ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / MUKTA GHARONDA

Registration lapsed No litigation declared Others project

MUKTA GHARONDA

By SKYLARK INFRASTRUCTURES

RG-MH-03007 · RERA P51700020333 · Last updated on MahaRERA portal: 22 Jun 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
96 of 176Construction stages doneacross 16 buildings; furthest along: Staircases, 95%
90 of 528Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 160 documents Report an error

MUKTA GHARONDA is a Others project by SKYLARK INFRASTRUCTURES in Thane, Maharashtra, registered with MahaRERA as P51700020333 on 5 Apr 2019. Possession was promised by 29 Dec 2025 and is now 10 months past that date. The completion date has moved by 12 months from the original filing. 438 of the 528 units on this registration are recorded sold or booked, and 96 of 176 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameMUKTA GHARONDA
  • TypeOthers
  • Location
    • Off Mumbra Bypass Road
    • Kausa
    • Chavindra
    • Thane
    • 400612
  • Pincode400612
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700020333
  • ReraGenie IDRG-MH-03007

Builder

  • NameSKYLARK INFRASTRUCTURES
  • Entity typePartnership
  • PartnersFarhan Mohd Muslim Shaikh, Hammad Ehtesham Khan, Sharique Altaf Ahmad Siddiqui, Altaf Ahmad Abdul Bari, Mohammed Humayun Zaheer Ahmed Shaikh, MOHAMMAD ADIL SIDDIQUE KHAN, AYESHA ALTAF SIDDIQUI, SADAF ALTAF AHMAD, QAMAR JAHA ALTAF BARI, JUNAID ASHRAF MULANI

Key dates

10 months past promisethis monthRegisteredApr 2019First promiseDec 2024Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on5 Apr 2019
  • Promised completion29 Dec 2025
  • Revised completionRevised to 29 Dec 2025 (originally 30 Dec 2024)
  • Buildings16 building records
  • Documents filed160 files

Current status

83%438 of 528 units booked
99.4%Work done, per cost certificate

Figures as on 22 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Emerald Wing - DNA8728028
Emerald Wing - ENA8742042
Emerald Wing - ANA8728028
Emerald Wing - BNA8728028
Emerald Wing - CNA8728028
Pearl Wing - ANA8830030
Pearl Wing - BNA8830030
Pearl Wing - CNA8830030
Pearl Wing - DNA8830030
Sapphire Wing - ANA8845045
Sapphire Wing - BNA8830030
Sapphire Wing - CNA8830030
Sapphire Wing - DNA8830030
Coral Wing - ANA8834034
Coral Wing - BNA8829534
Coral Wing - CNA8843851

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building16

As on 22 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

96 of 176 construction stages are filed complete across 16 buildings. The stage furthest along is Staircases, at 95%.

Emerald Wing - D90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Emerald Wing - E90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Emerald Wing - A90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Emerald Wing - B90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Emerald Wing - C90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Pearl Wing - A90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Pearl Wing - B90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Pearl Wing - C90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Pearl Wing - D90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Sapphire Wing - A90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Sapphire Wing - B90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Sapphire Wing - C90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Sapphire Wing - D90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.40%
Coral Wing - A86%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises89%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
Coral Wing - B86%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises89%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
Coral Wing - C86%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises89%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 22 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes40%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes85%
Storm Water DrainsYes75%
Landscaping & Tree PlantingYes70%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes60%
Solid Waste Management And DisposalYes70%
Water conservation /Rain water harvestingYes30%
Energy managemcntYes25%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceYes50%
Open ParkingYes0%

Parking filed173

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots173
Closed/Covered173
BuildingClosed/CoveredTotal
Emerald Wing - D1313
Emerald Wing - E1212
Emerald Wing - A1212
Emerald Wing - B1212
Emerald Wing - C1313
Pearl Wing - A1010
Pearl Wing - B1212
Pearl Wing - C1010
Pearl Wing - D1212
Sapphire Wing - A1414
Sapphire Wing - B1010
Sapphire Wing - C1010
Sapphire Wing - D1010
Coral Wing - A88
Coral Wing - B88
Coral Wing - C77

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area13,400 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI30000.0
Proposed, not sanctioned14,807 sq m
Buildings approved16
Buildings sanctioned16

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch4 , Ground Floor, Surme Plaza, Old Mumbai - Pune Road, Kausa, Mumbra 4000612
Estimated costRs 69.33 cr
Cost incurredRs 68.89 cr
Work done99.37%
BuildingWingEstimatedIncurred
Coral Wing - CNARs 6.62 crRs 6.42 cr
Emerald Wing - ENARs 6.20 crRs 6.20 cr
Pearl Wing - ANARs 4.94 crRs 4.94 cr
Pearl Wing - BNARs 4.94 crRs 4.94 cr
Pearl Wing - CNARs 4.94 crRs 4.94 cr
Pearl Wing - DNARs 4.94 crRs 4.94 cr
Sapphire Wing - ANARs 4.94 crRs 4.94 cr
Sapphire Wing - CNARs 4.38 crRs 4.38 cr
Sapphire Wing - DNARs 4.38 crRs 4.38 cr
Coral Wing - ANARs 4.04 crRs 4.04 cr
Coral Wing - BNARs 4.04 crRs 3.92 cr
Sapphire Wing - BNARs 3.80 crRs 3.80 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRight Angle
EngineerSSCONS
Chartered AccountantPranav Bhaskaran & Associates
PartnerRole in project
SKYLARK INFRASTRUCTURES-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700024517Dec 2024 → Dec 2025

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000397518Aisha naaz Javed Alam ShaikhM/S. SKYLARK INFRASTRUCTURES20/09/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Mar 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Feb 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 May 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed160

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 160 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Mukta Gharonda as on June 2025.pdf22 Jun 2026
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE.pdf22 Jun 2026
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE DEC 2025.pdf22 Jun 2026
Withdrawal Update Form 2File: Form 2 - Mukta Gharonda as on June 2025.pdf22 Jun 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE.pdf22 Jun 2026
Withdrawal Update Form 2File: ENGINEER CERTIFICATE.pdf22 Jun 2026
Withdrawal Update Form 3File: Form 3 of Mukta Gharonda as on 30-06-2025.pdf22 Jun 2026
Withdrawal Update Form 3File: Form 3 of Mukta Gharonda as on 30-09-2025.pdf22 Jun 2026
Withdrawal Update Form 3File: Form 3 of Mukta Gharonda as on 31-12-2025.pdf22 Jun 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Mukta Gharonda as on March 2025.pdf8 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Mukta Gharonda as on March 2025.pdf8 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 11 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf15 Feb 2025
Certificates of CA (Form 3)File: 23 Certificates of CA (Form 3).pdf15 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 21 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf15 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Mukta Gharonda as on Dec 2024.pdf8 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Mukta Gharonda for FY 2023-24.pdf8 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5-Mukta Gharonda as on 31st March 2024.pdf21 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5-Mukta Gharonda as on 31st March 2024.pdf21 Nov 2024
Certificates of CA (Form 3)File: Form 3 of Mukta Gharonda as on 30-09-2024.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Mukta Gharonda as on 30-09-2024.pdf20 Oct 2024
Declaration in FORM BFile: affidavit cum declaration_11zon.pdf1 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A 20-21.pdf31 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19-20.pdf31 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf31 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf31 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20.pdf30 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 21-22.pdf30 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23.pdf30 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf30 Jul 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD FLAT LIST.pdf30 Jul 2024
Declaration about Commencement CertificateFile: Format D.pdf29 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jun 24_11zon.pdf29 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jun 24.pdf29 Jul 2024
Certificates of CA (Form 3)File: Form 3 June 24_11zon.pdf29 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf29 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf29 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf29 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Mukta Gharonda as on June 2024.pdf19 Jul 2024
Certificates of CA (Form 3)File: Form 3 of Mukta Gharonda as on 30-06-2024.pdf19 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf8 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023-24.pdf8 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Mukta Gharonda as on March 2024.pdf16 May 2024
Certificates of CA (Form 3)File: Form 3 - Mukta Gharonda as on March 2024.pdf16 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Mukta Gharonda as on September 2023.pdf14 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Mukta Gharonda as on Dec 2023.pdf14 Mar 2024
Certificates of CA (Form 3)File: Form 3 Sep 23 - Mukta Gharonda.pdf14 Mar 2024
Certificates of CA (Form 3)File: Form 3 Dec 23 -Mukta Gharonda.pdf14 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Mukta Gharonda as on Dec 2023.pdf10 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Mukta Gharonda.pdf10 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5-Mukta Gharonda FY 2022-23.pdf4 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 as on 29 Sept 2023.pdf5 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Mukta Gharonda_compressed.pdf11 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Mukta Gharonda as on June 2023.pdf15 Jul 2023
Certificates of CA (Form 3)File: Form 3- Mukta Gharonda as on June 2023.pdf15 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Apr 2023
Certificates of CA (Form 3)File: Form 3.pdf20 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Certificate.pdf15 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Mukta Gharonda as on December 2022.pdf30 Jan 2023
Certificates of CA (Form 3)File: Form 3- Mukta Gharonda as on December 2022.pdf30 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Mukta Gharonda_compressed.pdf17 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Mukta gharonda FORM 1_compressed.pdf15 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mukta Gharonda Form 2- September 2022.pdf11 Nov 2022
Certificates of CA (Form 3)File: Form 3- Mukta Gharonda as on September 2022.pdf11 Nov 2022
Certificates of CA (Form 3)File: Form 3 as on June 2022.pdf12 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Mukta Gharonda Form 5 FY 2021-22.pdf30 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mukta Gharonda Form 2- 30 June 2022.pdf26 Aug 2022
Certificates of CA (Form 3)File: Form 3 Mukta Gharonda June 22.pdf26 Aug 2022
Certificates of CA (Form 3)File: Form 3 Mukta Gharonda March 2022.pdf23 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mukta Gharonda Form 2- 31st March 2022.pdf11 May 2022
Building plan approvalFile: 1_rotated_compressed (3).pdf6 May 2022
Building plan approvalFile: 2_rotated_compressed (2).pdf6 May 2022
Building plan approvalFile: 3_rotated_compressed (1).pdf6 May 2022
Building plan approvalFile: 4_rotated_compressed.pdf6 May 2022
Building plan approvalFile: 5_rotated_compressed.pdf6 May 2022
Building plan approvalFile: 6_rotated_compressed.pdf6 May 2022
Building plan approvalFile: 7_rotated_compressed.pdf6 May 2022
Building plan approvalFile: 8_rotated.pdf6 May 2022
Building plan approvalFile: 9_rotated_compressed.pdf6 May 2022
Building plan approvalFile: 10_rotated.pdf6 May 2022
Building plan approvalFile: 11_rotated_compressed.pdf6 May 2022

How this compares with Thane

83%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 12 months
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep MUKTA GHARONDA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kausa7,600+ in Thane

2 kmMUKTA GHARONDACompleted 15Lapsed / revoked 12Other 37Dot size: filed unitsN

Filed coordinates, straight-line distance. 64 registered projects within 2 km.

Builder: SKYLARK INFRASTRUCTURES

SKYLARK INFRASTRUCTURES has 1 registration on MahaRERA, including MUKTA GHARONDA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that MUKTA GHARONDA shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if MUKTA GHARONDA is delayed beyond 29 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of MUKTA GHARONDA?

The registered promoter entity is SKYLARK INFRASTRUCTURES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in MUKTA GHARONDA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against MUKTA GHARONDA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for MUKTA GHARONDA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at MUKTA GHARONDA?

The professionals named in the filing: Architect: Right Angle; Engineer: SSCONS; Chartered Accountant: Pranav Bhaskaran & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in MUKTA GHARONDA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About MUKTA GHARONDA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save MUKTA GHARONDA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.