Home / Browse projects / Mumbai Suburban, Maharashtra / North Star

Registered No litigation declared Residential / Group Housing project

North Star

By North Property Developers LLP

RG-MH-33828 · RERA P51800033438 · Last updated on MahaRERA portal: 5 Jun 2026

Source: official MahaRERA filing

Red flags

  • 4 complaints at MahaRERA
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Apr 2027Possession promisedmoved 18 months from the original
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 95%
138 of 486Units unsoldnot recorded sold or booked
4Complaints at MahaRERAon this registration
Jump to the 150 documents Report an error

North Star is a Residential / Group Housing project by North Property Developers LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800033438 on 22 Feb 2022. Possession is promised by 30 Apr 2027. The completion date has moved by 18 months from the original filing. 348 of the 486 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete. 4 complaints are on record with the regulator.

At a glance

Project

  • NameNorth Star
  • TypeResidential / Group Housing
  • Location
    • P L Lokhande Marg Village Borla
    • Govandi
    • Kurla
    • Mumbai Suburban
    • 400043
  • Pincode400043
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800033438
  • ReraGenie IDRG-MH-33828

Builder

  • NameNorth Property Developers LLP
  • Entity typePartnership
  • GSTIN27AAOFN9206B1Z9
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnerRajan Prafulchandra Shah
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2022First promiseOct 2025Revised toApr 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Feb 2022
  • Promised completion30 Apr 2027
  • Revised completionRevised to 30 Apr 2027 (originally 31 Oct 2025)
  • Buildings1 building record
  • Documents filed150 files

Current status

72%348 of 486 units booked
91.5%Work done, per cost certificate

Figures as on 5 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
North StarNA23214860486

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 95%.

North Star: 43% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks23%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.23%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed216

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots216
Closed/Covered216

Land and ownership8

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,842 sq m
Land owned byThe promoter, with other names on the file
Named landowners8
LandownerVillageDistrict
GAUTAM NAGAR SRA CHS LTDKurlaMumbai Suburban
VITHAL KRUPA (B) SRA CHS LTDKurlaMumbai Suburban
JAI HANUMAN SRA CHS LTDKurlaMumbai Suburban
SHREE SAI SRA CHS LTDKurlaMumbai Suburban
GAUTAM NAGAR - A COLONY SRA CHS LTDKurlaMumbai Suburban
VITTHAL KRUPA CHS LTDKurlaMumbai Suburban
PANCHASHEEL SRA CHS LTDKurlaMumbai Suburban
EKTA SRA CHS LTDKurlaMumbai Suburban

Approvals and building plan

Sanctioning authoritySRA
Permissible FSI28579.49
Proposed, not sanctioned28,579 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVile Parle West Mumbai 400056
Estimated costRs 156.33 cr
Cost incurredRs 143.07 cr
Work done91.52%
BuildingWingEstimatedIncurred
North StarNARs 156.33 crRs 143.07 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJitendra B Patel
EngineerKalpesh K Jobalia
Chartered AccountantJaykaran Gupta & Co
Chartered AccountantGMJ & Co
PartnerRole in project
North Property Developers LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA20052621033Oct 2025 → Apr 2027

Reason as filed by the promoterWe, North Property Developers LLP, the promoter of the project North Star (Registration No. P51800033438) under MahaRERA, hereby submit our request for an extension of time for the completion of the project. We apologize for the delay in the completion of the project and the submission of this request. The delay was primarily due to delayed approvals from the concerned authorities, including a delay in receiving the Height NOC from the Airports Authority of India (AAI). While the building plan was sanctioned up to the 33rd floor, the Height NOC was initially granted only up to the 21st floor,

Complaints filed with MahaRERA4

Case no.ComplainantRespondentFiled
CC12601162nitin shantaram dhavaleNorth Property Developers LLP03/03/2026
CC12602923VAGATARAM PURAJI CHOUDHARYNorth Property Developers LLP18/05/2026
CC12604287Rohit Ramachandran NairNorth Property Developers LLP08/07/2026
CC12604286Ajit Ramachandran NairNorth Property Developers LLP08/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jan 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Aug 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Aug 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2027

Documents filed150

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 150 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 March 2026 North star.pdf5 Jun 2026
Withdrawal Update Form 2File: Form 2 March 2026 North Star.pdf5 Jun 2026
Withdrawal Update Form 3File: Form 3 March 2026.pdf5 Jun 2026
Withdrawal Update Form 1File: Form 1 March 2026 North star.pdf4 Jun 2026
Withdrawal Update Form 2File: Form 2 March 2026 North Star.pdf4 Jun 2026
Withdrawal Update Form 3File: Form 3 NPD Rera Certificate signed.pdf4 Jun 2026
Form 2A (FY 2024-2025)File: Form 2A.pdf19 Feb 2026
Form 5 (FY 2024-2025)File: Form 5 FY 24-25 Phase 1.pdf18 Feb 2026
Withdrawal Update Form 1File: Form 1 architects certificate Dec 25.pdf21 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Dec 25.pdf21 Jan 2026
Withdrawal Update Form 3File: Form 3 NPD Rera Certificate signed.pdf21 Jan 2026
Withdrawal Update Form 1File: Form 1 architects certificate Sep 25.pdf19 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate Sep 25.pdf19 Jan 2026
Withdrawal Update Form 3File: Form 3 NPD Rera Certificate signed.pdf19 Jan 2026
Withdrawal Update Form 1File: Form 1 architects certificate June 25.pdf15 Jan 2026
Withdrawal Update Form 1File: Form 1 architects certificate June 25.pdf15 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate June 25.pdf15 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate June 25.pdf15 Jan 2026
Withdrawal Update Form 3File: Form 3 NPD Rera Certificate signed.pdf15 Jan 2026
Withdrawal Update Form 3File: Form 3 NPD Rera Certificate signed.pdf15 Jan 2026
Commencement certificateFile: Sale bldg Further CC.pdf23 Aug 2025
Building plan approvalFile: S6 Plan 30052025 3.pdf23 Aug 2025
Building plan approvalFile: S6 Plan 30052025 4.pdf23 Aug 2025
Building plan approvalFile: S6 Plan 30052025 5.pdf23 Aug 2025
Building plan approvalFile: S6 Plan 30052025 6.pdf23 Aug 2025
Building plan approvalFile: S6 Plan 30052025 8.pdf23 Aug 2025
Building plan approvalFile: S6 Plan 30052025 9.pdf23 Aug 2025
Building plan approvalFile: S6 Plan 30052025 7.pdf23 Aug 2025
Building plan approvalFile: S6 Plan 30052025 10.pdf23 Aug 2025
Building plan approvalFile: S6 Plan 30052025 11.pdf23 Aug 2025
Building plan approvalFile: S6 Plan 30052025 12.pdf23 Aug 2025
Building plan approvalFile: S6 Plan 30052025 1 2.pdf23 Aug 2025
Withdrawal Update Form 1File: Form 1 architects certificate June 25.pdf23 Aug 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate June 25.pdf23 Aug 2025
Withdrawal Update Form 3File: Form 3 NPD Rera Certificate signed.pdf23 Aug 2025
Form 1File: Form 1 architect's certificate.pdf18 Aug 2025
Form 2File: Form 2 Engineer Certificate.pdf18 Aug 2025
Form 3File: Form 3 NPD Rera Certificate.pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold and unsold inventory.pdf18 Aug 2025
Form 1File: Form 1 architect's certificate.pdf18 Aug 2025
Form 2File: Form 2 Engineer Certificate.pdf18 Aug 2025
Form 3File: Form 3 NPD Rera Certificate.pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold and unsold inventory.pdf18 Aug 2025
Form 1File: Form 1 architect's certificate Sep 24.pdf14 Aug 2025
Form 2File: Form 2 Engineer Certificate Sep 24.pdf14 Aug 2025
Form 3File: Form 3 NPD Rera Certificate signed SEP 2024.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold and unsold inventory Sep 24.pdf14 Aug 2025
Form 1File: Form 1 architect's certificate June 24.pdf14 Aug 2025
Form 2File: Form 2 Engineer Certificate June 24.pdf14 Aug 2025
Form 3File: Form 3 NPD Rera Certificate June 24.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold and unsold inventory June 24.pdf14 Aug 2025
Form 1File: Form 1 architect's certificate Mar 24.pdf14 Aug 2025
Form 2File: Form 2 Engineer Certificate Mar 24.pdf14 Aug 2025
Form 3File: Form 3 NPD Rera Certificate Mar 24.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold and unsold inventory Mar'24.pdf14 Aug 2025
Form 1File: Form 1 architect's certificate Dec 23.pdf14 Aug 2025
Form 2File: Form 2 Engineer Certificate Dec 23.pdf14 Aug 2025
Form 3File: Form 3 NPD Rera Certificate Dec 23.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold and unsold inventory Dec'23.pdf14 Aug 2025
Form 1File: Form 1 architect's certificate Sep 23.pdf14 Aug 2025
Form 2File: Form 2 Engineer Certificate Sep 23.pdf14 Aug 2025
Form 3File: Form 3 NPD Rera Certificate Sep 23.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold and unsold inventory Sep'23.pdf14 Aug 2025
Form 1File: Form 1 architect certificate June 23.pdf14 Aug 2025
Form 2File: Form 2 Engineer Certificate June 23.pdf14 Aug 2025
Form 3File: Form 3 NPD Rera Certificate June 23.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold and unsold inventory June'23.pdf14 Aug 2025
Form 1File: Form 1 architect's certificate Mar 23.pdf14 Aug 2025
Form 2File: Form 2 Engineer Certificate Mar 23.pdf14 Aug 2025
Form 3File: Form 3 NPD Rera Certificate Mar 23.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold and unsold inventory Mar 23.pdf14 Aug 2025
Form 1File: Form 1 architect's certificate Dec 22.pdf14 Aug 2025
Form 2File: Form 2 Engineer Certificate Dec 22.pdf14 Aug 2025
Form 3File: Form 3 NPD Rera Certificate Dec 22.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold and unsold inventory Dec 22.pdf14 Aug 2025
Form 1File: Form 1 architects certificate Mar 22.pdf14 Aug 2025
Form 2File: Form 2 Engineer Certificate Mar 22.pdf14 Aug 2025
Form 3File: Form 3 NPD Rera Certificate Mar 22.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold and unsold inventory Mar 22.pdf14 Aug 2025
Form 1File: Form 1 architect's certificate Dec 24.pdf11 Jun 2025

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
9 NORTHUPPER CHEMBUR MUMBAI 400043171CompletedJan 2020Jan 2020

How this compares with Mumbai Suburban

72%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 18 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep North Star on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Govandi6,700+ in Mumbai Suburban

2 kmNorth StarCompleted 111Lapsed / revoked 89Other 93Dot size: filed unitsN

Filed coordinates, straight-line distance. 293 registered projects within 2 km.

Builder: North Property Developers LLP

North Property Developers LLP has 2 registrations on MahaRERA, including North Star and North Star-2nd Phase. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if North Star is delayed beyond 30 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of North Star?

The registered promoter entity is North Property Developers LLP, a partnership as per the filing. Its GSTIN 27AAOFN9206B1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in North Star?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against North Star?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for North Star?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at North Star?

The professionals named in the filing: Architect: Jitendra B Patel; Engineer: Kalpesh K Jobalia; Chartered Accountant: Jaykaran Gupta & Co; Chartered Accountant: GMJ & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in North Star?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About North Star. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save North Star to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.