Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Oct 2021Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 61 documents Report an error

SAI PARADISE PROJECT B is a Residential / Group Housing project by Avenuegold Landmarks LLP in Aurangabad, Maharashtra, registered with MahaRERA as P51500018753 on 30 Nov 2018. The registration is recorded completed; possession was promised by 30 Oct 2021.

At a glance

Project

  • NameSAI PARADISE PROJECT B
  • TypeResidential / Group Housing
  • Location
    • Paithan Road
    • Itkheda
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431002
  • Pincode431002
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500018753
  • ReraGenie IDRG-MH-08270

Builder

  • NameAvenuegold Landmarks LLP
  • Entity typePartnership
  • PartnersVinay Chandmal Surana, Deepak Jethmalji Parmar
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredNov 2018PromisedOct 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on30 Nov 2018
  • Promised completion30 Oct 2021
  • Revised completionNone
  • Buildings2 building records
  • Documents filed61 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Row House No 1 To 7NA40000
Row House No 8 to 14NA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 22 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

Row House No 1 To 791%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Row House No 8 to 1491%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 22 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
Row House No 1 To 711
Row House No 8 to 1411

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,740 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2150.5
Proposed, not sanctioned2,150 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKranti Chowk Aurangabad

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAvinash Pawar
PartnerRole in project
Avenuegold Landmarks LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Nov 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Nov 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Nov 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Nov 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 May 2023

Documents filed61

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of ConveyanceFile: Maha RERA - Declaration of Conveyance_Avenue Gold LLP Proj-B.pdf22 Oct 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: img-626122021.pdf20 May 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: img-626121854.pdf20 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form - 5 - Avenuegold Landmark LLP - Date 10-12-2022_0001.pdf7 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 - Sai Paradide Project B 2020-21.pdf2 Jan 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion AMC inward Ack.pdf18 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 - Sai Paradide Project B 2019-20.pdf1 Oct 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: '' Sai Paradise Project -B '' Legal Entity.pdf17 Sep 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Sai Paradise Project-B.pdf17 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A June 20.pdf18 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Sep 20.pdf18 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Dec 20.pdf18 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Sai paradise mar21.pdf18 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Sai paradise jun21.pdf18 Aug 2021
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 scan.pdf9 Jun 2021
OtherFile: Completion AMC inward Ack.pdf9 Jun 2021
Certificates of CA (Form 3)File: FORM 3 - CA Cert SAI PARADISE PROJECT B MAR20.pdf26 May 2021
Certificates of CA (Form 3)File: FORM 3 - CA Cert SAI PARADISE PROJECT B JUN20.pdf26 May 2021
Certificates of CA (Form 3)File: FORM 3 - CA Cert SAI PARADISE PROJECT B SEP20.pdf26 May 2021
Certificates of CA (Form 3)File: FORM 3 - CA Cert SAI PARADISE PROJECT B DEC20.pdf26 May 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archi Certi Sai paradies Project B mar20.pdf31 Mar 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch sai_paradise_project_B_june20.pdf31 Mar 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch sai_parasise_project_B_sep20.pdf31 Mar 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch sai_paradise_project_B_dec_20.pdf31 Mar 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sai paradies Project B Mar20 Eng Cert.pdf31 Mar 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng sai_paradise_project_B_eng_june20.pdf31 Mar 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng sai_paradise_project_B_eng_sep20.pdf31 Mar 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg sai_paradise_project_B_eng_dec20.pdf31 Mar 2021
Form 2AFile: form 2A Project B sai Paradies June 19.pdf31 Mar 2021
Form 2AFile: form 2A Project B Sai paradies Sep 19.pdf31 Mar 2021
Form 2AFile: form 2A Project B Sai paradies Dec 19.pdf31 Mar 2021
Form 2AFile: form 2A Project B Sai paradies Mar 20.pdf31 Mar 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: sai paradies project B Arch Cert Dec 19.pdf4 Feb 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: sai paradies project B Engg Certi Dec 19.pdf4 Feb 2020
Certificates of CA (Form 3)File: Sai Paradiseproject-B 30-6-19.pdf4 Feb 2020
Certificates of CA (Form 3)File: Sai Paradiseproject-B 30-9-19.pdf4 Feb 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE PROJECT A.pdf30 Dec 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE PROJECT B.pdf30 Dec 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch cert Sai paradies Project B June 19.pdf30 Dec 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sai Paradies Project B arch cert Sep 19.pdf30 Dec 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERT PROJECT B.pdf30 Dec 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sai Paradies Project B Eng Cert June 19.pdf30 Dec 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng cert, Sai Paradies Project B Sep 19.pdf30 Dec 2019
Certificates of CA (Form 3)File: Sai Paradise Project-B.pdf30 Nov 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: ''Sai paradise project b''.pdf30 Nov 2019
Form 2AFile: avenue gold dec18 2a.pdf31 May 2019
Form 2AFile: avenue gold mar19 2a.pdf31 May 2019
Details of encumbrancesFile: IMG.pdf27 Nov 2018
Declaration in FORM BFile: IMG (1).pdf27 Nov 2018
Certificates of CA (Form 3)File: SAI PARDISE PROJECT B.pdf27 Nov 2018
Proforma of Allotment letterFile: Agreement to sale Draft Project-B (1).pdf27 Nov 2018
OtherFile: IMG.pdf27 Nov 2018
Layout approvalFile: IMG_008.pdf19 Nov 2018
Building plan approvalFile: IMG_009.pdf19 Nov 2018
Building plan approvalFile: IMG_011.pdf19 Nov 2018
PAN CardFile: Avenuegold_Pan_card.pdf19 Nov 2018
Copy of the legal title reportFile: TITLE REPORT - AVENUEGOLD LANDMARKS.pdf19 Nov 2018
Copy of Layout Approval (in case of layout)File: IMG_008.pdf19 Nov 2018
Building Plan Approval (IOD)File: IMG_009.pdf19 Nov 2018
Building Plan Approval (IOD)File: IMG_011.pdf19 Nov 2018
Commencement Certificates / NA Order for plotted developmentFile: Comencement certificate.pdf19 Nov 2018

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is completed

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep SAI PARADISE PROJECT B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Itkheda1,400+ in Aurangabad

2 kmSAI PARADISE PROJECT BCompleted 15Lapsed / revoked 11Other 29Dot size: filed unitsN

Filed coordinates, straight-line distance. 55 registered projects within 2 km.

Builder: Avenuegold Landmarks LLP

Avenuegold Landmarks LLP has 2 registrations on MahaRERA, including SAI PARADISE PROJECT B and SAI PARADISE PROJECT A. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if SAI PARADISE PROJECT B is delayed beyond 30 Oct 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI PARADISE PROJECT B?

The registered promoter entity is Avenuegold Landmarks LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI PARADISE PROJECT B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI PARADISE PROJECT B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI PARADISE PROJECT B?

The professionals named in the filing: Architect: Avinash Pawar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI PARADISE PROJECT B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI PARADISE PROJECT B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI PARADISE PROJECT B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.