Home / Browse projects / Pune, Maharashtra / Sai kalash

Registered No litigation declared Residential / Group Housing project

Sai kalash

By Sai Anand Properties

RG-MH-04660 · RERA P52100019989 · Last updated on MahaRERA portal: 18 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 51 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 51 months from the original
18 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0 of 40Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 140 documents Report an error

Sai kalash is a Residential / Group Housing project by Sai Anand Properties in Pune, Maharashtra, registered with MahaRERA as P52100019989 on 15 Mar 2019. Possession is promised by 15 Mar 2027. The completion date has moved by 51 months from the original filing. 40 of the 40 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete.

At a glance

Project

  • NameSai kalash
  • TypeResidential / Group Housing
  • Location
    • Gangadham to Shatrunjay temple Road
    • Near Nana nani Park
    • kondhwa BK
    • Haveli
    • Pune
    • 411048
  • Pincode411048
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100019989
  • ReraGenie IDRG-MH-04660

Builder

  • NameSai Anand Properties
  • Entity typePartnership
  • PartnersPiyush Vilas Dugad, Amit Suryakant Bhansali, Sujit Pramod Bhansali

Key dates

this monthRegisteredMar 2019First promiseDec 2022Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Mar 2019
  • Promised completion15 Mar 2027
  • Revised completionRevised to 15 Mar 2027 (originally 15 Dec 2022)
  • Buildings2 building records
  • Documents filed140 files

Current status

100%40 of 40 units booked
153.3%Work done, per cost certificate

Figures as on 18 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA6520020
Building BNA5520020

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 18 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

Building A82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building B82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 18 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,600 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on7 Jul 2026

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI2461.32
Proposed, not sanctioned1,760 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC Bank Ltd S No 571 Crystal Roomnear Suryaprabha Garden Kenjale Nagar Bibvewadi
Estimated costRs 4.50 cr
Cost incurredRs 6.90 cr
Work done153.26%
BuildingWingEstimatedIncurred
Building ANARs 2.25 crRs 3.45 cr
Building BNARs 2.25 crRs 3.45 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/s. Elegance Architects
EngineerSanket Brahmankar
EngineerSumit Pramod Bhansali
Chartered AccountantPGMJ & Associates
Chartered AccountantRanjeetkaur Harvindersingh Pothiwal
PartnerRole in project
Sai Anand Properties-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100013268Dec 2022 → Dec 2024

Reason as filed by the promoterReason for Extension: On Account of varied reasons at different points of time during the tenure of the project such as: a. Non- availability or limited supply of steel, other building material, water or electric supply. b. Delay on the part of the Local Authority or any other Public Body or Authority including the M.S.E.D.C.L, in issuing or granting necessary Certificates / Noc’s / Permissions / Licenses / Connections of any service such as Electricity, Drains and Water Connections and Meters to the said Project under construction by the Promoters on the said Land. c. Compliances with the cha

EA29072621917Dec 2022 → Nov 2026

Reason as filed by the promoterThe Occupancy Certificate for the project has already been obtained from the Competent Authority. However, due to administrative and procedural reasons, the application for project completion could not be successfully processed on the MahaCRITI portal before the project registration lapsed.The extension is therefore being sought solely to enable access to the MahaCRITI portal for completing the pending statutory compliances, carrying out the necessary corrections, and submitting the project completion application. No construction activity or sale of units is pending, and the project has alread

P52100019989/WarDec 2022 → Mar 2027

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Mar 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 Jun 2023

Documents filed140

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 140 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: AR Cert (1).pdf18 Sep 2026
Withdrawal Update Form 118 Sep 2026
Withdrawal Update Form 1File: AR Cert (1).pdf18 Sep 2026
Withdrawal Update Form 1File: AR Cert (1).pdf18 Sep 2026
Withdrawal Update Form 1File: AR Cert (1).pdf18 Sep 2026
Withdrawal Update Form 2File: Engineer certificate.pdf18 Sep 2026
Withdrawal Update Form 218 Sep 2026
Withdrawal Update Form 2File: Engineer certificate.pdf18 Sep 2026
Withdrawal Update Form 2File: Engineer certificate.pdf18 Sep 2026
Withdrawal Update Form 2File: Engineer certificate.pdf18 Sep 2026
Withdrawal Update Form 3File: CA Certificate_Sai Kalash_June 25.pdf18 Sep 2026
Withdrawal Update Form 318 Sep 2026
Withdrawal Update Form 3File: CA Certificate_Sai Kalash_June 25.pdf18 Sep 2026
Withdrawal Update Form 3File: CA Certificate_Sai Kalash_June 25.pdf18 Sep 2026
Withdrawal Update Form 3File: CA Certificate_Sai Kalash_June 25.pdf18 Sep 2026
Form 2A (FY 2025-2026)File: Form 2A FY 25-26.pdf18 Sep 2026
Form 1File: Sai Anand Certificates- Mar 20.pdf27 Jan 2026
Form 2File: Engineer certificate 31-03-2020.pdf27 Jan 2026
Form 3File: CA Certificate_Sai Kalash_Mar 20.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: sai kalash booked inventory 31-03-2020.pdf27 Jan 2026
Form 1File: Sai Anand Certificates- Mar 21.pdf27 Jan 2026
Form 2File: Engineer certificate 31-03-2021.pdf27 Jan 2026
Form 3File: CA Certificate_Sai Kalash_Mar 21.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: sai kalash booked inventory 31-03-2021.pdf27 Jan 2026
Form 1File: Sai Anand Certificates- Mar 22.pdf27 Jan 2026
Form 2File: Engineer certificate March 22.pdf27 Jan 2026
Form 3File: CA Certificate_Sai Kalash_Mar 22.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: sai kalash booked inventory 31-03-2022.pdf27 Jan 2026
Form 1File: Sai Anand Certificates- Mar 23.pdf27 Jan 2026
Form 2File: Engineer certificate March 23.pdf27 Jan 2026
Form 3File: CA Certificate_Sai Kalash_Mar 23.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: sai kalash booked inventory 31-03-2023.pdf27 Jan 2026
Form 1File: Sai Anand Certificates- Mar 24.pdf27 Jan 2026
Form 2File: Engineer certificate March 24.pdf27 Jan 2026
Form 3File: CA Certificate_Sai Kalash_Mar 24.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sai kalash booked inventory 31-03-2024.pdf27 Jan 2026
Form 1File: Sai Anand Certificates- Mar 20.pdf27 Jan 2026
Form 2File: Engineer certificate March 20.pdf27 Jan 2026
Form 3File: CA Certificate_Sai Kalash_Mar 20.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: sai kalash booked inventory 31-03-2020.pdf27 Jan 2026
Form 1File: Sai Anand Certificates- Mar 20.pdf27 Jan 2026
Form 2File: Engineer certificate March 20.pdf27 Jan 2026
Form 3File: CA Certificate_Sai Kalash_Mar 20.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: sai kalash booked inventory 31-03-2020.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: sai kalash booked inventory 31-03-2020.pdf27 Jan 2026
Form 1File: Sai Anand Certificates- Mar 20.pdf27 Jan 2026
Form 2File: Engineer certificate March 20.pdf27 Jan 2026
Form 3File: CA Certificate_Sai Kalash_Mar 20.pdf27 Jan 2026
Form 1File: Sai Anand Certificates- Mar 21.pdf27 Jan 2026
Form 2File: Engineer certificate March 21.pdf27 Jan 2026
Form 3File: CA Certificate_Sai Kalash_Mar 21.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: sai kalash booked inventory 31-03-2021.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: sai kalash booked inventory 31-03-2021.pdf27 Jan 2026
Form 1File: Sai Anand Certificates- Mar 21.pdf27 Jan 2026
Form 2File: Engineer certificate March 21.pdf27 Jan 2026
Form 3File: CA Certificate_Sai Kalash_Mar 21.pdf27 Jan 2026
Form 2File: Engineer certificate March 21.pdf27 Jan 2026
Form 1File: Sai Anand Certificates- Mar 21.pdf27 Jan 2026
Form 3File: CA Certificate_Sai Kalash_Mar 21.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: sai kalash booked inventory 31-03-2021.pdf27 Jan 2026
Form 1File: Sai Anand Certificates- Mar 22.pdf27 Jan 2026
Form 2File: Engineer certificate March 22.pdf27 Jan 2026
Form 3File: CA Certificate_Sai Kalash_Mar 22.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: sai kalash booked inventory 31-03-2022.pdf27 Jan 2026
Form 1File: Sai Anand Certificates- Mar 22.pdf27 Jan 2026
Form 2File: Engineer certificate March 22.pdf27 Jan 2026
Form 3File: CA Certificate_Sai Kalash_Mar 22.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: sai kalash booked inventory 31-03-2022.pdf27 Jan 2026
Form 1File: Sai Anand Certificates- Mar 22.pdf27 Jan 2026
Form 2File: Engineer certificate March 22.pdf27 Jan 2026
Form 3File: CA Certificate_Sai Kalash_Mar 22.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: sai kalash booked inventory 31-03-2022.pdf27 Jan 2026
Form 1File: Sai Anand Certificates- Mar 23.pdf27 Jan 2026
Form 2File: Engineer certificate March 23.pdf27 Jan 2026
Form 3File: CA Certificate_Sai Kalash_Mar 23.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: sai kalash booked inventory 31-03-2023.pdf27 Jan 2026
Form 2File: Engineer certificate March 23.pdf27 Jan 2026
Form 1File: Sai Anand Certificates- Mar 23.pdf27 Jan 2026
Form 3File: CA Certificate_Sai Kalash_Mar 23.pdf27 Jan 2026
Disclosure of Sold and Booked InventoryFile: sai kalash booked inventory 31-03-2023.pdf27 Jan 2026

How this compares with Pune

100%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 51 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sai kalash on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Nana nani Park13,700+ in Pune

2 kmSai kalashCompleted 68Lapsed / revoked 44Other 66Dot size: filed unitsN

Filed coordinates, straight-line distance. 178 registered projects within 2 km.

Builder: Sai Anand Properties

Sai Anand Properties has 1 registration on MahaRERA, including Sai kalash. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Sai kalash is delayed beyond 15 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sai kalash?

The registered promoter entity is Sai Anand Properties, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sai kalash?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sai kalash?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sai kalash?

The professionals named in the filing: Architect: M/s. Elegance Architects; Engineer: Sanket Brahmankar; Engineer: Sumit Pramod Bhansali; Chartered Accountant: PGMJ & Associates; Chartered Accountant: Ranjeetkaur Harvindersingh Pothiwal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sai kalash?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sai kalash. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sai kalash to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.