 2.pdf29 Jul 2026
Withdrawal Update Form 2File: Form 2 PH 2.pdf29 Jul 2026
Withdrawal Update Form 3File: Form 3 - Phase 2_compressed.pdf29 Jul 2026
Form 5 (FY 2025-2026)File: Form 5 - Phase 2.pdf29 Jul 2026
Withdrawal Update Form 1File: Form 1 PH 2.pdf15 May 2026
Withdrawal Update Form 2File: Form 2 PH 2.pdf15 May 2026
Withdrawal Update Form 3File: Form 3 - Phase 2_compressed.pdf15 May 2026
Form 5 (FY 2024-2025)File: Withdrawal Application Form2.pdf30 Mar 2026
Withdrawal Update Form 1File: Form 1 PH 2.pdf21 Jan 2026
Withdrawal Update Form 2File: Form 2 PH 2.pdf21 Jan 2026
Withdrawal Update Form 3File: Form 3 PH 2.pdf21 Jan 2026
Withdrawal Update Form 1File: Form 1 - Phase 2.pdf27 Oct 2025
Withdrawal Update Form 1File: Form 1 - Phase 2.pdf27 Oct 2025
Withdrawal Update Form 2File: Form 2 - PH 2.pdf27 Oct 2025
Withdrawal Update Form 2File: Form 2 - PH 2.pdf27 Oct 2025
Withdrawal Update Form 3File: Form 3 - Phase 2.pdf27 Oct 2025
Withdrawal Update Form 3File: Form 3 - Phase 2.pdf27 Oct 2025
Form 2A (FY 2023-2024)File: Engg Certificate Quality Assurance Ph 2.pdf4 Sep 2025
Form 5 (FY 2023-2024)File: Form 5.pdf1 Sep 2025
Layout approvalFile: 1st page.pdf29 Aug 2025
Building plan approvalFile: Page 2.pdf29 Aug 2025
Building plan approvalFile: 3rd page.pdf29 Aug 2025
Building plan approvalFile: 4th page.pdf29 Aug 2025
Building plan approvalFile: 5th page.pdf29 Aug 2025
Building plan approvalFile: 6th page.pdf29 Aug 2025
Building plan approvalFile: 7th page.pdf29 Aug 2025
Form 1File: Form 1 Arch Certificate - Phase II.pdf21 Jul 2025
Form 2File: Form 2 - Phase 2 June 25.pdf21 Jul 2025
Form 3File: Form 3 - Phase 2 June 25_compressed.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold - B Wing.pdf21 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Certificate - Phase 2.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate - Phase 2.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engg Certficate - Phase 2.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold - B Wing phase 2.pdf18 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Phase 2 - Form 5.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Certificate - Phase 2.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engg Certficate - Phase 2.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold - B Wing_.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate - Phase 2 _compressed.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Certificate - Phase 2.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engg Certficate - Phase 2.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold - B Wing_.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate - Phase 2 _compressed.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Certificate - Phase 2.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate - Phase 2 _compressed.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engg Certficate - Phase 2.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold - B Wing_.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Certificate Phase II.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg Certi Phase 2.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA certificate-Phase 2 Sep 24_compressed.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold - B Wing.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Certificate Phase II.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg Certi Phase 2.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA certificate-Phase 2 Sep 24_compressed.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold - B Wing.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Certificate Phase II.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA certificate-Phase 2 Sep 24_compressed.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg Certi Phase 2.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold - B Wing.pdf23 Oct 2024
Layout approvalFile: Issue Drawing_compressed.pdf7 Oct 2024
Layout approvalFile: Issue Drawing_compressed.pdf7 Oct 2024
Layout approvalFile: Issue Drawing_compressed.pdf7 Oct 2024
Copy of Layout Approval (in case of layout)File: Issue Drawing_compressed.pdf7 Oct 2024
Copy of Layout Approval (in case of layout)File: Issue Drawing_compressed.pdf7 Oct 2024
Copy of Layout Approval (in case of layout)File: Issue Drawing_compressed.pdf7 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SAC- FORM 1 - PH 2 - ARCHITECT CERTIFICATE - 30-06-24.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engg Certificate PH 2.pdf23 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold - B Wing.pdf23 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA certificate Phase 2 June 24.pdf23 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate Phase 2 - Sign.pdf3 May 2024
Commencement Certificates / NA Order for plotted developmentFile: 01St April 2024 CC.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Form 1 Ph 2.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate Form 2 PH 2.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA certificate-Phase 2 .pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate PH 2.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate PH 2.pdf20 Jan 2024

How this compares with Mumbai Suburban

43%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 4 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAMARTH AURA PHASE -2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHANDUP WEST6,700+ in Mumbai Suburban

Builder: SHREE ASHAPURA COMBINE

Shree Ashapura Combine has 2 registrations on MahaRERA, including Samarth Aura Phase -1 and SAMARTH AURA PHASE -2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SAMARTH AURA PHASE -2 is delayed beyond 30 Apr 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAMARTH AURA PHASE -2?

The registered promoter entity is SHREE ASHAPURA COMBINE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAMARTH AURA PHASE -2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SAMARTH AURA PHASE -2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SAMARTH AURA PHASE -2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAMARTH AURA PHASE -2?

The professionals named in the filing: Architect: RAMESH DALVI AND ASSOCIATES; Architect: AR DESIGN STUDIO; Engineer: JW CONSULTANT LLP; Engineer: TREKKBENCH STRUCTURAL ENGINEERS AND CONSULTANTS; Engineer: MM Enterprises; Chartered Accountant: KAPURE & KAPURE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAMARTH AURA PHASE -2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAMARTH AURA PHASE -2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAMARTH AURA PHASE -2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.