Home / Browse projects / Aurangabad, Maharashtra / SAI SUMAN PRIDE
SAI SUMAN PRIDE
RG-MH-14725 · RERA P51500047705 · Last updated on MahaRERA portal: 7 May 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SAI SUMAN PRIDE is a Others project by AADESHWAR CONSTRUCTION in Aurangabad, Maharashtra, registered with MahaRERA as P51500047705 on 21 Nov 2022. The registration is recorded completed; possession was promised by 24 Nov 2024.
At a glance
Project
- NameSAI SUMAN PRIDE
- TypeOthers
- Location
- PLOT NO 7
- CTS NO 15731/10
- SHRIRAM NAGAR
- GARKHEDA
- AURANGABAD
- Aurangabad (M Corp.)
- Aurangabad
- 431001
- Pincode431001
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51500047705
- ReraGenie IDRG-MH-14725
Builder
- NameAADESHWAR CONSTRUCTION
- Entity typePartnership
- GSTIN27ABXFA2788F1ZU
- PartnersPAWANKUMAR SUGANCHAND MUGDIYA, GAUTAM MANGILAL KATARIYA
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on21 Nov 2022
- Promised completion24 Nov 2024
- Revised completionNone
- Buildings1 building record
- Documents filed58 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SAI SUMAN PRIDE | NA | 7 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 7 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.
SAI SUMAN PRIDE: 80% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Progress on shared amenities16
As on 7 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 95% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 95% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
| COMPOUND WALL AND GATE | Yes | 0% |
Parking filed12
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SURESH NARAYAN TARGE | Aurangabad (M Corp.) | Aurangabad |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | LODHI SAJJAD SAJJAD |
| Engineer | ICON Consultants |
| Chartered Accountant | Yash Nagar Nagar |
| Chartered Accountant | Alkesh Rawka And Associates |
| Partner | Role in project |
|---|---|
| AADESHWAR CONSTRUCTION | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Oct 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Oct 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Oct 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 19 Feb 2025
Documents filed58
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architechts Certificate upto Sep 24.pdf | 7 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architechts Certificate upto Sep 24.pdf | 7 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Upto 30 Sept 24.pdf | 7 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Enginner Certificate upto Sep 24.pdf | 7 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory.pdf | 7 May 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Form 4 Architects Certificate.pdf | 19 Feb 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Chetak Ghoda Occupancy Certificate_0001.pdf | 18 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Upto 30 june 24_0001.pdf | 6 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Upto 30 june 24_0001.pdf | 6 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold unsold Certificate Upto 30 june 24_0001.pdf | 6 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 2024-25 Q1.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Upto 30 june 24_0001.pdf | 6 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Upto 30 june 24_0001.pdf | 6 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold unsold Certificate Upto 30 june 24_0001.pdf | 6 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 2024-25 Q1.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Upto 30 june 24_0001.pdf | 6 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Upto 30 june 24_0001.pdf | 6 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold unsold Certificate Upto 30 june 24_0001.pdf | 6 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 2024-25 Q1.pdf | 6 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Upto 30 june 24_0001.pdf | 6 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 2024-25 Q1.pdf | 6 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Upto 30 june 24_0001.pdf | 6 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold unsold Certificate Upto 30 june 24_0001.pdf | 6 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: AADESHWAR FORM 5 2022-23.pdf | 16 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: AADESHWAR FORM 5 2023-24.pdf | 16 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 21 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A upto 31 March 24.pdf | 21 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_c.pdf | 20 May 2024 |
| Disclosure of sold/ booked inventoryFile: Sold and Unsold.pdf | 20 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FOrm 3.pdf | 20 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_11zon.pdf | 14 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_11zon.pdf | 14 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory_0001.pdf | 6 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31-12-2023.pdf | 6 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 1 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 1 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 1 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_.pdf | 1 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 27 Oct 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200250165429_For_Asset_Based_Search_19_10_2022_13_56_06_006.pdf | 19 Oct 2022 |
| Layout approvalFile: Layout Plan.pdf | 18 Oct 2022 |
| Building plan approvalFile: Building Plan_11zon.pdf | 18 Oct 2022 |
| PAN CardFile: Aadeshwar Construction PAN.pdf | 18 Oct 2022 |
| Copy of the legal title reportFile: Search Report For RERA_11zon.pdf | 18 Oct 2022 |
| Details of encumbrances concerned to FinanceFile: Declaration_for_Emcumberance.pdf | 18 Oct 2022 |
| Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal .pdf | 18 Oct 2022 |
| Copy of Layout Approval (in case of layout)File: Layout Plan.pdf | 18 Oct 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan_11zon.pdf | 18 Oct 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Cert.pdf | 18 Oct 2022 |
| Declaration about Commencement CertificateFile: Decleration of Commencement Certificate.pdf | 18 Oct 2022 |
| Declaration in FORM BFile: Form_B_Developer.pdf | 18 Oct 2022 |
| Proforma of Agreement for saleFile: Agreement To Sale Format_11zon.pdf | 18 Oct 2022 |
| Proforma of Allotment letterFile: Agreement To Sale Format_11zon.pdf | 18 Oct 2022 |
| Proforma of Allotment letterFile: Allotement Letter Final_11zon.pdf | 18 Oct 2022 |
| Proforma of Agreement for saleFile: Allotement Letter Final_11zon.pdf | 18 Oct 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate_bank_account_decleration.pdf | 18 Oct 2022 |
| Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter.pdf | 18 Oct 2022 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to model copy of Agreement.pdf | 18 Oct 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Aurangabad
Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 58 filed documents as one ZIP, foldered, with a manifest
Keep SAI SUMAN PRIDE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near GARKHEDA, AURANGABAD1,400+ in Aurangabad
Filed coordinates, straight-line distance. 133 registered projects within 2 km.
Capital Trade Centre
KRK Landmark LLP
AQ TOWN
AQ INFRASTRUCTURE PRIVATE LIMITED
KALYANI SAI VISHWA
RAJASHREE UDYOG
AMRUT SAI PLAZA PH 2
Shree Amrut Sai Developer Pvt.Ltd
PRASSANA HIGH CLASS CITY PHASE - I
SHRI KRISHNA NAGAR SAHAKARI GRAH NIRMAN SA
SHRIRAM RESIDENCY
UNIQUE BUILDCON
See every Aurangabad project, with the district possession charts
Builder: AADESHWAR CONSTRUCTION
AADESHWAR CONSTRUCTION has 1 registration on MahaRERA, including SAI SUMAN PRIDE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.
Frequently asked questions
What are my rights if SAI SUMAN PRIDE is delayed beyond 24 Nov 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SAI SUMAN PRIDE?
The registered promoter entity is AADESHWAR CONSTRUCTION, a partnership as per the filing. Its GSTIN 27ABXFA2788F1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SAI SUMAN PRIDE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SAI SUMAN PRIDE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SAI SUMAN PRIDE?
The professionals named in the filing: Architect: LODHI SAJJAD SAJJAD; Engineer: ICON Consultants; Chartered Accountant: Yash Nagar Nagar; Chartered Accountant: Alkesh Rawka And Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SAI SUMAN PRIDE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback