Home / Browse projects / Mumbai Suburban, Maharashtra / Samarth Aura Phase -1
Samarth Aura Phase -1
RG-MH-44807 · RERA P51800033159 · Last updated on MahaRERA portal: 11 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Samarth Aura Phase -1 is a Residential / Group Housing project by Shree Ashapura Combine in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800033159 on 9 Feb 2022. Possession is promised by 31 Dec 2026. 83 of the 84 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.
At a glance
Project
- NameSamarth Aura Phase -1
- TypeResidential / Group Housing
- Location
- Datta Mandir Road
- Bhandup West
- Kurla
- Mumbai Suburban
- 400078
- Pincode400078
- RERA no.P51800033159
- ReraGenie IDRG-MH-44807
Builder
- NameShree Ashapura Combine
- Entity typePartnership
- PartnersKanmal Anraj Jain, Dhansukh Haridas Nanda, Bharti Dhansukh Nanda, Hansa Harish Bhanushali, Navin Bhanji Patel, Narendra Bhanji Patel, Harish Thakarshi Bhanushali, Ashish Kanmal Jain, Harilal Bhanji Patel
- Other registrations1 more →
- Completed1 of 2
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on9 Feb 2022
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed90 files
Current status
Figures as on 11 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A Wing | NA | 26 | 0 | 84 | 0 | 84 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 11 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.
A Wing: 79% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 70% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
Progress on shared amenities15
As on 11 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed149
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ramesh Dalvi and Associates |
| Architect | AR Design Studio |
| Engineer | JW Consultants LLP |
| Engineer | TREKKBENCH STRUCTURAL ENGINEERS AND CONSULTANTS |
| Chartered Accountant | Rutuja Narsingh & Associates |
| Chartered Accountant | KAPURE & KAPURE |
| Chartered Accountant | Sumaria and Sumaria |
| Partner | Role in project |
|---|---|
| Shree Ashapura Combine | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 5 Feb 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Dec 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Mar 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed90
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 - Arch Certificate - Phase 1.pdf | 11 May 2026 |
| Form 2File: Form 2 - Phase 1.pdf | 11 May 2026 |
| Form 3File: Form 3 - Phase 1_compressed.pdf | 11 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold - A Wing.pdf | 11 May 2026 |
| Form 1File: Form 1 PH 1.pdf | 21 Jan 2026 |
| Form 2File: Form 2 PH 1.pdf | 21 Jan 2026 |
| Form 3File: Form 3 PH 1.pdf | 21 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold - A Wing.pdf | 21 Jan 2026 |
| Form 1File: Form 1 - Phase 1.pdf | 16 Oct 2025 |
| Form 2File: Form 2 - Phase 1.pdf | 16 Oct 2025 |
| Form 3File: Form 3 - Phase 1.pdf | 16 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold - A Wing.pdf | 16 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5 - Phase 1.pdf | 16 Oct 2025 |
| Form 1File: Form 1 Arch Certificate - Phase 1.pdf | 21 Jul 2025 |
| Form 2File: Form 2 - Phase 1 June 25.pdf | 21 Jul 2025 |
| Form 3File: Form 3 - Phase 1 June 25_compressed.pdf | 21 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold - A Wing.pdf | 21 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Certificate - Phase 1.pdf | 18 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate - Phase 1_compressed.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engg Certficate - Phase 1.pdf | 18 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure Of Sold - A Wing phase 1.pdf | 18 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Phase 1 - Form 5.pdf | 18 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Certificate - Phase 1.pdf | 27 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate - Phase 1_compressed.pdf | 27 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engg Certficate - Phase 1.pdf | 27 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure Of Sold - A Wing_.pdf | 27 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Certificate Phase I.pdf | 23 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA certificate-Phase 1 Sep 24_compressed.pdf | 23 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg Certi Phase 1.pdf | 23 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure Of Sold - A Wing.pdf | 23 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SAC- FORM 1 - PH 1 - ARCHITECT CERTIFICATE - 30-06-24.pdf | 23 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engg Certificate PH 1.pdf | 23 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure Of Sold - A Wing.pdf | 23 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA certificate Phase 1 June 24_compressed.pdf | 23 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate Phase 1 - Sign.pdf | 3 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Form 1 Ph 1.pdf | 19 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate Form 2 PH 1.pdf | 19 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA certificate-Phase 1 .pdf | 19 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Scan RERA Form 5 - Phase 1.pdf | 8 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate PH 1.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate PH 1.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate PH 1.pdf | 20 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate PH 1.pdf | 23 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate PH 1_compressed.pdf | 23 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 Phase I Sep 23_compressed.pdf | 21 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect RERA Certificate shree Ashapura PH 1.pdf | 11 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - PH 1.pdf | 11 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase 1 June 2023_compressed.pdf | 11 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SAC- FORM 1 - ARCHITECT CERTIFICATE - 31-03-2023.pdf | 11 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SAC - FORM 2 - ENGINEER CERTIFICATE - 31-03-2023_compressed.pdf | 11 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SAC - FORM 3 - CA CERTIFICATE RERA COST SHEET 31-03-2023_compressed.pdf | 11 May 2023 |
| Other - FinanceFile: Form 5 31-03-2022.pdf | 27 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 31-03-2022.pdf | 23 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect RERAcertificate 31-12-22_compressed.pdf | 21 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer certificate RERA 31-12-22_compressed.pdf | 21 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA certificate RERA 31-12-22_compressed.pdf | 21 Feb 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: SAC_FurtherCC_signed 16-11-2022.pdf | 10 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA ARCHITECT CERTIFICATE 10-10-2022.pdf | 28 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA signed certificate Oct 2022.pdf | 19 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA RERA certi 30-09-2022 signed.pdf | 19 Nov 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 - CA Certificate 30-06-2022_compressed.pdf | 15 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 30-06-2022 Form 1_compressed.pdf | 11 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Engineer Certificate 05-04-2022_compressed.pdf | 11 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate From 2 - 30-06-2022_compressed.pdf | 11 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - ARCHITECT CERTIFICATE 04-04-2022.pdf | 7 Jul 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate as on 31-03-2022.pdf | 7 Jul 2022 |
| Building plan approvalFile: Amended Drawing dated 28-03-2022 compressed PAGE 5 TO 8.pdf | 29 Mar 2022 |
| Building plan approvalFile: Amended Drawing dated 28-03-2022 compressed PAGE 1 TO 4.pdf | 29 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Amended Drawing dated 28-03-2022 compressed PAGE 5 TO 8.pdf | 29 Mar 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Amended Drawing dated 28-03-2022 compressed PAGE 1 TO 4.pdf | 29 Mar 2022 |
| Copy of the legal title reportFile: 1643980239522.pdf | 5 Feb 2022 |
| Proforma of Allotment letterFile: AGREEMENT FOR SALE - Corrected- Final.pdf | 5 Jan 2022 |
| Declaration in FORM BFile: Form - B Promoter.pdf | 31 Dec 2021 |
| CERSAI detailsFile: Shree Ashaoura Combine.pdf | 31 Dec 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised Form 3 Samarth Aura Phase-1.pdf | 31 Dec 2021 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 31 Dec 2021 |
| Layout approvalFile: plan page 1.pdf | 17 Dec 2021 |
| Building plan approvalFile: download.pdf | 17 Dec 2021 |
| Building plan approvalFile: download (1).pdf | 17 Dec 2021 |
| Building plan approvalFile: download (2).pdf | 17 Dec 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 90 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Samarth Aura Phase -1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bhandup West6,700+ in Mumbai Suburban
Runwal Forests Tower 9 - 11
Wheelabrator Alloy Castings Limited
SHRADDHA VARDAAN
SHRADDHA LANDMARK PRIVATE LIMITED
SHRADDHA EVOQUE
SHRADDHA LANDMARK PRIVATE LIMITED
Sugee Vaayu
Sugee Developers Private Limited
SHRADDHA CLASSIC
SHRADDHA LANDMARK PRIVATE LIMITED
Om Siddhivinayak CHS Ltd
Shree Shiv Samarth Reality
See every Mumbai Suburban project, with the district possession charts
Builder: Shree Ashapura Combine
Shree Ashapura Combine has 2 registrations on MahaRERA, including Samarth Aura Phase -1 and SAMARTH AURA PHASE -2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Samarth Aura Phase -1 is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Samarth Aura Phase -1?
The registered promoter entity is Shree Ashapura Combine, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Samarth Aura Phase -1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Samarth Aura Phase -1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Samarth Aura Phase -1?
The professionals named in the filing: Architect: Ramesh Dalvi and Associates; Architect: AR Design Studio; Engineer: JW Consultants LLP; Engineer: TREKKBENCH STRUCTURAL ENGINEERS AND CONSULTANTS; Chartered Accountant: Rutuja Narsingh & Associates; Chartered Accountant: KAPURE & KAPURE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Samarth Aura Phase -1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback