ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / SAI SAGAR RESIDENCY

Registered No litigation declared Residential / Group Housing project

SAI SAGAR RESIDENCY

By OM SAI CONSTRUCTION

RG-MH-06134 · RERA P51700052074 · Last updated on MahaRERA portal: 29 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 14 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedno revision filed
8 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 98%
9 of 37Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

SAI SAGAR RESIDENCY is a Residential / Group Housing project by OM SAI CONSTRUCTION in Thane, Maharashtra, registered with MahaRERA as P51700052074 on 19 Jul 2023. Possession is promised by 30 Jun 2027. 28 of the 37 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.

At a glance

Project

  • NameSAI SAGAR RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • CHINCHPADA
    • KALYAN EAST
    • Kalyan
    • Thane
    • 421306
  • Pincode421306
  • RERA no.P51700052074
  • ReraGenie IDRG-MH-06134

Builder

  • NameOM SAI CONSTRUCTION
  • Entity typePartnership
  • PartnerKALPANA VISHWANATH GOSAVI
  • Other registrations14 more →
  • Completed3 of 15
  • No longer live4 lapsed, de-registered or revoked
  • Declared earlier projects13 →

Key dates

this monthRegisteredJul 2023PromisedJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Jul 2023
  • Promised completion30 Jun 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed68 files

Current status

76%28 of 37 units booked
94.1%Work done, per cost certificate

Figures as on 29 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA8835035
B WINGNA22202

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 98%.

A WING81%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises98%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%
B WING81%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises98%
Sanitary Fittings within the flats / premises98%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.98%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.98%

Progress on shared amenities15

As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed46

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots46
Open Space46

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area810 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Mar 2026
LandownerVillageDistrict
CHINTAMNI BALU MHATREKATEMANEVALIThane
NAGUBAI PANDIT MHATREKATEMANEVALIThane
GURUNATH CHINTAMANI MHATREKATEMANEVALIThane
KAILASH PANDIT MHATREKATEMANEVALIThane
NANDA PANDIT MAHTREKATEMANEVALIThane

Approvals and building plan

Sanctioning authorityADTP, KALYAN DOMBIVALI MUNICIPAL CORPORATION, KALYAN
Permissible FSI2288.5
Proposed, not sanctioned1,686 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR BALAJI APARTMENT TISGAON KALYAN EAST
Estimated costRs 5.83 cr
Cost incurredRs 5.49 cr
Work done94.1%
BuildingWingEstimatedIncurred
A WINGNARs 4.93 crRs 4.68 cr
B WINGNARs 85.00 lakhRs 80.75 lakh
-NARs 5.50 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDE CON CONSULTANTS
EngineerAARNA STRUCTURAL CONSULTANTS
Chartered AccountantMAYUR K JAIN & CO
Chartered AccountantANKIT PARAS JAIN & CO
PartnerRole in project
OM SAI CONSTRUCTION-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: form 5 signed_compressed.pdf29 Jun 2026
Withdrawal Update Form 1File: FORM 1.pdf30 May 2026
Withdrawal Update Form 2File: FORM 2.pdf30 May 2026
Withdrawal Update Form 3File: FORM 3 SIGNED FINAL 31-3-26_compressed.pdf30 May 2026
Form 1File: Form 1 Q2comp.pdf21 Feb 2026
Form 2File: Form-2 Q2.pdf21 Feb 2026
Form 3File: Signed Form 3 Sai Sagar Q2.pdf21 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Q2.pdf21 Feb 2026
Form 1File: Form 1 Q3-compressed.pdf21 Feb 2026
Form 2File: Form 2 Q3-compressed.pdf21 Feb 2026
Form 3File: Signed Form 3 Sai Sagar Q3.pdf21 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sod Unsold Q3.pdf21 Feb 2026
Form 5 (FY 2024-2025)File: Form-5 Signed.pdf6 Oct 2025
Form 1File: Form 1 Signed.pdf22 Aug 2025
Form 2File: Form 2.pdf22 Aug 2025
Form 3File: Form 3.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold List.pdf22 Aug 2025
Form 1File: Form 1.pdf22 Aug 2025
Form 2File: Form 2.pdf22 Aug 2025
Form 3File: Form 3 Signed.pdf22 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory.pdf22 Aug 2025
Disclosure of sold/ booked inventoryFile: 31-03-2024.pdf10 Mar 2025
Disclosure of sold/ booked inventoryFile: 30-06-2024.pdf10 Mar 2025
Disclosure of sold/ booked inventoryFile: 30-09-2024.pdf10 Mar 2025
Disclosure of sold/ booked inventoryFile: 31-12-2024.pdf10 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 31-12-2024 Sign.pdf15 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 31-12-2024.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 31-12-2024.pdf13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 30-06-2024 Sign.pdf3 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 30-09-2024 Sign.pdf3 Jan 2025
Layout approvalFile: scan0006 (1)_compressed.pdf11 Dec 2024
Copy of Layout Approval (in case of layout)File: scan0006 (1)_compressed.pdf11 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SAI SAGAR FORM 1A 30 JUNE.pdf11 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Form 1.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SAI SAGAR FORM-2 30 JUNE.pdf11 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Form 2.pdf11 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: SAI SAGAR REVISE CC_compressed.pdf11 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 FY 2023-24 Sign.pdf2 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 31-03-2024 Sign.pdf7 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 31-03-2024.pdf12 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-03-2024_compressed.pdf19 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Om Sai Construction_0001_compressed.pdf20 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec23.pdf20 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 23_compressed.pdf20 Feb 2024
Declaration about Commencement CertificateFile: Format D 21st June.pdf21 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form-1.pdf21 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf21 Jun 2023
CERSAI detailsFile: CERSAI_Search_Report_200272185903_For_Asset_Based_Search_21_06_2023_20_21_16_302.pdf21 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Revised_compressed.pdf21 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: annexure .pdf21 Jun 2023
Proforma of Agreement for saleFile: RERA AGREEMENT Gosavi.pdf21 Jun 2023
PAN CardFile: PAN CARD OF SAI SAGAR.pdf19 Jun 2023
Layout approvalFile: plan_compressed.pdf15 Jun 2023
Building plan approvalFile: plan_compressed.pdf15 Jun 2023
Copy of the legal title reportFile: ilovepdf_merged (1).pdf15 Jun 2023
Details of encumbrances concerned to FinanceFile: Legal Encumbrances.pdf15 Jun 2023
Details of encumbrances concerned to FinanceFile: IMG_0002.pdf15 Jun 2023
Details of encumbrances concerned to LegalFile: Legal Encumbrances.pdf15 Jun 2023
Details of encumbrances concerned to LegalFile: IMG_0002.pdf15 Jun 2023
Copy of Layout Approval (in case of layout)File: plan_compressed.pdf15 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: plan_compressed.pdf15 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf15 Jun 2023
Declaration in FORM BFile: FORM B DEVELOPERS (1).pdf15 Jun 2023
CERSAI detailsFile: No Cersai declaration.pdf15 Jun 2023
Proforma of Allotment letterFile: Allotment Letter.pdf15 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format - A.pdf15 Jun 2023
Deviation Report with respect to Allotment letterFile: No Deviation Allotment Letter.pdf15 Jun 2023
Deviation Report with respect to model copy of AgreementFile: No Deviation Agreement For Sale.pdf15 Jun 2023

How this compares with Thane

76%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI SAGAR RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KALYAN EAST7,600+ in Thane

Builder: OM SAI CONSTRUCTION

OM SAI CONSTRUCTION has 15 registrations on MahaRERA, including SAI SAMRUDDHI and SAI SUMIRAN APARTMENT. Its filings disclose 13 earlier MahaRERA projects: declares 10 of 13 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SAI SAGAR RESIDENCY is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI SAGAR RESIDENCY?

The registered promoter entity is OM SAI CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI SAGAR RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI SAGAR RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI SAGAR RESIDENCY?

The professionals named in the filing: Architect: DE CON CONSULTANTS; Engineer: AARNA STRUCTURAL CONSULTANTS; Chartered Accountant: MAYUR K JAIN & CO; Chartered Accountant: ANKIT PARAS JAIN & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI SAGAR RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI SAGAR RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI SAGAR RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.