ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / ANAND CO-OPERATIVE HOUSING SOCIETY LTD BUILDING NO 2

Registered No litigation declared Others project

ANAND CO-OPERATIVE HOUSING SOCIETY LTD BUILDING NO 2

By SAMARPAN HOMES & DEVELOPERS

RG-MH-06777 · RERA P51800055685 · Last updated on MahaRERA portal: 17 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 12 other registrations.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Stilt Floor, 95%
119 of 140Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 55 documents Report an error

ANAND CO-OPERATIVE HOUSING SOCIETY LTD BUILDING NO 2 is a Others project by SAMARPAN HOMES & DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800055685 on 8 Apr 2024. Possession is promised by 31 Dec 2026. 21 of the 140 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameANAND CO-OPERATIVE HOUSING SOCIETY LTD BUILDING NO 2
  • TypeOthers
  • Location
    • KASTURBA CROSS ROAD NO. 4
    • BORIVALI (EAST)
    • Kanheri
    • Borivali
    • Mumbai Suburban
    • 400066
  • Pincode400066
  • RERA no.P51800055685
  • ReraGenie IDRG-MH-06777

Builder

  • NameSAMARPAN HOMES & DEVELOPERS
  • Entity typePartnership
  • GSTIN27ADIFS1401J1Z6
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersRAMILA RAMESH JAIN, KAPIL RAMESH JAIN
  • Other registrations12 more →
  • Completed4 of 13
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

this monthRegisteredApr 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on8 Apr 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed55 files

Current status

15%21 of 140 units booked
23.5%Work done, per cost certificate

Figures as on 17 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANAND CO-OPERATIVE HOUDING SOCIETY LTDNA18161400140

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 95%.

ANAND CO-OPERATIVE HOUDING SOCIETY LTD: 38% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)90%
Plinth100%
Stilt Floor95%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed75

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots75
Closed/Covered75

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,983 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Jan 2026
LandownerVillageDistrict
ANAND CO-OPERATIVE HOUSING SOCIETY LIMITEDBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI7810.0
Proposed, not sanctioned6,542 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHARI OM PLAZA MG ROAD BORIVALI EAST MUMBAI 400 066
Estimated costRs 49.22 cr
Cost incurredRs 11.59 cr
Work done23.54%
BuildingWingEstimatedIncurred
ANAND CO-OPERATIVE HOUDING SOCIETY LTDNARs 49.22 crRs 11.59 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCHAMUNDA DESIGNERS
EngineerNILESH DALWANI
Chartered AccountantNEHALI & CO
PartnerRole in project
SAMARPAN HOMES & DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed55

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form -1 Anand March-26.pdf17 Jun 2026
Withdrawal Update Form 2File: FORM - 2 ANAND CHSL.pdf17 Jun 2026
Withdrawal Update Form 3File: FORM - 3 ANAND CHSL.pdf17 Jun 2026
Withdrawal Update Form 1File: FORM 1 Dec-25.pdf27 Mar 2026
Withdrawal Update Form 2File: FORM 2Dec-25.pdf27 Mar 2026
Withdrawal Update Form 3File: FORM 3 ANAND new.pdf27 Mar 2026
Withdrawal Update Form 1File: Form 1 Arch Anand Sept25.pdf16 Dec 2025
Withdrawal Update Form 2File: Form 2 Engg Anand Sept25.pdf16 Dec 2025
Withdrawal Update Form 3File: form 3 NEW.pdf16 Dec 2025
Withdrawal Update Form 1File: form 1.pdf4 Oct 2025
Withdrawal Update Form 2File: form 2.pdf4 Oct 2025
Withdrawal Update Form 3File: form 3 NEW.pdf4 Oct 2025
Withdrawal Update Form 1File: form 1.pdf5 Sep 2025
Withdrawal Update Form 1File: form 1.pdf5 Sep 2025
Withdrawal Update Form 2File: form 2.pdf5 Sep 2025
Withdrawal Update Form 2File: form 2.pdf5 Sep 2025
Withdrawal Update Form 3File: form 3 NEW.pdf5 Sep 2025
Withdrawal Update Form 3File: form 3 NEW.pdf5 Sep 2025
Details of encumbrances concerned to FinanceFile: Anand encumbrance finance.pdf22 Apr 2025
Details of encumbrances concerned to LegalFile: Anand encumbrance finance.pdf22 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Engg Anand Dec-24.pdf17 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 CA Anand Dec- 24 (1).pdf13 Feb 2025
Proforma of Agreement for saleFile: REVISED ANAND DRAFT.pdf11 Feb 2025
Layout approvalFile: Ananad Plan.pdf3 Feb 2025
Copy of Layout Approval (in case of layout)File: Ananad Plan.pdf3 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf8 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Anand june 24.pdf26 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2 .pdf24 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A 23-24.pdf24 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 april to june 24.pdf16 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 Anand july to sep 24.pdf16 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form- 3 july to sep 24.pdf16 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 Anand july to sep 24.pdf14 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 july to sep 24.pdf13 Dec 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK ACCOUNT (5).pdf21 Mar 2024
Other - TechnicalFile: Specimen format of Declaration - layout.pdf5 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA ( Anand Bldg (1).pdf28 Feb 2024
Layout approvalFile: IOD DRAWING COPY ZEROZ IOD 15061.pdf24 Feb 2024
Building plan approvalFile: IOD COPY 1 TO 12 PAGES LATEST 15061.pdf24 Feb 2024
PAN CardFile: 1 PAN Card (6).pdf24 Feb 2024
Copy of the legal title reportFile: ANAND RERA TITLE REPORT.pdf24 Feb 2024
Details of encumbrances concerned to FinanceFile: No encumbrance (12).pdf24 Feb 2024
Details of encumbrances concerned to LegalFile: No encumbrance (12).pdf24 Feb 2024
Copy of Layout Approval (in case of layout)File: IOD DRAWING COPY ZEROZ IOD 15061.pdf24 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD COPY 1 TO 12 PAGES LATEST 15061.pdf24 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: CC_signed.pdf24 Feb 2024
Declaration about Commencement CertificateFile: CC declaration.pdf24 Feb 2024
Declaration in FORM BFile: Form B (6).pdf24 Feb 2024
CERSAI detailsFile: Cersai Declaration - Anand -2.pdf24 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: D.pdf24 Feb 2024
Proforma of Agreement for saleFile: RERA FORMAT AGREEMENT.pdf24 Feb 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER FINAL (18) (1).pdf24 Feb 2024
Deviation Report with respect to Allotment letterFile: Deviation Reoprt on Allotment.pdf24 Feb 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report on Agreement for Sale (2) (1).pdf24 Feb 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
OM SHRI JAGANNATH CHSLP51800054351BORIVALI (W), Mumbai Suburban74Jan 2024OngoingDec 2026Registered original: Mar 2026Not due yet
GOLDMIST CO-OPERATIVE HOUSING SOCIETY LIMITEDP51800054965KANDIVALI (EAST), Mumbai Suburban93Feb 2024OngoingDec 2026Not due yet

How this compares with Mumbai Suburban

15%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ANAND CO-OPERATIVE HOUSING SOCIETY LTD BUILD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BORIVALI (EAST)6,700+ in Mumbai Suburban

Builder: SAMARPAN HOMES & DEVELOPERS

SAMARPAN HOMES & DEVELOPERS has 13 registrations on MahaRERA, including BORIVALI OM APARTMENT CO-OP HSG SOCIETY LTD and RAM DUTT CO-OPERATIVE HOUSING SOCIETY LTD. Its filings disclose 3 earlier MahaRERA projects, none completed yet. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if ANAND CO-OPERATIVE HOUSING SOCIETY LTD BUILDING NO 2 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ANAND CO-OPERATIVE HOUSING SOCIETY LTD BUILDING NO 2?

The registered promoter entity is SAMARPAN HOMES & DEVELOPERS, a partnership as per the filing. Its GSTIN 27ADIFS1401J1Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ANAND CO-OPERATIVE HOUSING SOCIETY LTD BUILDING NO 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ANAND CO-OPERATIVE HOUSING SOCIETY LTD BUILDING NO 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ANAND CO-OPERATIVE HOUSING SOCIETY LTD BUILDING NO 2?

The professionals named in the filing: Architect: CHAMUNDA DESIGNERS; Engineer: NILESH DALWANI; Chartered Accountant: NEHALI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANAND CO-OPERATIVE HOUSING SOCIETY LTD BUILDING NO 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANAND CO-OPERATIVE HOUSING SOCIETY LTD BUILDING NO 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANAND CO-OPERATIVE HOUSING SOCIETY LTD BUILD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.