Home / Browse projects / Mumbai Suburban, Maharashtra / Sale Building No. 14 - Phase 1

Registration lapsed No litigation declared Residential / Group Housing project

Sale Building No. 14 - Phase 1

By Mangal Moorti Developers Private Limited

RG-MH-78823 · RERA P51800017169 · Last updated on MahaRERA portal: 11 Jun 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 22 months past the filed date
  • 20 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2024Possession promised22 months past this date
1 of 11Construction stages donefurthest along: Basement (if any), 80%
20Complaints at MahaRERAon this registration
Jump to the 108 documents Report an error

Sale Building No. 14 - Phase 1 is a Residential / Group Housing project by Mangal Moorti Developers Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800017169 on 17 Jul 2018. Possession was promised by 30 Dec 2024 and is now 22 months past that date. 20 complaints are on record with the regulator.

At a glance

Project

  • NameSale Building No. 14 - Phase 1
  • TypeResidential / Group Housing
  • Location
    • Mankurd
    • Ghatkopar Link Road
    • Kurla
    • Mumbai Suburban
    • 400043
  • Pincode400043
  • RERA no.P51800017169
  • ReraGenie IDRG-MH-78823

Builder

  • NameMangal Moorti Developers Private Limited
  • Entity typeCompany
  • CINU70100MH1989PTC053196
  • DirectorsAtul Kumar Rajkumar Agrawal, kantilal Mulchand Patel, Vinodkumar Prithviraj Kothari
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

22 months past promisethis monthRegisteredJul 2018PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on17 Jul 2018
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed108 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Mangal Moorti Complex Building Number 14NA490000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 80%.

Mangal Moorti Complex Building Number 14: 36% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth80%
Stilt Floor80%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes33%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed87

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots87
Closed/Covered64
Open Space23

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,714 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI5016.0
Proposed, not sanctioned5,016 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDEONAR BRANCH , UNIT NO 1, SAFAL PRIDE , SION TROMBAY ROAD, DEONAR, MUMBAI 400088

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Mangal Moorti Developers Private Limited-

Complaints filed with MahaRERA20

Case no.ComplainantRespondentFiled
CC12502464Suresh Laxman KatareMangal Moorti Developers Private Limited18/07/2025
CC12603416MEHTAB ALI KHANMangal Moorti Developers Private Limited03/06/2026
CC12603417Vijaykumar Khajanchilal JaiswalMangal Moorti Developers Private Limited03/06/2026
CC12603440Pushpadevi Santosh JaiswalMangal Moorti Developers Private Limited04/06/2026
CC12603439MANGESH KASHINATH NIMANDEMangal Moorti Developers Private Limited04/06/2026
CC12603459Ramesh S GuptaMangal Moorti Developers Private Limited05/06/2026
CC12603460Ashwin Vilas RaoraneMangal Moorti Developers Private Limited05/06/2026
CC12603462Santosh Kumar Sibodhi GuptaMangal Moorti Developers Private Limited05/06/2026
CC12603533Nyemuddin Mohammad Shafi KhanMangal Moorti Developers Private Limited08/06/2026
CC12603534Wasila Bano Mohd Salimuddin FarooquiMangal Moorti Developers Private Limited08/06/2026
CC12603535Vibhu Girish Chand JainMangal Moorti Developers Private Limited08/06/2026
CC12603536Shrinivas Venkatadri Venkatramulu NarmetaMangal Moorti Developers Private Limited08/06/2026
CC12603537Rajaudddin Mainuddin KhanMangal Moorti Developers Private Limited08/06/2026
CC12603610Aasmabano Akramuddin SiddhiquiMangal Moorti Developers Private Limited11/06/2026
CC12603611Tanveer Alam Zainuddin KhanMangal Moorti Developers Private Limited11/06/2026
CC12603641Mohd Salimuddin FarooquiMangal Moorti Developers Private Limited12/06/2026
CC12603642Abdul Muthalibu ShaikhMangal Moorti Developers Private Limited12/06/2026
CC12603643Santosh Amirchand GuptaMangal Moorti Developers Private Limited12/06/2026
CC12603639Mohammad IqbalMangal Moorti Developers Private Limited12/06/2026
CC12603640Khleek Ziauddin ShaikhMangal Moorti Developers Private Limited12/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed108

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 11 MMDPL RERA form 1 31-03-2025.pdf11 Jun 2025
Certificates of CA (Form 3)File: 14 Form 3 CA Certificate 31-03-2025.pdf11 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 13 Engineer's Certificate 31-03-2025.pdf11 Jun 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: 8 Form 5 FY 2024-25.pdf11 Jun 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 12 Engineer's Certificate 31-12-2024.pdf28 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 9 MMDPL RERA form 1 30-09-2024.pdf27 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 10 MMDPL RERA form 1 31-12-2024.pdf27 Mar 2025
Certificates of CA (Form 3)File: 12 Form 3 CA Certificate 30-09-2024.pdf27 Mar 2025
Certificates of CA (Form 3)File: 13 Form 3 CA Certificate 31-12-2024.pdf27 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 11 Engineer's Certificate 30-09-2024.pdf27 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form2a 2019-2020.pdf27 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form2a 2020-2021.pdf27 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold unsold Sep 24 mmdpl _11zon.pdf27 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold unsold mmdpl dec 24 _11zon.pdf27 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form2a 2021-2022.pdf27 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form2a 2022-2023.pdf27 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form2a 2023-2024.pdf27 Mar 2025
Declaration in FORM BFile: MMDPL affadivit 2024.pdf29 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 5 MMDPL RERA form 1 200322.pdf29 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 6 MMDPL RERA form 1 160323.pdf29 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 7 MMDPL RERA form 1 230324.pdf29 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 8 MMDPL RERA form 1 160624.pdf29 Nov 2024
Certificates of CA (Form 3)File: 6 Form 3 CA Certificate 31-03-2020.pdf29 Nov 2024
Certificates of CA (Form 3)File: 7 Form 3 CA Certificate 31-03-2021.pdf29 Nov 2024
Certificates of CA (Form 3)File: 8 Form 3 CA Certificate 31-03-2022.pdf29 Nov 2024
Certificates of CA (Form 3)File: 9 Form 3 CA Certificate 31-03-2023.pdf29 Nov 2024
Certificates of CA (Form 3)File: 10 Form 3 CA Certificate 31-03-2024.pdf29 Nov 2024
Certificates of CA (Form 3)File: 11 Form 3 CA Certificate 30-06-2024.pdf29 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 5 Engineer's Certificate 31-03-2020.pdf29 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 10 Engineer's Certificate 30-06-2024.pdf29 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 9 Engineer's Certificate 31-03-2024.pdf29 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 8 Engineer's Certificate 31-03-2023.pdf29 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 7 Engineer's Certificate 31-03-2022.pdf29 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 6 Engineer's Certificate 31-03-2021.pdf29 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 3 Form 5 FY 2019-20.pdf29 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 4 Form 5 FY 2020-21.pdf29 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 5 Form 5 FY 2021-22.pdf29 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 5 Form 5 FY 2021-22.pdf29 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 6 Form 5 FY 2022-23.pdf29 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 7 Form 5 FY 2023-24.pdf29 Nov 2024
Layout approvalFile: 01_11zon.pdf16 Mar 2024
Layout approvalFile: 02_11zon.pdf16 Mar 2024
Layout approvalFile: 03_11zon.pdf16 Mar 2024
Layout approvalFile: 04_11zon.pdf16 Mar 2024
Layout approvalFile: 05_11zon.pdf16 Mar 2024
Layout approvalFile: 06_11zon.pdf16 Mar 2024
Layout approvalFile: 07_11zon.pdf16 Mar 2024
Copy of Layout Approval (in case of layout)File: 01_11zon.pdf16 Mar 2024
Copy of Layout Approval (in case of layout)File: 02_11zon.pdf16 Mar 2024
Copy of Layout Approval (in case of layout)File: 03_11zon.pdf16 Mar 2024
Copy of Layout Approval (in case of layout)File: 04_11zon.pdf16 Mar 2024
Copy of Layout Approval (in case of layout)File: 05_11zon.pdf16 Mar 2024
Copy of Layout Approval (in case of layout)File: 06_11zon.pdf16 Mar 2024
Copy of Layout Approval (in case of layout)File: 07_11zon.pdf16 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: CC dt 05-03-2024 for Roma Banjara Tanda bldg no 14 (1).pdf16 Mar 2024
Layout approvalFile: approved_plan_1_7.pdf24 Jun 2023
Layout approvalFile: approved_plan_2_7.pdf24 Jun 2023
Layout approvalFile: approved_plan_3_7.pdf24 Jun 2023
Building plan approvalFile: bldg no 14 amended IOA.pdf24 Jun 2023
Copy of the legal title reportFile: Title Report-MKD.pdf24 Jun 2023
Copy of Layout Approval (in case of layout)File: approved_plan_1_7.pdf24 Jun 2023
Copy of Layout Approval (in case of layout)File: approved_plan_2_7.pdf24 Jun 2023
Copy of Layout Approval (in case of layout)File: approved_plan_3_7.pdf24 Jun 2023
Building Plan Approval (IOD)File: bldg no 14 amended IOA.pdf24 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: MMDPL CC.pdf24 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: CC bldg no 14.pdf24 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4 Architect's Certificate 21-10-2021.pdf25 Jan 2023
Declaration about Commencement CertificateFile: Form D-Rera.PDF5 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 FY 18-19 Sale Building No 14.pdf1 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 19-20 Sale Building No 14.pdf1 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY 20-21 Sale Building No 14.pdf1 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: Roma Further CC upto 7th floor_compressed (1).pdf14 Jul 2021
Certificates of CA (Form 3)File: FORM 3 Sale Building No1 Phase I.pdf29 Feb 2020
OtherFile: MERGED APPOINTMENT AND CONSENT_compressed (2)-1-6.pdf14 Nov 2019
OtherFile: MERGED APPOINTMENT AND CONSENT_compressed (2)-7-11.pdf14 Nov 2019
Annual Audit Report of Statutory CA (Form 5)File: Form 5 Sale Building.pdf30 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf16 Aug 2019
Certificates of CA (Form 3)File: Form 3.pdf16 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf30 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf30 May 2019

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Mangal moorti Complex Building Number 12Mangal Moorti Complex Mankhurd - Ghatkopar Link Road Mankhurd West Mumbai 400043126CompletedJun 2015Jun 2015

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sale Building No. 14 - Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ghatkopar Link Road6,700+ in Mumbai Suburban

Builder: Mangal Moorti Developers Private Limited

Mangal Moorti Developers Private Limited has 2 registrations on MahaRERA, including Sale Building No. 14 - Phase 1 and AGRAWALS ARMAAN SALE BUILDING NO 14B. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Sale Building No. 14 - Phase 1 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Sale Building No. 14 - Phase 1 is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sale Building No. 14 - Phase 1?

The registered promoter entity is Mangal Moorti Developers Private Limited, a company as per the filing. Its CIN U70100MH1989PTC053196 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sale Building No. 14 - Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Sale Building No. 14 - Phase 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Sale Building No. 14 - Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Sale Building No. 14 - Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sale Building No. 14 - Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sale Building No. 14 - Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.