Home / Browse projects / Pune, Maharashtra / Sai kalash
Sai kalash
RG-MH-04660 · RERA P52100019989 · Last updated on MahaRERA portal: 18 Sep 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 51 months
- 3 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Sai kalash is a Residential / Group Housing project by Sai Anand Properties in Pune, Maharashtra, registered with MahaRERA as P52100019989 on 15 Mar 2019. Possession is promised by 15 Mar 2027. The completion date has moved by 51 months from the original filing. 40 of the 40 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete.
At a glance
Project
- NameSai kalash
- TypeResidential / Group Housing
- Location
- Gangadham to Shatrunjay temple Road
- Near Nana nani Park
- kondhwa BK
- Haveli
- Pune
- 411048
- Pincode411048
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100019989
- ReraGenie IDRG-MH-04660
Builder
- NameSai Anand Properties
- Entity typePartnership
- PartnersPiyush Vilas Dugad, Amit Suryakant Bhansali, Sujit Pramod Bhansali
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on15 Mar 2019
- Promised completion15 Mar 2027
- Revised completionRevised to 15 Mar 2027 (originally 15 Dec 2022)
- Buildings2 building records
- Documents filed140 files
Current status
Figures as on 18 Sep 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building A | NA | 6 | 5 | 20 | 0 | 20 |
| Building B | NA | 5 | 5 | 20 | 0 | 20 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 18 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
Building A82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building B82%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 18 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 50% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 100% |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Building A | NA | Rs 2.25 cr | Rs 3.45 cr |
| Building B | NA | Rs 2.25 cr | Rs 3.45 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | M/s. Elegance Architects |
| Engineer | Sanket Brahmankar |
| Engineer | Sumit Pramod Bhansali |
| Chartered Accountant | PGMJ & Associates |
| Chartered Accountant | Ranjeetkaur Harvindersingh Pothiwal |
| Partner | Role in project |
|---|---|
| Sai Anand Properties | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterReason for Extension: On Account of varied reasons at different points of time during the tenure of the project such as: a. Non- availability or limited supply of steel, other building material, water or electric supply. b. Delay on the part of the Local Authority or any other Public Body or Authority including the M.S.E.D.C.L, in issuing or granting necessary Certificates / Noc’s / Permissions / Licenses / Connections of any service such as Electricity, Drains and Water Connections and Meters to the said Project under construction by the Promoters on the said Land. c. Compliances with the cha
Reason as filed by the promoterThe Occupancy Certificate for the project has already been obtained from the Competent Authority. However, due to administrative and procedural reasons, the application for project completion could not be successfully processed on the MahaCRITI portal before the project registration lapsed.The extension is therefore being sought solely to enable access to the MahaCRITI portal for completing the pending statutory compliances, carrying out the necessary corrections, and submitting the project completion application. No construction activity or sale of units is pending, and the project has alread
Reason as filed by the promoterNA
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Mar 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 28 Jun 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Jun 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 28 Jun 2023
Documents filed140
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 140 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: AR Cert (1).pdf | 18 Sep 2026 |
| Withdrawal Update Form 1 | 18 Sep 2026 |
| Withdrawal Update Form 1File: AR Cert (1).pdf | 18 Sep 2026 |
| Withdrawal Update Form 1File: AR Cert (1).pdf | 18 Sep 2026 |
| Withdrawal Update Form 1File: AR Cert (1).pdf | 18 Sep 2026 |
| Withdrawal Update Form 2File: Engineer certificate.pdf | 18 Sep 2026 |
| Withdrawal Update Form 2 | 18 Sep 2026 |
| Withdrawal Update Form 2File: Engineer certificate.pdf | 18 Sep 2026 |
| Withdrawal Update Form 2File: Engineer certificate.pdf | 18 Sep 2026 |
| Withdrawal Update Form 2File: Engineer certificate.pdf | 18 Sep 2026 |
| Withdrawal Update Form 3File: CA Certificate_Sai Kalash_June 25.pdf | 18 Sep 2026 |
| Withdrawal Update Form 3 | 18 Sep 2026 |
| Withdrawal Update Form 3File: CA Certificate_Sai Kalash_June 25.pdf | 18 Sep 2026 |
| Withdrawal Update Form 3File: CA Certificate_Sai Kalash_June 25.pdf | 18 Sep 2026 |
| Withdrawal Update Form 3File: CA Certificate_Sai Kalash_June 25.pdf | 18 Sep 2026 |
| Form 2A (FY 2025-2026)File: Form 2A FY 25-26.pdf | 18 Sep 2026 |
| Form 1File: Sai Anand Certificates- Mar 20.pdf | 27 Jan 2026 |
| Form 2File: Engineer certificate 31-03-2020.pdf | 27 Jan 2026 |
| Form 3File: CA Certificate_Sai Kalash_Mar 20.pdf | 27 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: sai kalash booked inventory 31-03-2020.pdf | 27 Jan 2026 |
| Form 1File: Sai Anand Certificates- Mar 21.pdf | 27 Jan 2026 |
| Form 2File: Engineer certificate 31-03-2021.pdf | 27 Jan 2026 |
| Form 3File: CA Certificate_Sai Kalash_Mar 21.pdf | 27 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: sai kalash booked inventory 31-03-2021.pdf | 27 Jan 2026 |
| Form 1File: Sai Anand Certificates- Mar 22.pdf | 27 Jan 2026 |
| Form 2File: Engineer certificate March 22.pdf | 27 Jan 2026 |
| Form 3File: CA Certificate_Sai Kalash_Mar 22.pdf | 27 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: sai kalash booked inventory 31-03-2022.pdf | 27 Jan 2026 |
| Form 1File: Sai Anand Certificates- Mar 23.pdf | 27 Jan 2026 |
| Form 2File: Engineer certificate March 23.pdf | 27 Jan 2026 |
| Form 3File: CA Certificate_Sai Kalash_Mar 23.pdf | 27 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: sai kalash booked inventory 31-03-2023.pdf | 27 Jan 2026 |
| Form 1File: Sai Anand Certificates- Mar 24.pdf | 27 Jan 2026 |
| Form 2File: Engineer certificate March 24.pdf | 27 Jan 2026 |
| Form 3File: CA Certificate_Sai Kalash_Mar 24.pdf | 27 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sai kalash booked inventory 31-03-2024.pdf | 27 Jan 2026 |
| Form 1File: Sai Anand Certificates- Mar 20.pdf | 27 Jan 2026 |
| Form 2File: Engineer certificate March 20.pdf | 27 Jan 2026 |
| Form 3File: CA Certificate_Sai Kalash_Mar 20.pdf | 27 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: sai kalash booked inventory 31-03-2020.pdf | 27 Jan 2026 |
| Form 1File: Sai Anand Certificates- Mar 20.pdf | 27 Jan 2026 |
| Form 2File: Engineer certificate March 20.pdf | 27 Jan 2026 |
| Form 3File: CA Certificate_Sai Kalash_Mar 20.pdf | 27 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: sai kalash booked inventory 31-03-2020.pdf | 27 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: sai kalash booked inventory 31-03-2020.pdf | 27 Jan 2026 |
| Form 1File: Sai Anand Certificates- Mar 20.pdf | 27 Jan 2026 |
| Form 2File: Engineer certificate March 20.pdf | 27 Jan 2026 |
| Form 3File: CA Certificate_Sai Kalash_Mar 20.pdf | 27 Jan 2026 |
| Form 1File: Sai Anand Certificates- Mar 21.pdf | 27 Jan 2026 |
| Form 2File: Engineer certificate March 21.pdf | 27 Jan 2026 |
| Form 3File: CA Certificate_Sai Kalash_Mar 21.pdf | 27 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: sai kalash booked inventory 31-03-2021.pdf | 27 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: sai kalash booked inventory 31-03-2021.pdf | 27 Jan 2026 |
| Form 1File: Sai Anand Certificates- Mar 21.pdf | 27 Jan 2026 |
| Form 2File: Engineer certificate March 21.pdf | 27 Jan 2026 |
| Form 3File: CA Certificate_Sai Kalash_Mar 21.pdf | 27 Jan 2026 |
| Form 2File: Engineer certificate March 21.pdf | 27 Jan 2026 |
| Form 1File: Sai Anand Certificates- Mar 21.pdf | 27 Jan 2026 |
| Form 3File: CA Certificate_Sai Kalash_Mar 21.pdf | 27 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: sai kalash booked inventory 31-03-2021.pdf | 27 Jan 2026 |
| Form 1File: Sai Anand Certificates- Mar 22.pdf | 27 Jan 2026 |
| Form 2File: Engineer certificate March 22.pdf | 27 Jan 2026 |
| Form 3File: CA Certificate_Sai Kalash_Mar 22.pdf | 27 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: sai kalash booked inventory 31-03-2022.pdf | 27 Jan 2026 |
| Form 1File: Sai Anand Certificates- Mar 22.pdf | 27 Jan 2026 |
| Form 2File: Engineer certificate March 22.pdf | 27 Jan 2026 |
| Form 3File: CA Certificate_Sai Kalash_Mar 22.pdf | 27 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: sai kalash booked inventory 31-03-2022.pdf | 27 Jan 2026 |
| Form 1File: Sai Anand Certificates- Mar 22.pdf | 27 Jan 2026 |
| Form 2File: Engineer certificate March 22.pdf | 27 Jan 2026 |
| Form 3File: CA Certificate_Sai Kalash_Mar 22.pdf | 27 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: sai kalash booked inventory 31-03-2022.pdf | 27 Jan 2026 |
| Form 1File: Sai Anand Certificates- Mar 23.pdf | 27 Jan 2026 |
| Form 2File: Engineer certificate March 23.pdf | 27 Jan 2026 |
| Form 3File: CA Certificate_Sai Kalash_Mar 23.pdf | 27 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: sai kalash booked inventory 31-03-2023.pdf | 27 Jan 2026 |
| Form 2File: Engineer certificate March 23.pdf | 27 Jan 2026 |
| Form 1File: Sai Anand Certificates- Mar 23.pdf | 27 Jan 2026 |
| Form 3File: CA Certificate_Sai Kalash_Mar 23.pdf | 27 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: sai kalash booked inventory 31-03-2023.pdf | 27 Jan 2026 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 140 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Sai kalash on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Near Nana nani Park13,700+ in Pune
Filed coordinates, straight-line distance. 178 registered projects within 2 km.
Dwarikadham
Yashodhan Affordable Landmark LLP
UNITAS FASHION CENTER
UNITATIS DEVELOPMENTS PVT. LTD
Millennium Park
Xrbia Epoch Creations LLP
BABAR CLASSIC VISTA WING E, F, G
Classic Properties
JITO NAGAR
JAIN ASHAPURI DEVELOPER UNIT II
Wellwisher West Views
Bhansali Infrastructure LLP
Builder: Sai Anand Properties
Sai Anand Properties has 1 registration on MahaRERA, including Sai kalash. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Sai kalash is delayed beyond 15 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Sai kalash?
The registered promoter entity is Sai Anand Properties, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Sai kalash?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Sai kalash?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Sai kalash?
The professionals named in the filing: Architect: M/s. Elegance Architects; Engineer: Sanket Brahmankar; Engineer: Sumit Pramod Bhansali; Chartered Accountant: PGMJ & Associates; Chartered Accountant: Ranjeetkaur Harvindersingh Pothiwal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Sai kalash?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback