SAKET WORLD

By Anand Associates

RG-MH-27976 · RERA P51700024797 · Last updated on MahaRERA portal: 22 Jan 2025

Source: official MahaRERA filing

Red flags

  • Litigation declared, 6 cases
  • Rs 30.00 crore secured on the land, in favour of Aditya Birla Finance Ltd

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2026Possession promisedregistration recorded completed
5 of 66Construction stages doneacross 6 buildings; furthest along: Staircases, 80%
21 of 159Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 111 documents Report an error

SAKET WORLD is a Others project by Anand Associates in Thane, Maharashtra, registered with MahaRERA as P51700024797 on 9 Mar 2020. The registration is recorded completed; possession was promised by 30 Jun 2026. 138 of the 159 units on this registration are recorded sold or booked, and 5 of 66 construction stages are filed complete.

At a glance

Project

  • NameSAKET WORLD
  • TypeOthers
  • Location
    • Hajimalang Road
    • Near Chetana School
    • PISAVALI
    • Kalyan
    • Thane
    • 421306
  • Pincode421306
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700024797
  • ReraGenie IDRG-MH-27976

Builder

  • NameAnand Associates
  • Entity typePartnership
  • GSTIN27AAPFM0496D1Z3
  • PartnersKuldeep Panchamprasad Dubey, Sunilkumar Premnarayan Mishra, Vijayprakash Sarjuprasad Mishra, Shailesh Vinod Tiwari, Vinod Ramujagar Tiwari
  • Other registrations4 more →
  • Completed2 of 5
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredMar 2020PromisedJun 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Mar 2020
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings6 building records
  • Documents filed111 files

Current status

87%138 of 159 units booked
84.6%Work done, per cost certificate

Figures as on 22 Jan 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building Type ANA2701590159
Building Type BNA00000
Building Type CNA00000
Building Type DNA00000
Building Type E, Wing ANA00000
Building Type E, Wing BNA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 22 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Staircases, at 80%.

Building Type A68%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)50%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building Type B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building Type C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building Type D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building Type E, Wing A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building Type E, Wing B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities17

As on 22 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes5%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
Fire Protection And Fire Safety RequirementsYes0%
Energy managementYes0%

Parking filed228

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots228
Closed/Covered228

Land and ownership2

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area3,612 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Finance Ltd
Secured amountRs 30.00 crore
Declared on28 Sep 2024
LandownerVillageDistrict
Govind Dunda Shisve & OthersPISAVALIThane
Saguna Hari Gaikwad & OthersPISAVALIThane

Approvals and building plan

Sanctioning authorityKalyan Dombivali Municipal Corporation
Permissible FSI8316.69
Proposed, not sanctioned8,317 sq m
Buildings approved6
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCTS NO 3203 Old Suchak Niwas Next to Titan Show Room Murbad Road Kalyan West 421301
Estimated costRs 41.72 cr
Cost incurredRs 35.27 cr
Work done84.56%
BuildingWingEstimatedIncurred
Building Type ANARs 35.83 crRs 33.80 cr
-NARs 5.89 crRs 1.47 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDMD Architects
EngineerACME Management Solutions & Value Engineering
EngineerABHINEET BAJPAI
Chartered AccountantAttar & Associates
Chartered AccountantM F ATTAR
PartnerRole in project
Anand Associates-

Litigation declared6

CaseCourtStatus
349/2015/2015Civil Judge Senior Division KalyanOngoing
143/2019/2019Civil Judge Junior Division KalyanOngoing
144/2019/2019Civil Judge Junior Division KalyanOngoing
154/2019/2019Civil Judge Junior Division KalyanOngoing
43/2021/2021Civil Judge Junior Division KalyanOngoing
349/2015/2015Civil Judge Senior Division KalyanOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jun 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Jun 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 16 Oct 2024

Documents filed111

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 111 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AA Bldg B Form 1 dt 31 12 24.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AA Bldg B Form 3 dt 31 12 24_compressed.pdf22 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AA Bldg B Form 2 dt 31 12 24.pdf22 Jan 2025
Disclosure of sold/ booked inventoryFile: AA Bldg B Sold Unsold Inventory dt 31 12 24.pdf22 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Bldg A Form 5.pdf10 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Architect Certificate Form 4 Bldg A.pdf16 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Bldg A Occupancy Certificate dt 12 07 2024.pdf16 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Building Type A Form 5.pdf21 Mar 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked unsold inventory.pdf10 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Building Type A Form 3.pdf10 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Building Type A_compressed.pdf10 Jul 2023
Disclosure of sold/ booked inventoryFile: Building Type A Sold Unsold Inventory- ok_compressed (1).pdf6 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Saket world Building Type A- ok_compressed.pdf6 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FY 2019-20 - Form 5.pdf28 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Building Type A - Form 5.pdf31 Jan 2023
Disclosure of sold/ booked inventoryFile: Disclosure Bldg A compressed.pdf26 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BUILDING TYPE A FORM 3_compressed.pdf26 Dec 2022
Disclosure of sold/ booked inventoryFile: Form 3 Bldg A.pdf20 Sep 2022
Disclosure of sold/ booked inventoryFile: Sold Unsold unit Bldg A.pdf20 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Bldg A.pdf20 Sep 2022
Disclosure of sold/ booked inventoryFile: A Sold Unsold Inventory.pdf26 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: A FORM 3.pdf26 Aug 2022
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold inventory Building type A.pdf9 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Building Type A.pdf9 May 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Document Building Type A.pdf9 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate Building Type A.pdf5 May 2022
CERSAI detailsFile: CERSAI Report 1.pdf5 May 2022
CERSAI detailsFile: CERSAI Report.pdf5 May 2022
Disclosure of sold/ booked inventoryFile: BLDG TYPE A SOLD UNSOLD LIST compressed.pdf13 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BLDG TYPE A Form 3 compressed.pdf13 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA Form 5.pdf15 Mar 2022
CERSAI detailsFile: Cersai Declaration - Building Type A.pdf3 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer Form 2A on Quality Assurance.pdf25 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Disclosure of sold booked Inventory- Building Type A.pdf25 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Building Type A Engineer Certificate on Quality Assurance Form 2A.pdf25 Nov 2021
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked Inventory- Building Type A.pdf24 Nov 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3.pdf24 Nov 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineers Form 2A.pdf17 Aug 2021
Copy of the legal title reportFile: Title_compressed.pdf9 Aug 2021
Proforma of Allotment letterFile: Revised Draft sale agreement A - new.pdf9 Aug 2021
OtherFile: Declaration regarding Independent RERA number.pdf9 Aug 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold- Booked- Unsold Inventory.pdf21 Jul 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Type A.pdf16 Jul 2021
Proforma of Allotment letterFile: Revised Draft sale agreement.pdf23 Jun 2021
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate- Format D.pdf22 Jun 2021
Building plan approvalFile: Building Type A- Plan 2.pdf19 Jun 2021
Building plan approvalFile: Building Type A- Plan 3.pdf19 Jun 2021
Building plan approvalFile: Building Type A -Plan 4.pdf19 Jun 2021
Building plan approvalFile: Building Type A- Plan 5.pdf19 Jun 2021
Building plan approvalFile: Building Type A- Plan 6.pdf19 Jun 2021
Building plan approvalFile: Building Type A- Plan 7.pdf19 Jun 2021
Building plan approvalFile: Building Type B- Plan 8.pdf19 Jun 2021
Building plan approvalFile: Building Type B- Plan 9.pdf19 Jun 2021
Building plan approvalFile: Building Type B- Plan 10.pdf19 Jun 2021
Building plan approvalFile: Building Type B- Plan 11.pdf19 Jun 2021
Building plan approvalFile: Building Type B- Plan 12.pdf19 Jun 2021
Layout approvalFile: AA-2nd Revision- Building Type A - Layout Plan-1.pdf19 Jun 2021
Copy of Layout Approval (in case of layout)File: AA-2nd Revision- Building Type A - Layout Plan-1.pdf19 Jun 2021
Building Plan Approval / NA Order for plotted developmentFile: Building Type A- Plan 2.pdf19 Jun 2021
Building Plan Approval / NA Order for plotted developmentFile: Building Type A- Plan 3.pdf19 Jun 2021
Building Plan Approval / NA Order for plotted developmentFile: Building Type A -Plan 4.pdf19 Jun 2021
Building Plan Approval / NA Order for plotted developmentFile: Building Type A- Plan 5.pdf19 Jun 2021
Building Plan Approval / NA Order for plotted developmentFile: Building Type A- Plan 6.pdf19 Jun 2021
Building Plan Approval / NA Order for plotted developmentFile: Building Type A- Plan 7.pdf19 Jun 2021
Building Plan Approval / NA Order for plotted developmentFile: Building Type B- Plan 8.pdf19 Jun 2021
Building Plan Approval / NA Order for plotted developmentFile: Building Type B- Plan 9.pdf19 Jun 2021
Building Plan Approval / NA Order for plotted developmentFile: Building Type B- Plan 10.pdf19 Jun 2021
Building Plan Approval / NA Order for plotted developmentFile: Building Type B- Plan 11.pdf19 Jun 2021
Building Plan Approval / NA Order for plotted developmentFile: Building Type B- Plan 12.pdf19 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf19 Jun 2021
Disclosure of sold/ booked inventoryFile: Disclosure of Sold- Booked- Unsold Inventory compressed.pdf27 May 2021
OtherFile: Disclosure of Sold- Booked- Unsold Inventory compressed.pdf30 Apr 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AA CA Form 3.pdf16 Jan 2021
Details of Restarting of Construction work post lockdownFile: Restarting Construction Post Lockdown.pdf28 Aug 2020
OtherFile: Declaration Plot Area.pdf28 Aug 2020
OtherFile: Declaration BuiltUp Area.pdf28 Aug 2020
OtherFile: Declaration Cost of Construction.pdf28 Aug 2020
Proforma of Allotment letterFile: Allotment ltr.pdf27 Aug 2020
Proforma of Allotment letterFile: AA Sale Agreement final.pdf27 Aug 2020
Layout approvalFile: Layout -1.pdf11 Aug 2020

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Saket ParadiseSaket Paradise Near Adharwadi Jail Road Kalyan West 421301340CompletedNov 2012Late, Nov 2012

How this compares with Thane

87%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAKET WORLD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Chetana School7,600+ in Thane

2 kmSAKET WORLDCompleted 41Lapsed / revoked 38Other 100Dot size: filed unitsN

Filed coordinates, straight-line distance. 179 registered projects within 2 km.

Builder: Anand Associates

ANAND ASSOCIATES has 5 registrations on MahaRERA, including SHREE BALAJI RESIDENCY and ANAND BLOSSOM. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SAKET WORLD is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAKET WORLD?

The registered promoter entity is Anand Associates, a partnership as per the filing. Its GSTIN 27AAPFM0496D1Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAKET WORLD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAKET WORLD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAKET WORLD?

The professionals named in the filing: Architect: DMD Architects; Engineer: ACME Management Solutions & Value Engineering; Engineer: ABHINEET BAJPAI; Chartered Accountant: Attar & Associates; Chartered Accountant: M F ATTAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAKET WORLD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAKET WORLD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAKET WORLD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.