SAI PRATIK NAGARI

By PRATIK DREAM HOME

RG-MH-08592 · RERA P51500020695 · Last updated on MahaRERA portal: 30 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 54 months
  • 4 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Sep 2027Possession promisedmoved 54 months from the original
45 of 66Construction stages doneacross 6 buildings; furthest along: Internal walls, 90%
43 of 80Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 117 documents Report an error

SAI PRATIK NAGARI is a Residential / Group Housing project by PRATIK DREAM HOME in Aurangabad, Maharashtra, registered with MahaRERA as P51500020695 on 3 May 2019. Possession is promised by 30 Sep 2027. The completion date has moved by 54 months from the original filing. 37 of the 80 units on this registration are recorded sold or booked, and 45 of 66 construction stages are filed complete.

At a glance

Project

  • NameSAI PRATIK NAGARI
  • TypeResidential / Group Housing
  • Location
    • KHADI ROAD
    • DEOLAI
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431005
  • Pincode431005
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500020695
  • ReraGenie IDRG-MH-08592

Builder

  • NamePRATIK DREAM HOME
  • Entity typePartnership
  • PartnersHARIBHAU RUNJAJI HIWALE, ASHWINI RAM JOGDAND, SANGITA HARIBHAU HIWALE

Key dates

this monthRegisteredMay 2019First promiseMar 2023Revised toSep 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 May 2019
  • Promised completion30 Sep 2027
  • Revised completionRevised to 30 Sep 2027 (originally 30 Mar 2023)
  • Buildings6 building records
  • Documents filed117 files

Current status

46%37 of 80 units booked
59.2%Work done, per cost certificate

Figures as on 30 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING BNA3320020
BUILDING CNA5416016
BUILDING DNA3320020
BUILDING ENA22808
BUILDING FNA54808
BUILDING ANA22808

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building6

As on 30 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

45 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is Internal walls, at 90%.

BUILDING B75%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
BUILDING C75%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.80%
BUILDING D82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING E82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING F81%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
BUILDING A82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 30 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed80

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots80
Closed/Covered80
BuildingClosed/CoveredTotal
BUILDING B2020
BUILDING C1616
BUILDING D2020
BUILDING E88
BUILDING F88
BUILDING A88

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
Mr. IMRAN KHAN NAIM KHANAurangabad (M Corp.)Aurangabad
Mr. IDRIS KHAN NAIM KHANAurangabad (M Corp.)Aurangabad
IMRAN KHAN NAIM KHANAurangabad (M Corp.)Aurangabad
IDRIS KHAN NAIM KHANAurangabad (M Corp.)Aurangabad

Approvals and building plan

Sanctioning authorityAurangabad Municipal Corporation
Permissible FSI4788.0
Proposed, not sanctioned4,788 sq m
Buildings approved6
Buildings sanctioned6

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNEW ROKDIYA HANUMAN COLONY JALNA ROAD AURANGABAD
Estimated costRs 10.36 cr
Cost incurredRs 6.13 cr
Work done59.21%
BuildingWingEstimatedIncurred
-NARs 3.36 crRs 1.50 cr
BUILDING BNARs 1.79 crRs 1.18 cr
BUILDING DNARs 1.79 crRs 1.18 cr
BUILDING ENARs 98.51 lakhRs 65.17 lakh
BUILDING ANARs 98.51 lakhRs 65.17 lakh
BUILDING CNARs 74.69 lakhRs 49.41 lakh
BUILDING FNARs 70.95 lakhRs 46.94 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR DHANANJAY B DOIFODE
ArchitectASHOK BALANDE
EngineerER ABHAY S PATIL
Chartered AccountantCA VAIBHAV VIJAY DANDE
Chartered AccountantCA GIRISH PADMAKAR AWALGAONKAR
Chartered AccountantSNGP & COMPANY
PartnerRole in project
PRATIK DREAM HOME-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51500022967Mar 2023 → Mar 2026

Reason as filed by the promoterCompletion Certificate not yet received and some units are under construction.

EXT51500015445Mar 2023 → Mar 2024

Reason as filed by the promoter27 Units out of 80 Units are under construction. Customers prefer to purchase completed units instead of under construction units. After November 2022 sales inquiries are at lower side and hence there is delay in completing the project.

EA01062621181Mar 2023 → May 2027

Reason as filed by the promoter85% Work has been completed. Extension required to Complete balance project and Completion related Formalities. Customers prefer to purchase completed units instead of under construction units. After November 2022 sales inquiries are at lower side and hence there is delay in completing the project.

P51500020695/WarMar 2023 → Sep 2027

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Apr 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Apr 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Apr 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Apr 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2027

Documents filed117

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 117 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 2025-26 Q1.pdf30 May 2026
Withdrawal Update Form 1File: Form 1 2025-26 Q2.pdf30 May 2026
Withdrawal Update Form 1File: Form 1 2025-26 Q2.pdf30 May 2026
Withdrawal Update Form 1File: Form 1 2025-26 Q4.pdf30 May 2026
Withdrawal Update Form 1File: Form 1 2025-26 Q4.pdf30 May 2026
Withdrawal Update Form 2File: Form 2 2025-26 Q1.pdf30 May 2026
Withdrawal Update Form 2File: Form 2 2025-26 Q1.pdf30 May 2026
Withdrawal Update Form 2File: Form 2 2025-26 Q1.pdf30 May 2026
Withdrawal Update Form 2File: Form 2 2025-26 Q4.pdf30 May 2026
Withdrawal Update Form 2File: Form 2 2025-26 Q4.pdf30 May 2026
Withdrawal Update Form 3File: Form 3 2025-26 Q1.pdf30 May 2026
Withdrawal Update Form 3File: Form 3 2025-26 Q2.pdf30 May 2026
Withdrawal Update Form 3File: Form 3 2025-26 Q3.pdf30 May 2026
Withdrawal Update Form 3File: Form 3 2025-26 Q4.pdf30 May 2026
Withdrawal Update Form 3File: Form 3 2025-26 Q4.pdf30 May 2026
Certificates of CA (Form 3)File: Form 3 22-23 Q1.pdf29 Jul 2024
Certificates of CA (Form 3)File: Form 3 22-23 Q2.pdf29 Jul 2024
Certificates of CA (Form 3)File: Form 3 22-23 Q3.pdf29 Jul 2024
Certificates of CA (Form 3)File: Form 3 22-23 Q4.pdf29 Jul 2024
Certificates of CA (Form 3)File: Form 3 23-24 Q2.pdf29 Jul 2024
Certificates of CA (Form 3)File: Form 3 2022-23 Q1.pdf26 Jul 2024
Certificates of CA (Form 3)File: Form 3 2022-23 Q2.pdf26 Jul 2024
Certificates of CA (Form 3)File: Form 3 2022-23 Q3.pdf26 Jul 2024
Certificates of CA (Form 3)File: Form 3 2022-23 Q4.pdf26 Jul 2024
Certificates of CA (Form 3)File: Form 3 2023-24 Q2.pdf26 Jul 2024
Certificates of CA (Form 3)File: Form 3 2023-24 Q4.pdf26 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-23.pdf26 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023-24.pdf26 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 2022-23 Q1.pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 2022-23 Q2.pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 2022-23 Q3.pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 2022-23 Q4.pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 2023-24 Q1.pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 2023-24 Q2.pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 2023-24 Q3.pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 2023-24 Q4.pdf24 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Cert 19-20.pdf22 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Cert 20-21.pdf22 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Cert 21-22.pdf22 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Cert 22-23 Q1.pdf22 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Cert 22-23 Q2.pdf22 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Cert 22-23 Q3.pdf22 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Cert 22-23 Q4.pdf22 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Cert 23-24 Q1.pdf22 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Cert 23-24 Q2.pdf22 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Cert 23-24 Q3.pdf22 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Cert 23-24 Q4.pdf22 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 2020 Q4_.pdf10 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 2021 Q4_.pdf10 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 2022 Q4_.pdf10 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 2022 Q1_.pdf10 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 2022 Q2_.pdf10 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 2022 Q3_.pdf10 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 2023 Q4_.pdf10 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 2023 Q1_.pdf10 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: From 2 2023 Q2_.pdf10 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 2023 Q3_.pdf10 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 2024 Q4_.pdf10 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2024 Q4_.pdf10 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 2022 Q1.pdf9 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 2022 Q2.pdf9 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 2022 Q3.pdf9 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 2023 Q1.pdf9 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 2023 Q2.pdf9 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 2023 Q3.pdf9 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 2023 Q4.pdf9 Jul 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 2024 Q4.pdf9 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf10 Jun 2024
Details of encumbrances concerned to FinanceFile: 1 Merged Encumbarences.pdf30 Mar 2024
Details of encumbrances concerned to LegalFile: 1 Merged Encumbarences.pdf30 Mar 2024
Declaration in FORM BFile: FORM B Developer New Revised.pdf30 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect.pdf30 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Cert.pdf30 Mar 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf30 Mar 2024
Certificates of CA (Form 3)File: Form 3.pdf30 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 5 Disclosure of interest.pdf30 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 9 Seprate Bank Account Declaration.pdf30 Mar 2024
Deviation Report with respect to Allotment letterFile: 3 Deviation Report with respect to Allotment letter ok.pdf30 Mar 2024
Deviation Report with respect to model copy of AgreementFile: 4 Deviation Report with respect to model copy of Agreement ok.pdf30 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf23 Aug 2023

How this compares with Aurangabad

46%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one moved by 54 months
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep SAI PRATIK NAGARI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DEOLAI1,400+ in Aurangabad

2 kmSAI PRATIK NAGARICompleted 43Lapsed / revoked 31Other 32Dot size: filed unitsN

Filed coordinates, straight-line distance. 106 registered projects within 2 km.

Builder: PRATIK DREAM HOME

PRATIK DREAM HOME has 1 registration on MahaRERA, including SAI PRATIK NAGARI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if SAI PRATIK NAGARI is delayed beyond 30 Sep 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI PRATIK NAGARI?

The registered promoter entity is PRATIK DREAM HOME, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI PRATIK NAGARI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI PRATIK NAGARI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI PRATIK NAGARI?

The professionals named in the filing: Architect: AR DHANANJAY B DOIFODE; Architect: ASHOK BALANDE; Engineer: ER ABHAY S PATIL; Chartered Accountant: CA VAIBHAV VIJAY DANDE; Chartered Accountant: CA GIRISH PADMAKAR AWALGAONKAR; Chartered Accountant: SNGP & COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI PRATIK NAGARI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI PRATIK NAGARI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI PRATIK NAGARI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.