Red flags
- Rs 5.00 crore secured on the land, in favour of ICICI HOME FINACE LIMITED
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SAMARPAN SANKALP is a Others project by SAMARPAN HOMES & DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800054977 on 21 Feb 2024. Possession is promised by 31 Dec 2026. 50 of the 125 units on this registration are recorded sold or booked, and 4 of 22 construction stages are filed complete.
At a glance
Project
- NameSAMARPAN SANKALP
- TypeOthers
- Location
- DATTAPADA ROAD
- AT JAYA NAGAR
- BORIVALI (EAST)
- Magathane
- Borivali
- Mumbai Suburban
- 400066
- Pincode400066
- RERA no.P51800054977
- ReraGenie IDRG-MH-07004
Builder
- NameSAMARPAN HOMES & DEVELOPERS
- Entity typePartnership
- GSTIN27ADIFS1401J1Z6
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersRAMILA RAMESH JAIN, KAPIL RAMESH JAIN
- Other registrations12 more →
- Completed4 of 13
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects3 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on21 Feb 2024
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings2 building records
- Documents filed65 files
Current status
Figures as on 13 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A WING | NA | 17 | 13 | 55 | 0 | 55 |
| B WING | NA | 17 | 13 | 70 | 0 | 70 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 13 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Stilt Floor, at 95%.
A WING40%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 95% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 70% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 20% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
B WING40%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 95% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 70% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 40% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 20% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 13 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 80% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed97
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| A WING | 49 | 49 |
| B WING | 48 | 48 |
Land and ownership3
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| SANJEEVANI CO-OPERATIVE HOUSING SOCIETY LIMITED | Borivali | Mumbai Suburban |
| KALAPI CO-OPERATIVE HOUSING SOCIETY LIMITED | Borivali | Mumbai Suburban |
| THE BORIVALI KAUMUDI CO-OP HOUSING SOCIETY LTD | Borivali | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A WING | NA | Rs 16.90 cr | Rs 11.24 cr |
| B WING | NA | Rs 16.90 cr | Rs 11.24 cr |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ASHIM KHATRI |
| Engineer | NILESH DALWANIDA |
| Chartered Accountant | NEHALI AND CO |
| Partner | Role in project |
|---|---|
| SAMARPAN HOMES & DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Nov 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Feb 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Feb 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed65
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Samarpan Sankalp March 26.pdf | 13 Jun 2026 |
| Withdrawal Update Form 2File: FORM 2 SKK.pdf | 13 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3 SKK_compressed.pdf | 13 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 Arch.pdf | 23 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 Engg.pdf | 23 Mar 2026 |
| Withdrawal Update Form 3File: FORM 3 SKK_compressed.pdf | 23 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 Arch Sankalp Sept25.pdf | 6 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Engg Sankalp Sept25.pdf | 6 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 CA Sankalp Sept25 (1).pdf | 6 Jan 2026 |
| Withdrawal Update Form 1File: Form -1 SKK.pdf | 4 Oct 2025 |
| Withdrawal Update Form 2File: Form - 2 SKK.pdf | 4 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 SKK.pdf | 4 Oct 2025 |
| Withdrawal Update Form 1File: Form -1 SKK.pdf | 2 Sep 2025 |
| Withdrawal Update Form 2File: Form - 2 SKK.pdf | 2 Sep 2025 |
| Withdrawal Update Form 3File: Form 3 SKK.pdf | 2 Sep 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 Arch Samarpan Sankalp Mach-25.pdf | 18 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory disclosure.pdf | 8 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form- 2A 23-24.pdf | 8 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5 23-24.pdf | 8 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form- 2 Samarpan Sankalp_compressed.pdf | 19 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form -2 Engg Samarpan Sankalp Dec-24.pdf | 17 Feb 2025 |
| Layout approvalFile: Drawing IOD SKK FINAL.pdf | 12 Feb 2025 |
| Copy of Layout Approval (in case of layout)File: Drawing IOD SKK FINAL.pdf | 12 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Samarpan Sankalp Dec-24 (1).pdf | 10 Feb 2025 |
| Layout approvalFile: Drawing IOD SKK_1-3.pdf | 3 Feb 2025 |
| Layout approvalFile: Drawing IOD SKK_4-end.pdf | 3 Feb 2025 |
| Copy of Layout Approval (in case of layout)File: Drawing IOD SKK_1-3.pdf | 3 Feb 2025 |
| Copy of Layout Approval (in case of layout)File: Drawing IOD SKK_4-end.pdf | 3 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 8 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Arch 06 24.pdf | 28 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 CA 09 24.pdf | 28 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Engg 06 24.pdf | 28 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From - 2 Engg 09 24.pdf | 28 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 Sankalp july to sep 24.pdf | 14 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 12 Dec 2024 |
| Proforma of Agreement for saleFile: Agreement for sale.pdf | 28 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: NO ENCUBRANCE.pdf | 27 Feb 2024 |
| Details of encumbrances concerned to LegalFile: NO ENCUBRANCE.pdf | 27 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Resigned CA Certificate-skk project2.pdf | 7 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: No encumbarance (1).pdf | 27 Dec 2023 |
| Details of encumbrances concerned to LegalFile: No encumbarance (1).pdf | 27 Dec 2023 |
| Other - LegalFile: Form B - Affidavit cum Declaration SSC.pdf | 27 Dec 2023 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER FINAL SKK.pdf | 25 Nov 2023 |
| Proforma of Agreement for saleFile: RERA AFS SKK (2).pdf | 25 Nov 2023 |
| Deviation Report with respect to Allotment letterFile: Deviation Allotment - SKK.pdf | 25 Nov 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Reprot Agreement 11122023 (1).pdf | 25 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 23-11-2023 -Corrigendum Issue Letter.pdf | 24 Nov 2023 |
| Building plan approvalFile: IOD COPY 1 TO 10 PAGE.pdf | 4 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: NO ENCUMBLRANCE SELF DECLARATION.pdf | 4 Nov 2023 |
| Details of encumbrances concerned to LegalFile: NO ENCUMBLRANCE SELF DECLARATION.pdf | 4 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD COPY 1 TO 10 PAGE.pdf | 4 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 2390013_FirstCC_signed.pdf | 4 Nov 2023 |
| Declaration about Commencement CertificateFile: DECLARATION CC.pdf | 4 Nov 2023 |
| Declaration in FORM BFile: Form B - Affidavit cum Declaration SSC.pdf | 4 Nov 2023 |
| CERSAI detailsFile: skk Cersai Declartion (1).pdf | 4 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A DOI (23).pdf | 4 Nov 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A -Bank Letter Samarpan Sankalp.pdf | 4 Nov 2023 |
| Layout approvalFile: IOD FINAL DRAWING FINAL IOD_(1).pdf | 2 Nov 2023 |
| Layout approvalFile: IOD FINAL DRAWING FINAL IOD (2).pdf | 2 Nov 2023 |
| Layout approvalFile: IOD FINAL DRAWING FINAL IOD (3).pdf | 2 Nov 2023 |
| PAN CardFile: 1 PAN Card company.pdf | 2 Nov 2023 |
| Copy of the legal title reportFile: TITLE REPORT (3).pdf | 2 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: IOD FINAL DRAWING FINAL IOD_(1).pdf | 2 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: IOD FINAL DRAWING FINAL IOD (2).pdf | 2 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: IOD FINAL DRAWING FINAL IOD (3).pdf | 2 Nov 2023 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| OM SHRI JAGANNATH CHSLP51800054351 | BORIVALI (W), Mumbai Suburban | 74 | Jan 2024 | Ongoing | Dec 2026Registered original: Mar 2026 | Not due yet |
| GOLDMIST CO-OPERATIVE HOUSING SOCIETY LIMITEDP51800054965 | KANDIVALI (EAST), Mumbai Suburban | 93 | Feb 2024 | Ongoing | Dec 2026 | Not due yet |
| ANAND CO-OPERATIVE HOUSING SOCIETY LTD BUILDING NO 2P51800055685 | BORIVALI (EAST), Mumbai Suburban | 140 | Apr 2024 | Ongoing | Dec 2026 | Not due yet |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 12 other registrations, which the RERA portal never shows together
- All 65 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SAMARPAN SANKALP on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near AT JAYA NAGAR, BORIVALI (EAST)6,700+ in Mumbai Suburban
Shraddha Park City
Shraddha Prime Projects Limited
GREENAIRY
SAROJ LANDMARK REALTY LLP
Sky City Tower H
Incline Realty Private Limited
Sky City Tower G
Incline Realty Private Limited
SHEETAL REGALIA
D G S TOWNSHIP PRIVATE LIMITED
JANGID ELYSIUM
IMPRINT CONSTRUCTION PRIVATE LIMITED
See every Mumbai Suburban project, with the district possession charts
Builder: SAMARPAN HOMES & DEVELOPERS
SAMARPAN HOMES & DEVELOPERS has 13 registrations on MahaRERA, including BORIVALI OM APARTMENT CO-OP HSG SOCIETY LTD and RAM DUTT CO-OPERATIVE HOUSING SOCIETY LTD. Its filings disclose 3 earlier MahaRERA projects, none completed yet. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if SAMARPAN SANKALP is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SAMARPAN SANKALP?
The registered promoter entity is SAMARPAN HOMES & DEVELOPERS, a partnership as per the filing. Its GSTIN 27ADIFS1401J1Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SAMARPAN SANKALP?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SAMARPAN SANKALP?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SAMARPAN SANKALP?
The professionals named in the filing: Architect: ASHIM KHATRI; Engineer: NILESH DALWANIDA; Chartered Accountant: NEHALI AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SAMARPAN SANKALP?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback