Home / Browse projects / Thane, Maharashtra / Sai Shrushti Vatika Gajanan Alimkar

Registration lapsed No litigation declared Residential / Group Housing project

Sai Shrushti Vatika Gajanan Alimkar

By SAI SHRUSHTI ENTERPRISES

RG-MH-63812 · RERA P51700033427 · Last updated on MahaRERA portal: 4 Apr 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
30 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 28 documents Report an error

Sai Shrushti Vatika Gajanan Alimkar is a Residential / Group Housing project by SAI SHRUSHTI ENTERPRISES in Thane, Maharashtra, registered with MahaRERA as P51700033427 on 22 Feb 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date.

At a glance

Project

  • NameSai Shrushti Vatika Gajanan Alimkar
  • TypeResidential / Group Housing
  • Location
    • Diva Shil Road
    • Dawale
    • Chavindra
    • Thane
    • 400612
  • Pincode400612
  • RERA no.P51700033427
  • ReraGenie IDRG-MH-63812

Builder

  • NameSAI SHRUSHTI ENTERPRISES
  • Entity typePartnership
  • GSTIN27ACKFS0306D1ZH
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersABHIJIT BHARAT ALIMKAR, MAHAVIR PRAVIN MEHTA, NILKANTH YADAV BHAGAT
  • Other registrations13 more →
  • Completed8 of 14
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

10 months past promisethis monthRegisteredFeb 2022PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on22 Feb 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings3 building records
  • Documents filed28 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ANA90000
BNA90000
CNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 4 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

30 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities17

As on 4 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Solar Panel InstallationYes100%
DG Set InstallationYes100%

Parking filed3

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3
Closed/Covered3
BuildingClosed/CoveredTotal
A11
B11
C11

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,202 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
Anant Gajanan AlimkarThane (M Corp.)Thane
Baliram Gajanan AlimkarThane (M Corp.)Thane
Vasudev Gajanan AlimkarThane (M Corp.)Thane
Fulaji Gajanan AlimkarThane (M Corp.)Thane

Approvals and building plan

Permissible FSI9448.34
Proposed, not sanctioned9,448 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor Diva East

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJoshi Deshaware & Associates
EngineerAjay Mahale Consulting Engineer
Chartered AccountantHemant Shetty & Co
Chartered AccountantShetty & Shetty
PartnerRole in project
SAI SHRUSHTI ENTERPRISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Feb 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 4 Apr 2025

Documents filed28

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Sai Shrushti Vatika oc A , B, C.pdf4 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_Vatika.pdf10 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Form_3_SAI SHRUSHTI VATIKA.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2_Vatika.pdf10 Mar 2025
Other - LegalFile: Sai Srushti Vatika_Part OC C.pdf10 Mar 2025
Other - LegalFile: Form_4_Vatika.pdf10 Mar 2025
Status of Formation of Legal Entity (Society/Co Op etc.)File: Vatika Society Certificate.pdf10 Mar 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Sai Shrushti Vatika oc A , B.pdf10 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold_Vatika.pdf10 Mar 2025
Other - TechnicalFile: Sai Srushti Vatika_Part OC C.pdf10 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form_2A_Vatika.pdf10 Mar 2025
Disclosure for secured/unsecured finance availed for the projectFile: Sold Unsold_Vatika.pdf10 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - Vatika.pdf2 Feb 2023
Copy of the legal title reportFile: Title Certificate.pdf19 Feb 2022
Proforma of Allotment letterFile: Allotment Letter and Sale Agreement.pdf17 Feb 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Vatika CA Certificate.pdf13 Feb 2022
Building plan approvalFile: Vatica-Development Plan_compressed.pdf12 Feb 2022
Layout approvalFile: Vatica-Development Plan_compressed.pdf12 Feb 2022
PAN CardFile: Sai Shrushti PAN CARD.pdf12 Feb 2022
Details of encumbrancesFile: Letter of Encumbrances.pdf12 Feb 2022
Copy of Layout Approval (in case of layout)File: Vatica-Development Plan_compressed.pdf12 Feb 2022
Building Plan Approval / NA Order for plotted developmentFile: Vatica-Development Plan_compressed.pdf12 Feb 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Vatika 4817_compressed.pdf12 Feb 2022
Declaration about Commencement CertificateFile: Declaration for Commencement Certificate.pdf12 Feb 2022
Declaration in FORM BFile: Form-B-Promoter_compressed.pdf12 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_compressed.pdf12 Feb 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_compressed.pdf12 Feb 2022
CERSAI detailsFile: CERSAI_Search_Report.pdf12 Feb 2022

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise1 delivered late1 under way, not due yet
ProjectLocationFlatsStatusPromisedDelivered
SAI SHRUSHTI LEELAS. NO. 72, H. NO. 1 AND S. NO. 72, H. NO. 6, VILLAGE - PADALE, TAL - THANE, DIST-THANE, 421204149OngoingDec 2027Not due yet
SAI SHRUSHTI RESIDENCYDAWALE DIVA SHIL ROAD DIVA EAST THANE 40061248CompletedMay 2017Late, Jun 2017
SAI SHRUSHTI HEIGHTS- B3DIVA-SHILL ROAD54CompletedDec 2016Jun 2016
SAI SHRUSHTI HEIGHTS- B2DIVA-SHIL ROAD54CompletedDec 2016Aug 2015
SAI SHRUSHTI HEIGHTS- B1DAWALE DIVA-SHIL ROAD DIVA EAST THANE28CompletedDec 2015Jun 2015

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sai Shrushti Vatika Gajanan Alimkar on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dawale7,600+ in Thane

Builder: SAI SHRUSHTI ENTERPRISES

SAI SHRUSHTI ENTERPRISES has 14 registrations on MahaRERA, including SAI SHRUSHTI HEIGHTS-B4 and SAI SHRUSHTI ANNEX. Its filings disclose 5 earlier MahaRERA projects: declares 3 of 4 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that Sai Shrushti Vatika Gajanan Alimkar shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Sai Shrushti Vatika Gajanan Alimkar is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sai Shrushti Vatika Gajanan Alimkar?

The registered promoter entity is SAI SHRUSHTI ENTERPRISES, a partnership as per the filing. Its GSTIN 27ACKFS0306D1ZH can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sai Shrushti Vatika Gajanan Alimkar?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sai Shrushti Vatika Gajanan Alimkar?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sai Shrushti Vatika Gajanan Alimkar?

The professionals named in the filing: Architect: Joshi Deshaware & Associates; Engineer: Ajay Mahale Consulting Engineer; Chartered Accountant: Hemant Shetty & Co; Chartered Accountant: Shetty & Shetty. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sai Shrushti Vatika Gajanan Alimkar?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sai Shrushti Vatika Gajanan Alimkar. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sai Shrushti Vatika Gajanan Alimkar to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.