Home / Browse projects / Mumbai Suburban, Maharashtra / Samarth Aura Phase -1

Registered No litigation declared Residential / Group Housing project

Samarth Aura Phase -1

By Shree Ashapura Combine

RG-MH-44807 · RERA P51800033159 · Last updated on MahaRERA portal: 11 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
7 of 11Construction stages donefurthest along: Internal walls, 80%
1 of 84Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

Samarth Aura Phase -1 is a Residential / Group Housing project by Shree Ashapura Combine in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800033159 on 9 Feb 2022. Possession is promised by 31 Dec 2026. 83 of the 84 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.

At a glance

Project

  • NameSamarth Aura Phase -1
  • TypeResidential / Group Housing
  • Location
    • Datta Mandir Road
    • Bhandup West
    • Kurla
    • Mumbai Suburban
    • 400078
  • Pincode400078
  • RERA no.P51800033159
  • ReraGenie IDRG-MH-44807

Builder

  • NameShree Ashapura Combine
  • Entity typePartnership
  • PartnersKanmal Anraj Jain, Dhansukh Haridas Nanda, Bharti Dhansukh Nanda, Hansa Harish Bhanushali, Navin Bhanji Patel, Narendra Bhanji Patel, Harish Thakarshi Bhanushali, Ashish Kanmal Jain, Harilal Bhanji Patel
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredFeb 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Feb 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed90 files

Current status

99%83 of 84 units booked

Figures as on 11 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WingNA26084084

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.

A Wing: 79% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 11 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed149

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots149
Closed/Covered149

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,674 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMunicipal Corporation of Greater Mumbai
Permissible FSI5914.6
Proposed, not sanctioned5,915 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround and 1st Floor, West SO, Madhuvan Heights CHS Ltd, Plot No-12A, RHB Road, Mulund West, Mumbai

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRamesh Dalvi and Associates
ArchitectAR Design Studio
EngineerJW Consultants LLP
EngineerTREKKBENCH STRUCTURAL ENGINEERS AND CONSULTANTS
Chartered AccountantRutuja Narsingh & Associates
Chartered AccountantKAPURE & KAPURE
Chartered AccountantSumaria and Sumaria
PartnerRole in project
Shree Ashapura Combine-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Dec 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 - Arch Certificate - Phase 1.pdf11 May 2026
Form 2File: Form 2 - Phase 1.pdf11 May 2026
Form 3File: Form 3 - Phase 1_compressed.pdf11 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold - A Wing.pdf11 May 2026
Form 1File: Form 1 PH 1.pdf21 Jan 2026
Form 2File: Form 2 PH 1.pdf21 Jan 2026
Form 3File: Form 3 PH 1.pdf21 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold - A Wing.pdf21 Jan 2026
Form 1File: Form 1 - Phase 1.pdf16 Oct 2025
Form 2File: Form 2 - Phase 1.pdf16 Oct 2025
Form 3File: Form 3 - Phase 1.pdf16 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold - A Wing.pdf16 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 - Phase 1.pdf16 Oct 2025
Form 1File: Form 1 Arch Certificate - Phase 1.pdf21 Jul 2025
Form 2File: Form 2 - Phase 1 June 25.pdf21 Jul 2025
Form 3File: Form 3 - Phase 1 June 25_compressed.pdf21 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold - A Wing.pdf21 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Certificate - Phase 1.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate - Phase 1_compressed.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engg Certficate - Phase 1.pdf18 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold - A Wing phase 1.pdf18 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Phase 1 - Form 5.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Certificate - Phase 1.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate - Phase 1_compressed.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engg Certficate - Phase 1.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold - A Wing_.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Arch Certificate Phase I.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA certificate-Phase 1 Sep 24_compressed.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg Certi Phase 1.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold - A Wing.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SAC- FORM 1 - PH 1 - ARCHITECT CERTIFICATE - 30-06-24.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engg Certificate PH 1.pdf23 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold - A Wing.pdf23 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA certificate Phase 1 June 24_compressed.pdf23 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate Phase 1 - Sign.pdf3 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Form 1 Ph 1.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate Form 2 PH 1.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA certificate-Phase 1 .pdf19 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Scan RERA Form 5 - Phase 1.pdf8 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate PH 1.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate PH 1.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate PH 1.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate PH 1.pdf23 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate PH 1_compressed.pdf23 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 Phase I Sep 23_compressed.pdf21 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect RERA Certificate shree Ashapura PH 1.pdf11 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - PH 1.pdf11 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase 1 June 2023_compressed.pdf11 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SAC- FORM 1 - ARCHITECT CERTIFICATE - 31-03-2023.pdf11 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SAC - FORM 2 - ENGINEER CERTIFICATE - 31-03-2023_compressed.pdf11 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SAC - FORM 3 - CA CERTIFICATE RERA COST SHEET 31-03-2023_compressed.pdf11 May 2023
Other - FinanceFile: Form 5 31-03-2022.pdf27 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 31-03-2022.pdf23 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect RERAcertificate 31-12-22_compressed.pdf21 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer certificate RERA 31-12-22_compressed.pdf21 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA certificate RERA 31-12-22_compressed.pdf21 Feb 2023
Commencement Certificates / NA Order for plotted developmentFile: SAC_FurtherCC_signed 16-11-2022.pdf10 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA ARCHITECT CERTIFICATE 10-10-2022.pdf28 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA signed certificate Oct 2022.pdf19 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA RERA certi 30-09-2022 signed.pdf19 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 - CA Certificate 30-06-2022_compressed.pdf15 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 30-06-2022 Form 1_compressed.pdf11 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Engineer Certificate 05-04-2022_compressed.pdf11 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate From 2 - 30-06-2022_compressed.pdf11 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - ARCHITECT CERTIFICATE 04-04-2022.pdf7 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate as on 31-03-2022.pdf7 Jul 2022
Building plan approvalFile: Amended Drawing dated 28-03-2022 compressed PAGE 5 TO 8.pdf29 Mar 2022
Building plan approvalFile: Amended Drawing dated 28-03-2022 compressed PAGE 1 TO 4.pdf29 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Amended Drawing dated 28-03-2022 compressed PAGE 5 TO 8.pdf29 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Amended Drawing dated 28-03-2022 compressed PAGE 1 TO 4.pdf29 Mar 2022
Copy of the legal title reportFile: 1643980239522.pdf5 Feb 2022
Proforma of Allotment letterFile: AGREEMENT FOR SALE - Corrected- Final.pdf5 Jan 2022
Declaration in FORM BFile: Form - B Promoter.pdf31 Dec 2021
CERSAI detailsFile: Shree Ashaoura Combine.pdf31 Dec 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised Form 3 Samarth Aura Phase-1.pdf31 Dec 2021
Proforma of Allotment letterFile: Allotment Letter.pdf31 Dec 2021
Layout approvalFile: plan page 1.pdf17 Dec 2021
Building plan approvalFile: download.pdf17 Dec 2021
Building plan approvalFile: download (1).pdf17 Dec 2021
Building plan approvalFile: download (2).pdf17 Dec 2021

How this compares with Mumbai Suburban

99%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Samarth Aura Phase -1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhandup West6,700+ in Mumbai Suburban

Builder: Shree Ashapura Combine

Shree Ashapura Combine has 2 registrations on MahaRERA, including Samarth Aura Phase -1 and SAMARTH AURA PHASE -2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Samarth Aura Phase -1 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Samarth Aura Phase -1?

The registered promoter entity is Shree Ashapura Combine, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Samarth Aura Phase -1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Samarth Aura Phase -1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Samarth Aura Phase -1?

The professionals named in the filing: Architect: Ramesh Dalvi and Associates; Architect: AR Design Studio; Engineer: JW Consultants LLP; Engineer: TREKKBENCH STRUCTURAL ENGINEERS AND CONSULTANTS; Chartered Accountant: Rutuja Narsingh & Associates; Chartered Accountant: KAPURE & KAPURE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Samarth Aura Phase -1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Samarth Aura Phase -1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Samarth Aura Phase -1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.