DOMAIN

By M/s Build Square

RG-MH-15773 · RERA P51800023311 · Last updated on MahaRERA portal: 10 Aug 2026

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken
  • Rs 60.00 crore secured on the land, in favour of Aditya Birla Capital Limited

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
13 of 33Construction stages doneacross 3 buildings; furthest along: Staircases, 97%
137 of 462Units unsoldnot recorded sold or booked
3Complaints at MahaRERAon this registration
Jump to the 117 documents Report an error

DOMAIN is a Others project by M/s Build Square in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800023311 on 11 Dec 2019. Possession is promised by 29 Dec 2026. The completion date has moved by 12 months from the original filing. 325 of the 462 units on this registration are recorded sold or booked, and 13 of 33 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • NameDOMAIN
  • TypeOthers
  • Location
    • Ghatkopar Mankhurd Road
    • Deonar Mumbai
    • Kurla
    • Mumbai Suburban
    • 400043
  • Pincode400043
  • RERA no.P51800023311
  • ReraGenie IDRG-MH-15773

Builder

  • NameM/s Build Square
  • Entity typeOthers
  • PartnersMohammad Ziauddin Siddiqui, DOTOM Build Square LLP
  • Named personsDOTOM Build Square LLP, EKA LIFE LIMITED

Key dates

this monthRegisteredDec 2019First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Dec 2019
  • Promised completion29 Dec 2026
  • Revised completionRevised to 29 Dec 2026 (originally 30 Dec 2025)
  • Buildings3 building records
  • Documents filed117 files

Current status

70%325 of 462 units booked
80.4%Work done, per cost certificate

Figures as on 10 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A wingNA33322450245
B wingNA33322090209
C wingNA2828268

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 10 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

13 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Staircases, at 97%.

A wing66%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises93%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks97%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
B wing63%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%
C wing64%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 10 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes85%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes85%
Storm Water DrainsYes85%
Landscaping & Tree PlantingYes35%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes85%
Solid Waste Management And DisposalYes85%
Water conservation /Rain water harvestingYes85%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes85%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed305

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots305
Closed/Covered305
BuildingClosed/CoveredTotal
A wing156156
B wing8484
C wing6565

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,450 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Capital Limited
Secured amountRs 60.00 crore
CERSAI search filedYes
Declared on27 Feb 2026

Approvals and building plan

Sanctioning authoritySRA
Permissible FSI19776.33
Proposed, not sanctioned19,285 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSantacruz West
Estimated costRs 173.11 cr
Cost incurredRs 139.23 cr
Work done80.43%
BuildingWingEstimatedIncurred
C wingNARs 54.18 crRs 53.40 cr
A wingNARs 51.73 crRs 40.41 cr
B wingNARs 37.46 crRs 29.27 cr
-NARs 29.74 crRs 16.15 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDOT Architects
EngineerGIREESH M. RAJADHYAKSHA
EngineerKamlesh Gurav
Chartered AccountantThar & Co
Chartered AccountantDaya & Associates
PartnerRole in project
M/s Build Square-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA04092502512Dec 2025 → Dec 2026

Reason as filed by the promoter1.Environmental Clearance (EC) - process paralysis due to jurisdictional uncertainty and court orders. 2. Noise pollution complaints and compliance pauses. 3. Non cooperation and delayed eviction by a subset of slum dwellers. 4.Geotechnical constraints. 5. Requirement from Axis Bank for project Loan. Please consider this extension application as per order 40.

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
SM12500147Bhakti AchrekarM/s Build Square23/09/2025
CC12600381Faiz Mohammed Dastagir SyedM/s Build Square21/01/2026
CC12601396M/s Build SquareKashinath Uttam Chorage13/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Nov 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Dec 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Nov 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 29 Dec 2026

Documents filed117

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 117 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Dec 2025.pdf10 Aug 2026
Withdrawal Update Form 1File: Form 1 Signed.pdf10 Aug 2026
Withdrawal Update Form 2File: Form 2 Dec 2025.pdf10 Aug 2026
Withdrawal Update Form 2File: Form 2 signed.pdf10 Aug 2026
Withdrawal Update Form 3File: Form 3 Dec 2025 (1).pdf10 Aug 2026
Withdrawal Update Form 3File: SIGNED FORM 3_compressed.pdf10 Aug 2026
Withdrawal Update Form 1File: form-1.pdf28 Oct 2025
Withdrawal Update Form 2File: RERA CERT- EKTA-1.pdf28 Oct 2025
Withdrawal Update Form 3File: Build Square Form 3 (1).pdf28 Oct 2025
Form 1File: FORM 1 June 2025.pdf4 Aug 2025
Form 2File: Form-2 June 2025_signed.pdf4 Aug 2025
Form 3File: form 3.pdf4 Aug 2025
Disclosure of Sold and Booked InventoryFile: Inventory Disclosure June 25.pdf4 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 24.pdf12 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf11 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3_Form -2.pdf11 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_Domain Build Square QUALITY ASSURANCE_TILL Mar 2024.pdf11 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf6 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sep 24.pdf8 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 June-24.pdf8 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sep 24.pdf8 Jan 2025
Disclosure of sold/ booked inventoryFile: DIsclosure for Sold and Unsold inventory as on 31-03-24.pdf8 Jan 2025
Disclosure of sold/ booked inventoryFile: Inventory Disclosure.pdf8 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 Signed.pdf21 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf22 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf22 Nov 2024
Proforma of Agreement for saleFile: 21092024 _ Finalised_AFS Clean.pdf7 Oct 2024
Details of encumbrancesFile: Encumbraces.pdf7 Oct 2024
Details of encumbrancesFile: Encumbraces.pdf7 Oct 2024
Proforma of Agreement for saleFile: 21092024 _ Finalised_AFS Clean.pdf7 Oct 2024
Proforma of Agreement for saleFile: Finalised_09052024_Domain AFS Final Clean.pdf10 May 2024
Proforma of Allotment letterFile: Finalised_09052024_Domain Allotment Letter Final.pdf10 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 as on 31-03-24(1).pdf25 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf17 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf17 Apr 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF INVENTORY_DEC-23.pdf28 Feb 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD_MARCH-2023.pdf23 Feb 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF INVENTORY.pdf23 Feb 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF INVENTORY_SEP-23.pdf23 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Build Square Form 3.pdf19 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A.pdf7 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM_1.pdf25 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2_.pdf25 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2__.pdf25 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2 (2).pdf25 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5_.pdf23 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3.pdf23 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sept 2023.pdf22 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf20 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf16 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form_3.pdf26 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3.pdf26 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3.pdf26 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1.pdf3 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2.pdf3 May 2023
Deviation Report with respect to Allotment letterFile: SCAN_20230221_160656593.pdf22 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final signed Form 3 Dec-21.pdf18 Feb 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Sep 22.pdf7 Feb 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Details Dec-22.pdf7 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec-22_c.pdf7 Feb 2023
Deviation Report with respect to model copy of AgreementFile: Final Deviation wrt Sales_.pdf7 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architech Certificate_30092022.pdf2 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Form 1.pdf2 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Form 2.pdf2 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Rera 30092022.pdf31 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 dt19012023.pdf31 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Rera 30092022.pdf29 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A_Domain Build Square QUALITY ASSURANCE_TILL Sept 2022.pdf29 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 as of 30 Jun 2022.pdf11 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 RERA CERT- EKTA-30-6-2022 (1).pdf11 Nov 2022
Disclosure of sold/ booked inventoryFile: Disclousre of Sold Unsold Inventory as of 30 Jun 2022.pdf11 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: fORM 5.pdf11 Nov 2022
Proforma of Allotment letterFile: ALLOTMENT LETTER DOMAIN-Blank Draft PDF.pdf4 Nov 2022
Proforma of Agreement for saleFile: AGREEMENT FOR SALE- Domain-Blank PDF.pdf4 Nov 2022
Details of encumbrancesFile: Encumbrance Certificate for RERA 080822.pdf3 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Form A.pdf3 Nov 2022
Details of encumbrances concerned to LegalFile: Legal Declaration.pdf19 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 as of 30 Sept 2021.pdf13 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - EKTA-31-3-2021.pdf13 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as of 30 Sept 2021.pdf13 Jun 2022

How this compares with Mumbai Suburban

70%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DOMAIN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Deonar Mumbai6,700+ in Mumbai Suburban

Builder: M/s Build Square

M/s Build Square has 1 registration on MahaRERA, including DOMAIN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if DOMAIN is delayed beyond 29 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DOMAIN?

The registered promoter entity is M/s Build Square, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DOMAIN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against DOMAIN?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for DOMAIN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DOMAIN?

The professionals named in the filing: Architect: DOT Architects; Engineer: GIREESH M. RAJADHYAKSHA; Engineer: Kamlesh Gurav; Chartered Accountant: Thar & Co; Chartered Accountant: Daya & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DOMAIN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DOMAIN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DOMAIN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.