Home / Browse projects / Mumbai Suburban, Maharashtra / SAI SASTHA SAMRAT

Completed No litigation declared Residential / Group Housing project

SAI SASTHA SAMRAT

By MS SAI SASTHA ENTERPRISES

RG-MH-87392 · RERA P51800033301 · Last updated on MahaRERA portal: 21 Feb 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
119 of 201Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 96 documents Report an error

SAI SASTHA SAMRAT is a Residential / Group Housing project by MS SAI SASTHA ENTERPRISES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800033301 on 15 Feb 2022. The registration is recorded completed; possession was promised by 31 Dec 2025. 82 of the 201 units on this registration are recorded sold or booked, and 22 of 22 construction stages are filed complete.

At a glance

Project

  • NameSAI SASTHA SAMRAT
  • TypeResidential / Group Housing
  • Location
    • TEMBIPADA ROAD
    • SHIVAJI CHOWK
    • Kurla
    • Mumbai Suburban
    • 400078
  • Pincode400078
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800033301
  • ReraGenie IDRG-MH-87392

Builder

  • NameMS SAI SASTHA ENTERPRISES
  • Entity typeOthers
  • Named personRAMESHNAN K MUTHATHYAN
  • ProprietorRAMESHAN K MUTHATHYAN
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects3 →

Key dates

this monthRegisteredFeb 2022PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Feb 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed96 files

Current status

41%82 of 201 units booked
86.9%Work done, per cost certificate

Figures as on 21 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAI SASTHA SAMRAT SALE WING BNA23231230123
SUDARSHAN SRA CHS REHAB WING ANA202074478

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 21 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

SAI SASTHA SAMRAT SALE WING B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
SUDARSHAN SRA CHS REHAB WING A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 21 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed49

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots49
Closed/Covered12
Open Space37
BuildingClosed/CoveredOpen SpaceTotal
SAI SASTHA SAMRAT SALE WING B03737
SUDARSHAN SRA CHS REHAB WING A12012

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,166 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Aug 2025
LandownerVillageDistrict
RAMESHAN MUTHATHYANKurlaMumbai Suburban

Approvals and building plan

Sanctioning authoritySLUM REHABILITAION AUTHORITY, MUMBAI
Permissible FSI6142.77
Proposed, not sanctioned6,143 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSMEET APARTMENT,UPASHRAYA LANE,GHATKOPAR EAST,MUMBAI-400077
Estimated costRs 33.62 cr
Cost incurredRs 29.23 cr
Work done86.93%
BuildingWingEstimatedIncurred
SAI SASTHA SAMRAT SALE WING BNARs 22.36 crRs 21.16 cr
SUDARSHAN SRA CHS REHAB WING ANARs 6.29 crRs 5.95 cr
-NARs 4.97 crRs 2.11 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectROHIT PATIL OF MS ARCHITECTURAL CONCEPT PATIL
EngineerSVP ASSOCIATES
EngineerSANJAY UDANI
Chartered AccountantM/s. S J Bajaria & Co. Chartered Accountants
Chartered AccountantMayank Ashok Nagaria
PartnerRole in project
MS SAI SASTHA ENTERPRISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Feb 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed96

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ONLINE FORM 1 01102025 TO 31122025.pdf21 Feb 2026
Withdrawal Update Form 2File: ONLINE Form2 01102025 TO 31122025.pdf21 Feb 2026
Withdrawal Update Form 3File: 2025-26 - Q3 - Form-3.pdf21 Feb 2026
Occupational CertificateFile: REHAB AND SALE OC CFT.pdf21 Feb 2026
Withdrawal Update Form 1File: ONLINE FORM 1 01072025 TO 30092025.pdf19 Feb 2026
Withdrawal Update Form 2File: ONLINE Form2 01072025 TO 30092025.pdf19 Feb 2026
Withdrawal Update Form 3File: 2025-26 - Q2 - Form-3.pdf19 Feb 2026
Withdrawal Update Form 1File: ONLINE FORM 1 01042025 TO 30062025.pdf14 Feb 2026
Withdrawal Update Form 1File: ONLINE FORM 1 01042025 TO 30062025.pdf14 Feb 2026
Withdrawal Update Form 2File: ONLINE Form2 01042025 TO 30062025.pdf14 Feb 2026
Withdrawal Update Form 2File: ONLINE Form2 01042025 TO 30062025.pdf14 Feb 2026
Withdrawal Update Form 3File: 2025-26 - Q1 - Form-3.pdf14 Feb 2026
Withdrawal Update Form 3File: 2025-26 - Q1 - Form-3.pdf14 Feb 2026
Form 1File: 15022022 TO 31032022 FORM 1.pdf8 Feb 2026
Form 2File: 15022022 TO 31032022 FORM 2.pdf8 Feb 2026
Form 3File: 15022022 TO 31032022 FORM 3.pdf8 Feb 2026
Disclosure of Sold and Booked InventoryFile: 1 - DISCLOSURE OF SOLD UPTO 31032022.pdf8 Feb 2026
Form 1File: 01042022 TO 30062022 FORM 1.pdf8 Feb 2026
Form 2File: 01042022 TO 30062022 FORM 2.pdf8 Feb 2026
Form 3File: 01042022 TO 30062022 FORM 3.pdf8 Feb 2026
Disclosure of Sold and Booked InventoryFile: 2- DISCLOSURE OF SOLD UPTO 30062022.pdf8 Feb 2026
Form 1File: 01072022 TO 30092022 FORM 1.pdf8 Feb 2026
Form 2File: 01072022 TO 30092022 FORM 2.pdf8 Feb 2026
Form 3File: 01072022 TO 30092022 FORM 3.pdf8 Feb 2026
Disclosure of Sold and Booked InventoryFile: 3 - DISCLOSURE OF SOLD UPTO 30092022.pdf8 Feb 2026
Form 1File: 01102022 TO 31122022 FORM 1.pdf8 Feb 2026
Form 2File: 01102022 TO 31122022 FORM 2.pdf8 Feb 2026
Form 3File: 01102022 TO 31122022 FORM 3.pdf8 Feb 2026
Disclosure of Sold and Booked InventoryFile: 4 - DISCLOSURE OF SOLD UPTO 31122022.pdf8 Feb 2026
Form 1File: 01012023 TO 31032023 FORM 1.pdf8 Feb 2026
Form 2File: 01012023 TO 31032023 FORM 2.pdf8 Feb 2026
Form 3File: 01012023 TO 31032023 FORM 3.pdf8 Feb 2026
Disclosure of Sold and Booked InventoryFile: 5 - DISCLOSURE OF SOLD UPTO 31032023.pdf8 Feb 2026
Form 1File: 01042023 TO 30062023 FORM 1.pdf8 Feb 2026
Form 2File: 01042023 TO 30062023 FORM 2.pdf8 Feb 2026
Form 3File: 01042023 TO 30062023 FORM 3.pdf8 Feb 2026
Disclosure of Sold and Booked InventoryFile: 6 - DISCLOSURE OF SOLD UPTO 30062023.pdf8 Feb 2026
Form 1File: 01072023 TO 30092023 FORM 1.pdf8 Feb 2026
Form 2File: 01072023 TO 30092023 FORM 2.pdf8 Feb 2026
Form 3File: 01072023 TO 30092023 FORM 3.pdf8 Feb 2026
Disclosure of Sold and Booked InventoryFile: 7 - DISCLOSURE OF SOLD UPTO 30092023.pdf8 Feb 2026
Form 1File: 01102023 TO 31122023 FORM 1.pdf8 Feb 2026
Form 2File: 01102023 TO 31122023 FORM 2.pdf8 Feb 2026
Form 3File: 01102023 TO 31122023 FORM 3.pdf8 Feb 2026
Disclosure of Sold and Booked InventoryFile: 8 - DISCLOSURE OF SOLD UPTO 31122023.pdf8 Feb 2026
Form 1File: 01012024 TO 31032024 FORM 1.pdf8 Feb 2026
Form 2File: 01012024 TO 31032024 FORM 2.pdf8 Feb 2026
Form 3File: 01012024 TO 31032024 FORM 3.pdf8 Feb 2026
Disclosure of Sold and Booked InventoryFile: 9 - DISCLOSURE OF SOLD UPTO 31032024.pdf8 Feb 2026
Form 1File: 01042024 TO 30062024 FORM 1.pdf8 Feb 2026
Form 2File: 01042024 TO 30062024 FORM 2.pdf8 Feb 2026
Form 3File: 01042024 TO 30062024 FORM 3.pdf8 Feb 2026
Disclosure of Sold and Booked InventoryFile: 10 - DISCLOSURE OF SOLD UPTO 30062024.pdf8 Feb 2026
Form 1File: 01072024 TO 30092024 FORM 1.pdf8 Feb 2026
Form 2File: 01072024 TO 30092024 FORM 2.pdf8 Feb 2026
Form 3File: 01072024 TO 30092024 FORM 3.pdf8 Feb 2026
Disclosure of Sold and Booked InventoryFile: 11 - DISCLOSURE OF SOLD UPTO 30092024.pdf8 Feb 2026
Form 1File: 01102024 TO 31122024 FORM 1.pdf8 Feb 2026
Form 2File: 01102024 TO 31122024 FORM 2.pdf8 Feb 2026
Form 3File: 01102024 TO 31122024 FORM 3.pdf8 Feb 2026
Disclosure of Sold and Booked InventoryFile: 12 - DISCLOSURE OF SOLD UPTO 31122024.pdf8 Feb 2026
Form 1File: 01012025 TO 31032025 FORM 1.pdf8 Feb 2026
Form 2File: 01012025 TO 31032025 FORM 2.pdf8 Feb 2026
Form 3File: 01012025 TO 31032025 FORM 3.pdf8 Feb 2026
Disclosure of Sold and Booked InventoryFile: 13 - DISCLOSURE OF SOLD UPTO 31032025.pdf8 Feb 2026
Form 2A (FY 2021-2022)File: Form 2A 05-04-2022.pdf10 Dec 2025
Form 2A (FY 2022-2023)File: from 2A 10-04-2023.pdf10 Dec 2025
Form 2A (FY 2023-2024)File: 08-04-2024 From 2A.pdf10 Dec 2025
Form 2A (FY 2024-2025)File: From 2A11-04-2025.pdf10 Dec 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Site Supervisor Certificate.pdf27 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Annual Report CA Form 5.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT’S CERTIFICATE.pdf14 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 Chartered Accountants Cretificate_compressed.pdf14 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sanjay Udani Associates.pdf14 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22 23.pdf14 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Annual Report Form 5.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificat (1).pdf14 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Form 2_compressed.pdf14 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA_compressed.pdf14 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: From 5 Annual Report CA.pdf14 Feb 2023

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late1 not delivered by the promised date
ProjectLocationFlatsRegisteredStatusPromisedDelivered
SAI SASTHA CRYSTALP51800002006Kurla, Mumbai Suburban-Jul 2017Certificate SignedDec 2021Not delivered
SAI SASTHA HILL CRESTTEMBHIPADA BHANDUP38-CompletedMar 2015Late, Jun 2015
SAI SASTHA HEIGHTSJAMIL NAGAR BHANDUP32-CompletedOct 2011Late, Dec 2011

How this compares with Mumbai Suburban

41%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI SASTHA SAMRAT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHIVAJI CHOWK6,700+ in Mumbai Suburban

2 kmSAI SASTHA SAMRATCompleted 42Lapsed / revoked 25Other 65Dot size: filed unitsN

Filed coordinates, straight-line distance. 132 registered projects within 2 km.

Builder: MS SAI SASTHA ENTERPRISES

MS SAI SASTHA ENTERPRISES has 2 registrations on MahaRERA, including SAI SASTHA CRYSTAL and SAI SASTHA SAMRAT. Its filings disclose 3 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SAI SASTHA SAMRAT is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI SASTHA SAMRAT?

The registered promoter entity is MS SAI SASTHA ENTERPRISES, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI SASTHA SAMRAT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI SASTHA SAMRAT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI SASTHA SAMRAT?

The professionals named in the filing: Architect: ROHIT PATIL OF MS ARCHITECTURAL CONCEPT PATIL; Engineer: SVP ASSOCIATES; Engineer: SANJAY UDANI; Chartered Accountant: M/s. S J Bajaria & Co. Chartered Accountants; Chartered Accountant: Mayank Ashok Nagaria. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI SASTHA SAMRAT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI SASTHA SAMRAT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI SASTHA SAMRAT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.