Home / Browse projects / Thane, Maharashtra / Trinity Paradise Phase 1

Registration lapsed No litigation declared Others project

Trinity Paradise Phase 1

By Trinity Builders

RG-MH-03001 · RERA P51700020667 · Last updated on MahaRERA portal: 11 Feb 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 7 months past the filed date
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2026Possession promised7 months past this date
23 of 44Construction stages doneacross 4 buildings; furthest along: Internal walls, 95%
294 of 461Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 213 documents Report an error

Trinity Paradise Phase 1 is a Others project by Trinity Builders in Thane, Maharashtra, registered with MahaRERA as P51700020667 on 3 May 2019. Possession was promised by 31 Mar 2026 and is now 7 months past that date. The completion date has moved by 12 months from the original filing. 167 of the 461 units on this registration are recorded sold or booked, and 23 of 44 construction stages are filed complete.

At a glance

Project

  • NameTrinity Paradise Phase 1
  • TypeOthers
  • Location
    • Kaiyan Road
    • Shill
    • Thane (M Corp.)
    • Thane
    • 400612
  • Pincode400612
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700020667
  • ReraGenie IDRG-MH-03001

Builder

  • NameTrinity Builders
  • Entity typePartnership
  • GSTIN27AAJFT7287K1ZC
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnerSIJO SUNNY MANNAMPONE
  • Other registrations2 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

7 months past promisethis monthRegisteredMay 2019First promiseMar 2025Revised toMar 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on3 May 2019
  • Promised completion31 Mar 2026
  • Revised completionRevised to 31 Mar 2026 (originally 30 Mar 2025)
  • Buildings4 building records
  • Documents filed213 files

Current status

36%167 of 461 units booked
96.2%Work done, per cost certificate

Figures as on 11 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A1NA191813325158
A2NA24201170117
A3NA24201170117
Mahada Building B1NA191869069

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 11 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

23 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 95%.

A182%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A270%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
A370%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Mahada Building B181%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 11 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes20%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsYes20%
Landscaping & Tree PlantingYes10%
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes40%
Solid Waste Management And DisposalYes20%
Water conservation /Rain water harvestingYes20%
Energy managemcntYes20%
Fire protection and fire safety requirementsYes20%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1185

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,185
Closed/Covered598
Open Space587
BuildingClosed/CoveredOpen SpaceTotal
A1199193392
A2199197396
A3199197396
Mahada Building B1101

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area20,460 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Pappadikoikal O Samuel Plus 17 othersGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI39335.14
Proposed, not sanctioned23,105 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDr Ambedkar Sangul Plot 62A Sector 29 Vashi Navi Mumbai
Estimated costRs 116.03 cr
Cost incurredRs 111.65 cr
Work done96.23%
BuildingWingEstimatedIncurred
A1NARs 35.47 crRs 35.47 cr
A2NARs 28.54 crRs 28.54 cr
A3NARs 24.26 crRs 23.05 cr
Mahada Building B1NARs 22.30 crRs 21.19 cr
-NARs 5.45 crRs 3.40 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSameer S Lotke and Associates Lotke
EngineerSSCONS
Chartered AccountantKarm and Co
Chartered AccountantDivyesh Sejpal
Chartered AccountantP B Jokhi
Chartered AccountantArun Borad
Chartered AccountantVaibhav Nagda
PartnerRole in project
Trinity Builders-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA07072501975Mar 2025 → Mar 2026

Reason as filed by the promoter1. We received the Commencement Certificate for the Project “Trinity Paradise Phase 1” from the Thane Municipal Corporation on January 2019 for the construction of the said building. Thereafter, we registered the said project with MAHA RERA and received the Registration Certificate from the MAHA RERA Authority on 3rd May, 2019. After receiving the Project Registration Certificate in May 2019, the COVID-19 pandemic began a year later. Due to the pandemic, labor shortages led to a complete halt in construction for one year. During this period, MAHA RERA issued an order granting a one-year extens

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Mar 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Mar 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 Apr 2025

Documents filed213

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 213 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Trinity Paradise upto 31-12-25.pdf11 Feb 2026
Withdrawal Update Form 2File: FORM 2 DEC 2025_compressed.pdf11 Feb 2026
Withdrawal Update Form 3File: Form 3 - Trinity Paradise 31-12-2025_compressed.pdf11 Feb 2026
Withdrawal Update Form 1File: FORM 1 Sept 2025 Trinity Phase 1.pdf27 Nov 2025
Withdrawal Update Form 1File: Form No 1 Trinity Paradise Phase 1 June 2025.pdf27 Nov 2025
Withdrawal Update Form 1File: Form 1 TP July to Sep 2025.pdf27 Nov 2025
Withdrawal Update Form 2File: Form 2 July to Sep 2025 TP (1).pdf27 Nov 2025
Withdrawal Update Form 2File: Form 2 July to Sep 2025 TP (1).pdf27 Nov 2025
Withdrawal Update Form 2File: Form 2 July to Sep 2025 TP (1).pdf27 Nov 2025
Withdrawal Update Form 3File: Form 3 July to Sep 2025.pdf27 Nov 2025
Withdrawal Update Form 3File: Form 3 - Trinity Paradise Phase 1.pdf27 Nov 2025
Withdrawal Update Form 3File: Form 3 July to Sep 2025 TP_compressed.pdf27 Nov 2025
Form 1File: Form 1 - Trinity Paradise (1).pdf13 May 2025
Form 2File: Form 1 - Trinity Paradise (1).pdf13 May 2025
Form 1File: Form 1 - Trinity Paradise (1).pdf13 May 2025
Form 2File: Form 1 - upto 31-03-2024 - Trinity Paradise.pdf13 May 2025
Form 3File: Form 2 Trinity Paradise March 2024 (1).pdf13 May 2025
Disclosure of Sold and Booked InventoryFile: Form 3 Trinity Pradise March 2024_compressed.pdf13 May 2025
Form 1File: Form 1 - Trinity Paradise (1).pdf13 May 2025
Form 2File: Form 1 - upto 31-03-2024 - Trinity Paradise.pdf13 May 2025
Form 3File: Form 2 Trinity Paradise March 2024 (1).pdf13 May 2025
Disclosure of Sold and Booked InventoryFile: Form 3 Trinity Pradise March 2024_compressed.pdf13 May 2025
Form 1File: Form 1 - upto 31-03-2024 - Trinity Paradise.pdf13 May 2025
Form 2File: Form 1 - Trinity Paradise (1).pdf13 May 2025
Form 3File: Form 2 Trinity Paradise March 2024 (1).pdf13 May 2025
Disclosure of Sold and Booked InventoryFile: Form 3 Trinity Pradise March 2024_compressed.pdf13 May 2025
Form 1File: Form 1 - Trinity Paradise (1).pdf13 May 2025
Form 2File: Form 1 Dec 2023.pdf13 May 2025
Form 3File: Form 2 Dec 2023.pdf13 May 2025
Disclosure of Sold and Booked InventoryFile: Form 3 Dec 2023.pdf13 May 2025
Form 1File: Form 1 Dec 2023.pdf13 May 2025
Form 2File: Form 2 Dec 2023.pdf13 May 2025
Form 3File: Form 1 - Trinity Paradise (1).pdf13 May 2025
Disclosure of Sold and Booked InventoryFile: Form 3 Dec 2023.pdf13 May 2025
Form 1File: Form 1 Dec 2023.pdf13 May 2025
Form 2File: Form 2 Dec 2023.pdf13 May 2025
Form 3File: Form 3 Dec 2023.pdf13 May 2025
Disclosure of Sold and Booked InventoryFile: Form 1 - Trinity Paradise (1).pdf13 May 2025
Form 1File: Form 1 Dec 2023.pdf13 May 2025
Form 2File: Form 3 Dec 2023.pdf13 May 2025
Form 3File: Form 2 Dec 2023.pdf13 May 2025
Disclosure of Sold and Booked InventoryFile: Form 1 - Trinity Paradise (1).pdf13 May 2025
Form 1File: Form 1 Dec 2023.pdf13 May 2025
Form 2File: Form 2 Dec 2023.pdf13 May 2025
Form 3File: Form 1 - Trinity Paradise (1).pdf13 May 2025
Disclosure of Sold and Booked InventoryFile: Form 3 Dec 2023.pdf13 May 2025
Form 1File: Form 1 Dec 2023.pdf13 May 2025
Form 2File: Form 2 Dec 2023.pdf13 May 2025
Form 3File: Form 3 Dec 2023.pdf13 May 2025
Disclosure of Sold and Booked InventoryFile: Form 1 - Trinity Paradise (1).pdf13 May 2025
Form 1File: Form 1 Dec 2023.pdf13 May 2025
Form 2File: Form 2 Dec 2023.pdf13 May 2025
Form 3File: Form 1 - Trinity Paradise (1).pdf13 May 2025
Disclosure of Sold and Booked InventoryFile: Form 3 Dec 2023.pdf13 May 2025
Form 1File: Form 1 Dec 2023.pdf13 May 2025
Form 2File: Form 2 Dec 2023.pdf13 May 2025
Form 3File: Form 3 Dec 2023.pdf13 May 2025
Disclosure of Sold and Booked InventoryFile: Form 1 - Trinity Paradise (1).pdf13 May 2025
Form 2A (FY 2020-2021)File: Form 5 20-21 (1).pdf13 May 2025
Form 2A (FY 2021-2022)File: Form 2A 21-22.pdf13 May 2025
Form 2A (FY 2019-2020)File: Form 2A 19-20.pdf13 May 2025
Form 2A (FY 2022-2023)File: Form 2A 22-23.pdf13 May 2025
Form 2A (FY 2023-2024)File: Form 2A 23-24.pdf13 May 2025
Form 5 (FY 2020-2021)File: Form 5 20-21.pdf13 May 2025
Form 5 (FY 2021-2022)File: Form 5 21-22.pdf13 May 2025
Form 5 (FY 2022-2023)File: Form 5 2022 - 2023.pdf13 May 2025
Form 5 (FY 2023-2024)File: Form 5 23 - 24.pdf13 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Trinity Paradise (2).pdf21 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Part.pdf21 Apr 2025
Other - TechnicalFile: OC A1 and B1.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Trinity Paradise.pdf19 Apr 2025
Certificates of CA (Form 3)File: Form 3 Trinity Paradise upto 31 March 2025_compressed.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Trinity Paradise upto 31 March 2025 (1).pdf11 Apr 2025
Certificates of CA (Form 3)File: Form 3 Dec 2024 Trinity Paradise.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 -Trinity Paradise Dec 2024.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Trinity Paradise Dec 2024.pdf10 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Trinity Dec 2024.pdf9 Jan 2025
Certificates of CA (Form 3)File: Form 3 Trinity Sept 2024.pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Trinity Pradise form 5 sept 2024.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Trinity Paradise July to Sep 24_compressed.pdf18 Oct 2024

How this compares with Thane

36%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Trinity Paradise Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shill7,600+ in Thane

2 kmTrinity Paradise Phase 1Completed 43Lapsed / revoked 19Other 53Dot size: filed unitsN

Filed coordinates, straight-line distance. 115 registered projects within 2 km.

Builder: Trinity Builders

Trinity Builders has 3 registrations on MahaRERA, including Trinity Paradise Phase 1 and Arham Aryan. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that Trinity Paradise Phase 1 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Trinity Paradise Phase 1 is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Trinity Paradise Phase 1?

The registered promoter entity is Trinity Builders, a partnership as per the filing. Its GSTIN 27AAJFT7287K1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Trinity Paradise Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Trinity Paradise Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Trinity Paradise Phase 1?

The professionals named in the filing: Architect: Sameer S Lotke and Associates Lotke; Engineer: SSCONS; Chartered Accountant: Karm and Co; Chartered Accountant: Divyesh Sejpal; Chartered Accountant: P B Jokhi; Chartered Accountant: Arun Borad. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Trinity Paradise Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Trinity Paradise Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Trinity Paradise Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.