Home / Browse projects / Thane, Maharashtra / Sai Ganesh Co-Operative Housing Society Ltd

Completed No litigation declared Residential / Group Housing project

Sai Ganesh Co-Operative Housing Society Ltd

By Shree Vyankatesh Enterprises

RG-MH-05807 · RERA P51700051405 · Last updated on MahaRERA portal: 31 Mar 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
May 2026Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Internal walls, 60%
26 of 26Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

Sai Ganesh Co-Operative Housing Society Ltd is a Residential / Group Housing project by Shree Vyankatesh Enterprises in Thane, Maharashtra, registered with MahaRERA as P51700051405 on 8 Jun 2023. The registration is recorded completed; possession was promised by 31 May 2026. 0 of the 26 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameSai Ganesh Co-Operative Housing Society Ltd
  • TypeResidential / Group Housing
  • Location
    • Mahatma Phule Road
    • Dombivli West
    • DOMBIVLI
    • Kalyan
    • Thane
    • 421202
  • Pincode421202
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700051405
  • ReraGenie IDRG-MH-05807

Builder

  • NameShree Vyankatesh Enterprises
  • Entity typePartnership
  • PartnersSamir Dasharath Deshmukh, Vilas Ramchandra Deshmukh, Prashant Ashok Rakhade, Sushant Ashok Rakhade, Ajit Bhagwandas sanghvi, Milind Kamalakar Moghe, Milind Deshmukh
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredJun 2023PromisedMay 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on8 Jun 2023
  • Promised completion31 May 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed67 files

Current status

0%0 of 26 units booked
74.0%Work done, per cost certificate

Figures as on 31 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sai GaneshNA8826026

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 31 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 60%.

Sai Ganesh: 59% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 31 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed34

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots34
Closed/Covered34

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area468 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Sep 2024
LandownerVillageDistrict
Sai Ganesh Co-Op Hsg Society LtdDOMBIVLIThane

Approvals and building plan

Sanctioning authorityKalyan Dombivali Municipal Corporation
Permissible FSI1709.86
Proposed, not sanctioned1,710 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1ST FLOOR, SHANKAR SMRITI ANNEXE, SUBASH ROAD, VISHNU NAGAR, MUMBAI, MAHARASHTRA - 421202
Estimated costRs 4.52 cr
Cost incurredRs 3.35 cr
Work done74.01%
BuildingWingEstimatedIncurred
Sai GaneshNARs 3.90 crRs 3.35 cr
-NARs 62.30 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRachana Shilp Architect & Interior Designers
EngineerRajesh Thakare and associated
Chartered AccountantKapure & Kapure chartered accountats
Chartered AccountantNAVAL KARNIK & CO,
PartnerRole in project
Shree Vyankatesh Enterprises-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2024-2025)File: Sai Ganesh - Form 5 - 24-25.pdf31 Mar 2026
Withdrawal Update Form 1File: Sai Ganesh - Form 1.pdf18 Oct 2025
Withdrawal Update Form 2File: Shree Vyankatesh - Form 2.pdf18 Oct 2025
Withdrawal Update Form 3File: Sai Ganesh - form 3_compressed.pdf18 Oct 2025
Occupational CertificateFile: Sai Ganesh - Occupancy Certificate.pdf18 Oct 2025
Form 1File: Form 1 - Sai Ganesh - March 25.pdf14 Jul 2025
Form 2File: Form 2.pdf14 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure - Sai Ganesh - March 25.pdf14 Jul 2025
Form 3File: Signed Form 3 - Sai Ganesh - March 25_compressed.pdf14 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Sai Ganesh - March 25.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 - Sai Ganesh - March 25_compressed.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure - Sai Ganesh - March 25.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sai Ganesh - Form 1.pdf19 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf19 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sai Ganesh - Form 2.pdf19 Jan 2025
Disclosure of sold/ booked inventoryFile: Sai Ganesh Disclosure.pdf19 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Sai ganesh CHS.pdf21 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sai Ganesh - Arch Sep - 2024.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sai Ganesh - Form 3_compressed.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sai Ganesh - Engg Sep - 2024.pdf20 Oct 2024
Disclosure of sold/ booked inventoryFile: Sai Ganesh - Disclosure Sept 2024.pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure June 24 - Sai Ganesh.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sai Ganesh_compressed.pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assuarance - Sai Ganesh - 2024.pdf14 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Sai Ganesh Shree Vyankatesh Enterprises 05-04-24.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shree Vyankatesh Ent Sai Ganesh - Engg Cer Mar-24.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure Mar-24 - Shree Vyankatesh Ent.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rachna Empire - Signed form 3_compressed.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sai Ganesh - Signed Form 3_compressed.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sai Ganesh Engg Cert Dec 2023.pdf17 Jan 2024
Disclosure of sold/ booked inventoryFile: Sai Ganesh Flat Inventory.pdf17 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sai Ganesh - Form 3_compressed.pdf17 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sai Ganesh Dec ArchCert.pdf14 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sai Ganesh - Architect.pdf18 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sai Ganesh - Engg.pdf18 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 Sai Ganesh co-op Society Sep 23_compressed.pdf18 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf16 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Sai Ganesh - Declaration of Seperate Bank Account.pdf12 May 2023
Layout approvalFile: Plan 1.pdf8 May 2023
Layout approvalFile: Plan 2.pdf8 May 2023
Building plan approvalFile: Plan 1.pdf8 May 2023
Building plan approvalFile: Plan 2.pdf8 May 2023
PAN CardFile: Pan Card.pdf8 May 2023
Copy of Layout Approval (in case of layout)File: Plan 1.pdf8 May 2023
Copy of Layout Approval (in case of layout)File: Plan 2.pdf8 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 1.pdf8 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf8 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sai Ganesh - Enggineer Certificate.pdf8 May 2023
CERSAI detailsFile: Shree Vyankatesh Enterprises - Sai Ganesh CERSAI.pdf8 May 2023
Proforma of Agreement for saleFile: Agreement for Sale-Sai Ganesh-RERA.pdf8 May 2023
Other - LegalFile: Shree Vyankatesh Sai Ganesh Non Negotiable Clauses.pdf8 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shree Vyankatesh Architect Certificat.pdf6 May 2023
Deviation Report with respect to Allotment letterFile: Shree Vyankatesh Sai Ganesh Deviation Allotment.pdf6 May 2023
Deviation Report with respect to model copy of AgreementFile: Shree Vyankatesh Sai Ganesh Deviation Report to Agreement.pdf6 May 2023
Copy of the legal title reportFile: Title - Sai Ganesh Society.pdf5 May 2023
Details of encumbrances concerned to FinanceFile: Shree Vyankatesh - No Encumbrance to Finance.pdf5 May 2023
Details of encumbrances concerned to FinanceFile: Shree Vyankatesh - No Encumbrance to Legal.pdf5 May 2023
Details of encumbrances concerned to LegalFile: Shree Vyankatesh - No Encumbrance to Finance.pdf5 May 2023
Details of encumbrances concerned to LegalFile: Shree Vyankatesh - No Encumbrance to Legal.pdf5 May 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf5 May 2023
Declaration about Commencement CertificateFile: Shree Vyankatesh - Declaration CC.pdf5 May 2023
Declaration in FORM BFile: Shree Vyankatesh Milind R Deshmukh Affidavit.pdf5 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Shree Vyankatesh - Disclosure of interest in other real estate organization.pdf5 May 2023
Proforma of Allotment letterFile: Shree Vyankatesh Allotment Letter.pdf5 May 2023

How this compares with Thane

0%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sai Ganesh Co-Operative Housing Society Ltd on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dombivli West7,600+ in Thane

2 kmSai Ganesh Co-Operative Completed 93Lapsed / revoked 81Other 140Dot size: filed unitsN

Filed coordinates, straight-line distance. 314 registered projects within 2 km.

Builder: Shree Vyankatesh Enterprises

Shree Vyankatesh Enterprises has 2 registrations on MahaRERA, including Jai Shree Ganesh Co-Operative Housing Society Limited and Sai Ganesh Co-Operative Housing Society Ltd. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Sai Ganesh Co-Operative Housing Society Ltd is delayed beyond 31 May 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sai Ganesh Co-Operative Housing Society Ltd?

The registered promoter entity is Shree Vyankatesh Enterprises, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sai Ganesh Co-Operative Housing Society Ltd?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sai Ganesh Co-Operative Housing Society Ltd?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sai Ganesh Co-Operative Housing Society Ltd?

The professionals named in the filing: Architect: Rachana Shilp Architect & Interior Designers; Engineer: Rajesh Thakare and associated; Chartered Accountant: Kapure & Kapure chartered accountats; Chartered Accountant: NAVAL KARNIK & CO,. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sai Ganesh Co-Operative Housing Society Ltd?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sai Ganesh Co-Operative Housing Society Ltd. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sai Ganesh Co-Operative Housing Society Ltd to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.