Home / Browse projects / Saif towers
Saif towers
By Mustanshir Saifuddin Merchant
RG-MH-98229 · RERA P51900012891 · Last updated on MahaRERA portal: 9 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 2 complaints at MahaRERA
- Completion date moved by 72 months
- 3 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Saif towers is a Residential / Group Housing project by Mustanshir Saifuddin Merchant in Byculla, 400010, registered with MahaRERA as P51900012891 on 7 Sep 2017. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 72 months from the original filing. 27 of the 72 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.
At a glance
Project
- NameSaif towers
- TypeResidential / Group Housing
- Location
- Rambhau Bhogale Marg
- Byculla
- 400010
- Pincode400010
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900012891
- ReraGenie IDRG-MH-98229
Builder
- NameMustanshir Saifuddin Merchant
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on7 Sep 2017
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 31 Dec 2019)
- Buildings1 building record
- Documents filed85 files
Current status
Figures as on 9 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Saif Towers | NA | 26 | 18 | 67 | 5 | 72 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 9 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 98%.
Saif Towers: 89% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 98% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities15
As on 9 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | Yes | 70% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 90% |
| Water conservation /Rain water harvesting | Yes | 60% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 85% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Saif Towers | NA | Rs 12.10 cr | Rs 11.77 cr |
| - | NA | Rs 59.53 lakh | Rs 4.10 lakh |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Abid Rizvi & Associates |
| Architect | Suhel Waghoo |
| Engineer | B Yusuf Amin |
| Engineer | Yusuf Amin Burgujar |
| Chartered Accountant | Ca Esha Bhanushali |
| Chartered Accountant | Iqbal A Sayyid |
| Chartered Accountant | Hitendra Panchal |
| Chartered Accountant | SLK and Associates |
| Partner | Role in project |
|---|---|
| Mustanshir Saifuddin Merchant | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe would be requiring an extension as construction is not yet completed and we are planning to complete it by next year and ensure possession with in the time frame.
Reason as filed by the promoterDue to certain permission issues project could not be completed on time and due to changes in policy and Incentive FSI we were in process of getting approvals upto 22 Habitable floors we got the IOD and are expecting CC by mid of june 2024 (which we were supposed to get by March 24 but due to elections etc were not able to get the same), Hence we request to kindly extend the completion date to 31-12-24
Reason as filed by the promoterThe construction project is nearing completion, with only a few finishing tasks remaining. Due to funding constraints, there was a delay in the completion of the project. However, work is now back on track and is expected to be finished before December 2025. An extension request has been submitted for a deadline of December 2025. Further as per clause 14 (2) (ii) (Explanation Note) the allottees, irrespective of the number of apartments or plots, as the case may be, booked by him or booked in the name of his family, or companies or firms or any association etc;, booked in its name or its assoc
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000044499 | Javed Hussain Siddiqui & Ambrin Javed Hussain Siddiqui | M M Realtors | 21/06/2018 |
| CC006000000055411 | Zulfikar Yusufali Kazi | M.M.Realtors | 17/07/2018 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 11 Aug 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Aug 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Aug 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed85
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 June 25.pdf | 9 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Sep 25.pdf | 9 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Dec 25.pdf | 9 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 June 25.pdf | 9 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Sep 25.pdf | 9 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Dec 25.pdf | 9 Apr 2026 |
| Withdrawal Update Form 3File: MM Realtorss Form 3 310323.pdf | 9 Apr 2026 |
| Withdrawal Update Form 3File: MM Realtorss Form 3 310323.pdf | 9 Apr 2026 |
| Withdrawal Update Form 3File: MM Realtorss Form 3 310323.pdf | 9 Apr 2026 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf | 21 Jun 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Fianl Uplaod.pdf | 19 Jun 2025 |
| Certificates of CA (Form 3)File: MM Form 3 Mar 2024.pdf | 6 May 2025 |
| Certificates of CA (Form 3)File: MM Form 3 June 2024.pdf | 6 May 2025 |
| Certificates of CA (Form 3)File: MM Form 3 Sep 2024.pdf | 6 May 2025 |
| Certificates of CA (Form 3)File: MM Form 3 Dec 2024.pdf | 6 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Mar 2024.pdf | 6 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 June 2024.pdf | 6 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sep 2024.pdf | 6 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec 2024.pdf | 6 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Mar 2025.pdf | 6 May 2025 |
| Declaration in FORM BFile: Form B M M.pdf | 25 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: New CC.pdf | 24 Apr 2025 |
| Declaration about Commencement CertificateFile: Declaration About C C.pdf | 24 Apr 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured.pdf | 23 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30-06-2024.pdf | 22 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 30-09-2024_compressed.pdf | 22 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31-12-2024_compressed.pdf | 22 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31-03-2024.pdf | 22 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 31-03-2025_compressed.pdf | 22 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 310322 MM Realtorss.pdf | 11 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 310323 Mm Realtorss.pdf | 11 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 2022 MM Realtorss.pdf | 10 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 2023 MM Realtorss.pdf | 10 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 2024 MM Realtorss.pdf | 10 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 2022.pdf | 6 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 2023.pdf | 6 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 2024.pdf | 6 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 310321.pdf | 6 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 2022.pdf | 6 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 2023.pdf | 6 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold MM Realtorss.pdf | 6 Jun 2024 |
| Certificates of CA (Form 3)File: MM Realtorss Form 3 310322.pdf | 6 Jun 2024 |
| Certificates of CA (Form 3)File: MM Realtorss Form 3 310323.pdf | 6 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 310322.pdf | 6 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 310323.pdf | 6 Jun 2024 |
| Declaration in FORM BFile: fORM b dEC 311224.pdf | 2 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: fORM 2a 23-24.pdf | 2 Jun 2024 |
| Details of encumbrances concerned to FinanceFile: non encumbrance legal.pdf | 3 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: non encumbrance finance.pdf | 3 Aug 2023 |
| Details of encumbrances concerned to LegalFile: non encumbrance legal.pdf | 3 Aug 2023 |
| Details of encumbrances concerned to LegalFile: non encumbrance finance.pdf | 3 Aug 2023 |
| Declaration in FORM BFile: Latest form b declaration.pdf | 3 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2a 21-22.pdf | 3 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2a 22-23.pdf | 3 Aug 2023 |
| CERSAI detailsFile: cersai declaration.pdf | 3 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: interest in other organisation.pdf | 3 Aug 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank account declaration.pdf | 3 Aug 2023 |
| Declaration about Commencement CertificateFile: Latest commencement certificate.pdf | 11 May 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 2017-18.pdf | 3 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 2018-19.pdf | 3 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2019-20.pdf | 3 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf | 3 Sep 2021 |
| Declaration about Commencement CertificateFile: Declaration on CC.pdf | 31 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A C1 pg 1 19.pdf | 31 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A C2 pg 1 19.pdf | 31 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A C3 pg 1 19.pdf | 31 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A C4 pg 2 19.pdf | 31 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A C1 pg 1 20.pdf | 31 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A C2 pg 1 20.pdf | 31 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A C3 pg 1 20.pdf | 31 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A C4 pg 1 20.pdf | 31 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold Unsold Inventory.pdf | 31 Aug 2021 |
| Proforma of Allotment letterFile: Mushtaq bhai AFS.pdf | 12 Aug 2017 |
| Layout approvalFile: LAyout plan.pdf | 11 Aug 2017 |
| Building plan approvalFile: IOD.pdf | 11 Aug 2017 |
| PAN CardFile: PAn Card.pdf | 11 Aug 2017 |
| Copy of the legal title reportFile: TITLE.pdf | 11 Aug 2017 |
| Details of encumbrancesFile: Encumberence.pdf | 11 Aug 2017 |
| Copy of Layout Approval (in case of layout)File: LAyout plan.pdf | 11 Aug 2017 |
| Building Plan Approval (IOD)File: IOD.pdf | 11 Aug 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 85 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Saif towers on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Byculla
Filed coordinates, straight-line distance. 42 registered projects within 2 km.
Piramal Aranya - Wing B
Glider Buildcon Realtors Private Limited
TARABAUG
DARSHAN DEVELOPERS
A. M. Residency
ALFA MANA REALTORS PVT LTD
Piramal Aranya - Wing C
Glider Buildcon Realtors Private Limited
Piramal Aranya - Ahan 2
Glider Buildcon Realtors Private Limited
10 HARBOUR ESTATES
NAN ENTERPRISES
Builder: Mustanshir Saifuddin Merchant
Mustanshir Saifuddin Merchant has 1 registration on MahaRERA, including Saif towers. Its filings disclose no earlier MahaRERA projects. Read the full track record.
Frequently asked questions
What does it mean that Saif towers shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Saif towers is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Saif towers?
The registered promoter entity is Mustanshir Saifuddin Merchant, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Saif towers?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Saif towers?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Saif towers?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Saif towers?
The professionals named in the filing: Architect: Abid Rizvi & Associates; Architect: Suhel Waghoo; Engineer: B Yusuf Amin; Engineer: Yusuf Amin Burgujar; Chartered Accountant: Ca Esha Bhanushali; Chartered Accountant: Iqbal A Sayyid. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Saif towers?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback