Home / Browse projects / Raigarh, Maharashtra / SAI KRUPA VALLEY- PHASE 1
SAI KRUPA VALLEY- PHASE 1
RG-MH-11055 · RERA P52000000739 · Last updated on MahaRERA portal: 20 Apr 2025
Source: official MahaRERA filing
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SAI KRUPA VALLEY- PHASE 1 is a Residential / Group Housing project by SAI KRUPA DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000000739 on 23 Jul 2017. The registration is recorded completed; possession was promised by 1 Aug 2026. The completion date has moved by 12 months from the original filing.
At a glance
Project
- NameSAI KRUPA VALLEY- PHASE 1
- TypeResidential / Group Housing
- Location
- Neral
- Karjat
- Raigarh
- 410101
- Pincode410101
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000000739
- ReraGenie IDRG-MH-11055
Builder
- NameSAI KRUPA DEVELOPERS
- Entity typePartnership
- PartnersRUSHISH MANSUKH TIMBADIA, LALIT VASHRAMBHAI PATODIA, BHARAT VASHRAMBHAI PATODIA, HEMANT RANCHODBHAI KATHIRIYA, JAYESH VITTHAL TIMBADIA, RANCHOD TEJABHAI TIMBADIA, RAMESH VASHRAMBHAI PATODIA, INDU RATILAL PATODIA
- Other registrations5 more →
- Completed4 of 6
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects3 →
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on23 Jul 2017
- Promised completion1 Aug 2026
- Revised completionRevised to 1 Aug 2026 (originally 1 Aug 2025)
- Buildings5 building records
- Documents filed111 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING NO 1 | NA | 9 | 0 | 0 | 0 | 0 |
| BUILDING NO 2 | NA | 9 | 0 | 0 | 0 | 0 |
| BUILDING NO 3 | NA | 16 | 0 | 0 | 0 | 0 |
| BUILDING NO 4 | NA | 9 | 0 | 0 | 0 | 0 |
| BUILDING NO 5 | NA | 5 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 20 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
49 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Staircases, at 88%.
BUILDING NO 1100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO 2100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO 362%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 71% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 25% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 88% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING NO 4100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING NO 5100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 20 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 65% |
| Water Supply | Yes | 72% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 75% |
| Storm Water Drains | Yes | 80% |
| Landscaping & Tree Planting | Yes | 70% |
| Street Lighting | Yes | 80% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 95% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 72% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 70% |
| Electrical meter room, sub-station, receiving station | Yes | 72% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed369
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| BUILDING NO 1 | 70 | 70 |
| BUILDING NO 2 | 114 | 114 |
| BUILDING NO 3 | 105 | 105 |
| BUILDING NO 4 | 79 | 79 |
| BUILDING NO 5 | 1 | 1 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| SAI KRUPA DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Aug 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 Dec 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 12 Dec 2022
Documents filed111
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 111 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of CA (Form 3)File: Form 3 Sai Krupa Valley- Phase 1 as on 31-03-2025.pdf | 20 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Sai Krupa Valley Phase 1 as on March 2025.pdf | 20 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Sai Krupa Valley Phase 1 as on March 2025.pdf | 12 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM - 1 Sai Krupa Valley Phase 1 Sep 2024 (1)_compressed.pdf | 13 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Sai Krupa Valley Phase 1 as on Dec 2024.pdf | 13 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 - Sai Krupa Valley Phase 1 as on Sept 2024.pdf | 13 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 - Sai Krupa Valley Phase 1 as on Dec 2024.pdf | 13 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Sai Krupa Valley Phase 1 as on Sept 2024.pdf | 13 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Sai Krupa Valley Phase 1 as on Dec 2024.pdf | 13 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Sai Krupa Valley Phase 1 for FY 2023-24.PDF | 13 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Sai Krupa Valley Phase 1 as on June 2024.pdf | 12 Jul 2024 |
| Certificates of CA (Form 3)File: Form 3 Sai Krupa Valley- Phase 1 as on 30-6-2024.pdf | 12 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTS CERTIFICATE -FORM 1.PDF | 4 Jul 2024 |
| Home Buyer /Allottee Grievance Redressal CellFile: Declaration of Establishment of complaint redressal cell.PDF | 28 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: CIRCULAR 29 - Sai Krupa Valley Phase 1 as on March 2024.PDF | 13 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Sai Krupa Valley Phase 1 as on March 2024.pdf | 16 Apr 2024 |
| Certificates of CA (Form 3)File: Form 3 Sai Krupa Valley Mar 2024.pdf | 16 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Sai Krupa Valley Phase I as on March 2024.PDF | 8 Apr 2024 |
| Certificates of CA (Form 3)File: Form 3_11zon.pdf | 28 Feb 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: DECLARATION ABOUT SEPARATE BANK ACCOUNT FOR REAL ESTATE PROJECTS.pdf | 15 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Sai Krupa Valley Phase 1 as on Dec 2023.pdf | 10 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Sai Krupa Valley Phase 1 as on Dec 2023.pdf | 8 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: C-29 All 4 Bldg_11zon.pdf | 8 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3_11zon (1).pdf | 8 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 Sai Krupa Valley Phase 1 Dec 2023.pdf | 8 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Sai Krupa Valley Phase 1 as on Sep 2023.pdf | 11 Oct 2023 |
| Certificates of CA (Form 3)File: Form 3- Sai Krupa Valley as on September 2023.pdf | 9 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT'S CERTIFICATE -FORM -1.pdf | 3 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 as on 2022-23.PDF | 29 Sep 2023 |
| Layout approvalFile: LAYOUT PLAN.pdf | 9 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf | 9 Aug 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 26 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A as on 2022-23.PDF | 26 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Sai Krupa Valley Phase I as on June 2023.pdf | 15 Jul 2023 |
| Certificates of CA (Form 3)File: Form 3- Sai Krupa Valley June 2023.pdf | 15 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: ilovepdf_merged (18)_compressed.pdf | 24 May 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SKD - ARCHITECT'S CERTIFICATE.pdf | 11 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sai Krupa Valley Dec 22 - Form 2.pdf | 10 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sai Krupa Valley Mar 23 - Form 2.pdf | 10 Apr 2023 |
| Certificates of CA (Form 3)File: Form 3 Sai Krupa Valley Dec 2022.pdf | 10 Apr 2023 |
| Certificates of CA (Form 3)File: Form 3- Sai Krupa Valley Mar 2023.pdf | 10 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Sai Krupa Valley Phase 1.PDF | 6 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: sai krupa form5 fy20_21.pdf | 27 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 FY 21-22 - Sai Krupa.pdf | 27 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: skd form 2A 19 20.pdf | 2 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: skd form 2A 20 21.pdf | 2 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: skd form 2A 21 22.pdf | 2 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sai Krupa Valley Phase 1 Form 2- September 2022.pdf | 19 Dec 2022 |
| Disclosure of sold/ booked inventoryFile: CIRCULAR _compressed.pdf | 19 Dec 2022 |
| Certificates of CA (Form 3)File: Form 3- Sai Krupa Valley Phase 1 as on September 2022.pdf | 19 Dec 2022 |
| Declaration about Commencement CertificateFile: SKD PHASE 1 Format D.pdf | 17 Dec 2022 |
| Building plan approvalFile: Sai Krupa Valley Building Plan Approval_compressed.pdf | 14 Dec 2022 |
| Building Plan Approval (IOD)File: Sai Krupa Valley Building Plan Approval_compressed.pdf | 14 Dec 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Sai Krupa Valley Phase-1 Commencement Certificate_compressed.pdf | 12 Dec 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC- Sai Krupa Valley Phase 1 Building 1_compressed.pdf | 12 Dec 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC- Sai Krupa Valley Phase 1 Building 2_compressed.pdf | 12 Dec 2022 |
| CERSAI detailsFile: Sai Krupa Valley Phase - 1.pdf | 3 Dec 2022 |
| Building plan approvalFile: Sai Krupa Valley Layout.pdf | 25 Nov 2022 |
| Building Plan Approval (IOD)File: Sai Krupa Valley Layout.pdf | 25 Nov 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Sai Krupa Valley Commencement Certificate_compressed.pdf | 25 Nov 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sai Krupa Valley Phase 1 Form 2- June 2022.pdf | 26 Sep 2022 |
| Certificates of CA (Form 3)File: Form 3 June 2022.pdf | 26 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sai Krupa Valley Phase 1 Form 2- 31 March 2022.pdf | 2 Jul 2022 |
| Certificates of CA (Form 3)File: Form 3_Sai Krupa Developers_March 2022.pdf | 2 Jul 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: SKD Form 5-FY 18-19.pdf | 12 Apr 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 March 2020.pdf | 12 Apr 2021 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 comp.pdf | 24 Feb 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SKD- ARCHITECT'S CERTIFICATE.PDF | 20 Jan 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SKD- ENGINEER'S CERTIFICATE.PDF | 20 Jan 2020 |
| Certificates of CA (Form 3)File: SKD- CA CERTIFICATE.PDF | 20 Jan 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf | 21 Aug 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf | 21 Aug 2019 |
| Certificates of CA (Form 3)File: form 3.pdf | 21 Aug 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sai Krupa-Architect Certificate .pdf | 24 Apr 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sai Krupa-Engineer Certificate .pdf | 24 Apr 2019 |
| Certificates of CA (Form 3)File: Form 3.pdf | 24 Apr 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE-ilovepdf-compressed.pdf | 9 Jan 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICAT-ilovepdf-compressed.pdf | 9 Jan 2019 |
| Certificates of CA (Form 3)File: KMBT_195_01314.pdf | 9 Jan 2019 |
| Certificates of CA (Form 5)File: Form 5-Sai Kupa - RERA.pdf | 13 Oct 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 5 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 111 filed documents as one ZIP, foldered, with a manifest
Keep SAI KRUPA VALLEY- PHASE 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Neral5,900+ in Raigarh
Filed coordinates, straight-line distance. 114 registered projects within 2 km.
ForeverLand
HOABL IMPACTUM LAND PRIVATE LIMITED
Chitrapatjanak Dadasaheb Phalke Township - Pha
Anukarati Homes Pvt Ltd
Olympeo Neo City
PRIZTINE INFRA LLP
DEEPJYOTI CITY
DeepJyoti Infra
VISION AARAMBH
M/s Vision Aarambh ( AOP )
Olympeo Riverside - Phase 3
Olympeo Riverside Projects LLP
See every Raigarh project, with the district possession charts
Builder: SAI KRUPA DEVELOPERS
SAI KRUPA DEVELOPERS has 6 registrations on MahaRERA, including SAI KRUPA VALLEY- PHASE 1 and Nida Amisha Heights. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if SAI KRUPA VALLEY- PHASE 1 is delayed beyond 1 Aug 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SAI KRUPA VALLEY- PHASE 1?
The registered promoter entity is SAI KRUPA DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SAI KRUPA VALLEY- PHASE 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SAI KRUPA VALLEY- PHASE 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in SAI KRUPA VALLEY- PHASE 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback