Home / Browse projects / Thane, Maharashtra / SAI DARSHAN

Registered No litigation declared Others project

SAI DARSHAN

By TRIMURTI ENTERPRISES

RG-MH-29919 · RERA P51700029507 · Last updated on MahaRERA portal: 26 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Apr 2027Possession promisedmoved 24 months from the original
27 of 33Construction stages doneacross 3 buildings; furthest along: Basement (if any), 0%
37 of 112Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

SAI DARSHAN is a Others project by TRIMURTI ENTERPRISES in Thane, Maharashtra, registered with MahaRERA as P51700029507 on 4 Jun 2021. Possession is promised by 30 Apr 2027. The completion date has moved by 24 months from the original filing. 75 of the 112 units on this registration are recorded sold or booked, and 27 of 33 construction stages are filed complete.

At a glance

Project

  • NameSAI DARSHAN
  • TypeOthers
  • Location
    • PIMPLAS ROAD
    • KONGAON
    • kon (CT)
    • Bhiwandi
    • Thane
    • 421311
  • Pincode421311
  • RERA no.P51700029507
  • ReraGenie IDRG-MH-29919

Builder

  • NameTRIMURTI ENTERPRISES
  • Entity typePartnership
  • GSTIN27AAIFT9245J1ZL
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersSATYAWAN SITARAM JADHAV, SHARAD NAMDEV LOKHANDE, SUNIL MANGAL KHARUK
  • Other registrations2 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredJun 2021First promiseApr 2025Revised toApr 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Jun 2021
  • Promised completion30 Apr 2027
  • Revised completionRevised to 30 Apr 2027 (originally 30 Apr 2025)
  • Buildings3 building records
  • Documents filed87 files

Current status

67%75 of 112 units booked
100.0%Work done, per cost certificate

Figures as on 26 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA6636541
B WINGNA7735035
C WINGNA6636036

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 26 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

27 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Basement (if any), at 0%.

A WING82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B WING82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C WING82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 26 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,520 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 May 2025
LandownerVillageDistrict
GANESH KALU BHOIRkon (CT)Thane
RAM SOMWAR MUKADAMkon (CT)Thane
BHUSHAN BABURAO PATILMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityMUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
Permissible FSI5696.8
Proposed, not sanctioned2,360 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKALYAN WEST
Estimated costRs 12.42 cr
Cost incurredRs 12.42 cr
Work done100.0%
BuildingWingEstimatedIncurred
A WINGNARs 3.41 crRs 3.41 cr
B WINGNARs 3.41 crRs 3.41 cr
C WINGNARs 3.41 crRs 3.41 cr
-NARs 2.19 crRs 2.19 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVIJAY PANDEY AND ASSOCIATES
EngineerPRAPTI ASSOCIATES
EngineerHRITIK SUNIL KHARUK
Chartered AccountantMAYUR K JAIN AND CO
Chartered AccountantANKIT PARAS JAIN & CO
PartnerRole in project
TRIMURTI ENTERPRISES-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA26052501260Apr 2025 → Apr 2026

Reason as filed by the promoterDear Sir/Madam, We, M/s Trimurti Enterprises ("Trimurti"), and we are writing you with regards to our application for extension of time till 30th April, 2026; 1. As you are aware that the company is engaged in the constructing a real estate project at Kalyan, Maharashtra on its plot of land comprising of 3 Building A wing, B wing and C wing.”. [hereinafter collectively referred to as "the Proiect"). 2. We say that we obtained the Rera registration number P51700029507 on 04-06-2021 for Project SAI DARSHAN at Kon in Bhiwandi, Thane. 3. We would like to inform you that, now at present our project

EA03042620554Apr 2025 → Apr 2027

Reason as filed by the promoterWe, M/s Sai Darshan, ("Trimurti Enterprises"), and we are writing you with regards to our application for extension of time till 30th April, 2027; 1. As you are aware that the company is engaged in the constructing a real estate project at Kalyan, Maharashtra on its plot of land comprising of 3 Wings, A and B wing having 7 floors and C wing having 6 floors.” [hereinafter collectively referred to as "the Project"). 2. We say that we obtained the Rera registration number P51700029507 on 04-06-2021 for Project SAI DARSHAN at Kon in Bhiwandi, Thane. 3. We would like to inform you that, now at pres

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 May 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 May 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Oct 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2027

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: form 5 signed.pdf26 Jun 2026
Withdrawal Update Form 1File: Form 1 31-03-2026.pdf18 May 2026
Withdrawal Update Form 2File: Form 2 31-03-2026.pdf18 May 2026
Withdrawal Update Form 3File: Form 3 31-03-2026 Final.pdf18 May 2026
Form 2A (FY 2024-2025)File: Form-2A FY 2024-25 Signed.pdf7 Apr 2026
Form 5 (FY 2024-2025)File: Form-5 FY 2024-25 Sign.pdf4 Apr 2026
Withdrawal Update Form 1File: form1 31DEC2025.pdf5 Mar 2026
Withdrawal Update Form 2File: Form-2 31-12-2025.pdf5 Mar 2026
Withdrawal Update Form 3File: Form-3-31-12-2025.pdf5 Mar 2026
Withdrawal Update Form 1File: Form-1 30-09-2025 Signed.pdf8 Jan 2026
Withdrawal Update Form 2File: Form-2 30-09-2025 Signed.pdf8 Jan 2026
Withdrawal Update Form 3File: Form-3 30-09-20225 Signed.pdf8 Jan 2026
Withdrawal Update Form 1File: Form-1 30-06-2025.pdf7 Jan 2026
Withdrawal Update Form 2File: Form-2 30-06-2025.pdf7 Jan 2026
Withdrawal Update Form 3File: Form-3 30-06-2025 Signed Q1_organized_compressed.pdf7 Jan 2026
Form 1File: Form-1 31-03-2025 Sign.pdf26 Jun 2025
Form 2File: Form-2 31-03-2025 Sign.pdf26 Jun 2025
Form 3File: Form-3 31-03-2025 Signed.pdf26 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold List 31-03-2025.pdf26 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1 2024_compressed.pdf27 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 2024_compressed.pdf27 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q3 2024_compressed.pdf27 Feb 2025
Disclosure of sold/ booked inventoryFile: 30-6-24_0001.pdf27 Feb 2025
Disclosure of sold/ booked inventoryFile: 30-9-24_0001.pdf27 Feb 2025
Disclosure of sold/ booked inventoryFile: 31-12-24_0001.pdf27 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 30-06-2024.pdf12 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 30-09-2024.pdf12 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 31-12-2024.pdf12 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 31-03-2024.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 30-06-2024.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 30-09-2024.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 31-12-2024.pdf17 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Tirupati Enterprises 31-12-2023_compressed.pdf20 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31-03-2024 Sign Copy.pdf20 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 rera 30-09-2024.pdf16 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 rera 30-09-2024.pdf16 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer's Certificate_0001.pdf5 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 31-03-2024.pdf5 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 30-06-2023_compressed.pdf5 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: fORM-3 30-09-2023_compressed.pdf5 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 30-09-2023.pdf29 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 31-12-2023.pdf29 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sai Darshan Compress Uploaded.pdf7 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Trimurti Enterprises_0001.pdf5 Dec 2023
Disclosure of sold/ booked inventoryFile: sold unsold list for rera.pdf15 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate 30623 compressed.pdf8 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate 300623.pdf22 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf16 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf16 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31122022 Compressed.pdf16 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf2 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf2 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Letter FORM-1.pdf30 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf12 Dec 2022
Disclosure of sold/ booked inventoryFile: Sold And Unsold.pdf12 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: IMG_0348.pdf17 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-.pdf20 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1.pdf29 Oct 2021
Layout approvalFile: 1.pdf25 Oct 2021
Layout approvalFile: 2.pdf25 Oct 2021
Layout approvalFile: 3.pdf25 Oct 2021
Layout approvalFile: 4.pdf25 Oct 2021
Copy of Layout Approval (in case of layout)File: 1.pdf25 Oct 2021
Copy of Layout Approval (in case of layout)File: 2.pdf25 Oct 2021
Copy of Layout Approval (in case of layout)File: 3.pdf25 Oct 2021
Copy of Layout Approval (in case of layout)File: 4.pdf25 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf25 Oct 2021
PAN CardFile: TRIMURTI PAN CARD.pdf24 May 2021
Copy of the legal title reportFile: Title Report.pdf24 May 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-ARCHITECT.pdf24 May 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-Engineer Certificate.pdf24 May 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf24 May 2021
Proforma of Allotment letterFile: Allotment letter.pdf24 May 2021
Proforma of Allotment letterFile: Agreement for sale- Trimurti Enterprises.pdf24 May 2021
Layout approvalFile: MYSCAN_20210305_0001.pdf18 May 2021
Layout approvalFile: MYSCAN_20210305_0004.pdf18 May 2021
Layout approvalFile: MYSCAN_20210305_0005.pdf18 May 2021
Layout approvalFile: MYSCAN_20210305_0006.pdf18 May 2021
Building plan approvalFile: COMMENCEMENT CERTIFICATE UP TO PLINTH.pdf18 May 2021
Details of encumbrancesFile: SELF DECLARATION REGAUARDING NO ENCUMBRANCES .pdf18 May 2021

How this compares with Thane

67%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 24 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI DARSHAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KONGAON7,600+ in Thane

Builder: TRIMURTI ENTERPRISES

TRIMURTI ENTERPRISES has 3 registrations on MahaRERA, including SAI DARSHAN and POONAM CO-OPERATIVE HSG SOCIETY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SAI DARSHAN is delayed beyond 30 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI DARSHAN?

The registered promoter entity is TRIMURTI ENTERPRISES, a partnership as per the filing. Its GSTIN 27AAIFT9245J1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI DARSHAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAI DARSHAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI DARSHAN?

The professionals named in the filing: Architect: VIJAY PANDEY AND ASSOCIATES; Engineer: PRAPTI ASSOCIATES; Engineer: HRITIK SUNIL KHARUK; Chartered Accountant: MAYUR K JAIN AND CO; Chartered Accountant: ANKIT PARAS JAIN & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI DARSHAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI DARSHAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI DARSHAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.