Home / Browse projects / Thane, Maharashtra / ATLANTIC

Registered No litigation declared Others project

ATLANTIC

By RIDDHI SIDDHI ENTERPRISES

RG-MH-68210 · RERA P51700034411 · Last updated on MahaRERA portal: 19 Sep 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
10 of 44Construction stages doneacross 4 buildings; furthest along: Slabs of Super Structure, 94%
251 of 377Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 97 documents Report an error

ATLANTIC is a Others project by RIDDHI SIDDHI ENTERPRISES in Thane, Maharashtra, registered with MahaRERA as P51700034411 on 5 Apr 2022. Possession is promised by 31 Mar 2027. 126 of the 377 units on this registration are recorded sold or booked, and 10 of 44 construction stages are filed complete.

At a glance

Project

  • NameATLANTIC
  • TypeOthers
  • Location
    • Kalyan Bhiwandi Road
    • BHIWANDI
    • kon (CT)
    • Thane
    • 421311
  • Pincode421311
  • RERA no.P51700034411
  • ReraGenie IDRG-MH-68210

Builder

  • NameRIDDHI SIDDHI ENTERPRISES
  • Entity typePartnership
  • GSTIN27AAUFR8058F1ZJ
  • PartnersSANJAY KANJI BHANUSHALI, PREMJI LADHARAM BHANUSHALI
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredApr 2022PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Apr 2022
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings4 building records
  • Documents filed97 files

Current status

33%126 of 377 units booked
20.1%Work done, per cost certificate

Figures as on 19 Sep 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TYPE A WING ANA1414044
TYPE A WING BNA14141050105
TYPE BNA14141000100
TYPE CNA15151680168

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 19 Sep 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Slabs of Super Structure, at 94%.

TYPE A WING A63%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks12%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.82%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%
TYPE A WING B46%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor60%
Slabs of Super Structure84%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises19%
Sanitary Fittings within the flats / premises7%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks36%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE B49%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor60%
Slabs of Super Structure94%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises27%
Sanitary Fittings within the flats / premises12%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks42%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 19 Sep 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed4

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots4
Closed/Covered4
BuildingClosed/CoveredTotal
TYPE A WING A11
TYPE A WING B11
TYPE B11
TYPE C11

Land and ownership9

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area6,150 sq m
Land owned byThe promoter, with other names on the file
Named landowners9
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Sep 2024
LandownerVillageDistrict
NARESH M SABHANDASANIUlhasnagar (M Corp.)Thane
DEEPAK H MODIUlhasnagar (M Corp.)Thane
SHASHI TILAKRAJ MAGANAndheriMumbai Suburban
LAJWANTI M ROHRAUlhasnagar (M Corp.)Thane
RAJESH M ROHRAUlhasnagar (M Corp.)Thane
SUSHIL M ROHRAUlhasnagar (M Corp.)Thane
SNEH G MEHTANIKalyanThane
VIJAY J RACHKurlaMumbai Suburban
GOVINDRAM H MEHTANIKalyanThane

Approvals and building plan

Sanctioning authorityMumbai metropolution Region Development Authority
Permissible FSI18651.61
Proposed, not sanctioned13,227 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 101 and 102, First Floor, Shri Pragati Royal Atmaram Nagar Complex, Kalyan-Bhiwandi Road, Kon, Tal Bhiwandi Dist Thane 421311
Estimated costRs 64.54 cr
Cost incurredRs 12.98 cr
Work done20.11%
BuildingWingEstimatedIncurred
TYPE CNARs 24.17 cr-
TYPE A WING BNARs 16.93 crRs 5.59 cr
TYPE BNARs 16.48 crRs 5.93 cr
-NARs 4.87 cr-
TYPE A WING ANARs 2.09 crRs 1.46 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDurraj Shamim Kamankar
ArchitectShashi Deshmukh
EngineerDurraj Shamim Kamankar
EngineerAjay Mahale
Chartered AccountantSwapnesh & Vinit Chartered Accountants
PartnerRole in project
RIDDHI SIDDHI ENTERPRISES-

Litigation declared1

CaseCourtStatus
250/2021CIVIL COURTPENDING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed97

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 97 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: 4_Form-1 Architect Certificate Q4 -FY-2024-25.pdf19 Sep 2025
Form 2File: 4_Form-2 Engineer Certificate Q4 FY 2024-25.pdf19 Sep 2025
Form 3File: Form-3 Q4.pdf19 Sep 2025
Disclosure of Sold and Booked InventoryFile: 4_Desclosure of Sold -Q4-31-03-2025 (1).pdf19 Sep 2025
Withdrawal Update Form 1File: 1_Form 1- Architect Certificate Q1 FY-2025-26.pdf19 Sep 2025
Withdrawal Update Form 2File: 1_Form-2 Q1-FY-2025-26.pdf19 Sep 2025
Withdrawal Update Form 3File: Form-3 Q1.pdf19 Sep 2025
Form 1File: 3_Q3 31-12-2024 - Signed.pdf24 Aug 2025
Form 2File: 3_Form 2-31-12-2024 - Signed.pdf24 Aug 2025
Form 3File: Form 3 - Q3 of FY 2024-25 - 10-March-2025.pdf24 Aug 2025
Disclosure of Sold and Booked InventoryFile: 3_Disclosure of Sold-Q3-31-Dec-2024.pdf24 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3_Q3 31-12-2024 - Signed.pdf10 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Q3 of FY 2024-25 - 10-March-2025.pdf10 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3_Form 2-31-12-2024 - Signed.pdf10 Mar 2025
Disclosure of sold/ booked inventoryFile: 3_Disclosure of Sold-Q3-31-Dec-2024.pdf10 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 1_Form 2A - FY 2022-23 - 31-03-2023.pdf10 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- 31-03-2023.pdf10 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2_Revised Form 3 - Q2 - 30 Sep 2024.pdf20 Feb 2025
Disclosure of sold/ booked inventoryFile: Q2 2024 -Inventory (1).pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1_Revised Form 3- Q2 - 30 Sep 2024.pdf17 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised Form 3- Signed.pdf29 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2_Q2 30-09-2024 - Signed.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Signed.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Signed-revised.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Form 2 30-09-2024 - Signed.pdf6 Nov 2024
Disclosure of sold/ booked inventoryFile: Q4 2024 -Inventory-Signed.pdf6 Nov 2024
Disclosure of sold/ booked inventoryFile: Q2 2024 -Inventory-signed.pdf6 Nov 2024
Disclosure of sold/ booked inventoryFile: Q1 2024 -Inventory-signed.pdf6 Nov 2024
Disclosure of sold/ booked inventoryFile: Q3 2023 -Inventory_Signed.pdf6 Nov 2024
Disclosure of sold/ booked inventoryFile: Q2 2023 -Inventory_Signed.pdf6 Nov 2024
Disclosure of sold/ booked inventoryFile: Q1 2023 -Inventory-Signed.pdf6 Nov 2024
Disclosure of sold/ booked inventoryFile: Q2 2023 -Inventory-Signed.pdf6 Nov 2024
Disclosure of sold/ booked inventoryFile: Q1 2023 -Inventory-Signed.pdf6 Nov 2024
Building plan approvalFile: C2 Floor plan.pdf10 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: C1 (CC)_compressed.pdf10 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: C2 Floor plan.pdf10 Oct 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: 1_Format A - Declaration about RERA Designated Bank Accounts.pdf10 Oct 2024
Deviation Report with respect to Allotment letterFile: Deviation Report - Allotment letter.pdf10 Oct 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report - Agreement for Sale.pdf10 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf10 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: 23-24 Form 5-Signed.pdf10 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 2_Format B - Opening of RERA Designated Bank Accounts.pdf10 Oct 2024
Details of encumbrances concerned to FinanceFile: Encumbrance - Legal and Finance.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Form 1 30-06-2023 - Signed.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2_Form 1 30-09-2023 - Signed.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3_Form 1 31-12-2023 - Signed.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4_Form 1 31-03-2024 - Signed.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1_Form 1 30-06-2024 - Signed.pdf8 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q3 FY 23-24 Signed.pdf8 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q1 FY 24-25 Signed.pdf8 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q4 FY 23-24 Signed.pdf8 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q2 FY 23-24 Signed.pdf8 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q1 FY 23-24 Signed.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1_Form 2 30-06-2024 - Signed.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4_Form 2 31-03-2024 - Signed.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2_Form 2 30-09-2023 - Signed.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1_Form 2 30-06-2023 - Signed.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3_Form 2 31-12-2023 - Signed.pdf8 Oct 2024
Details of encumbrances concerned to LegalFile: Encumbrance - Legal and Finance.pdf8 Oct 2024
Proforma of Agreement for saleFile: Proforma Agreement for Sale.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 march revised (1).pdf28 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 april revised (1).pdf28 Sep 2023
Layout approvalFile: 1 Copy of Layout Approval (in case of layout) (5).pdf15 Mar 2022
Layout approvalFile: 2 Copy of Layout Approval (in case of layout) (1).pdf15 Mar 2022
Layout approvalFile: 3 Copy of Layout Approval (in case of layout).pdf15 Mar 2022
Layout approvalFile: 4 Copy of Layout Approval (in case of layout).pdf15 Mar 2022
Layout approvalFile: 5 Copy of Layout Approval (in case of layout).pdf15 Mar 2022
Layout approvalFile: 6 Copy of Layout Approval (in case of layout).pdf15 Mar 2022
Building plan approvalFile: 1 Copy of Layout Approval (in case of layout) (5).pdf15 Mar 2022
Building plan approvalFile: 2 Copy of Layout Approval (in case of layout) (1).pdf15 Mar 2022
Building plan approvalFile: 3 Copy of Layout Approval (in case of layout).pdf15 Mar 2022
Building plan approvalFile: 4 Copy of Layout Approval (in case of layout).pdf15 Mar 2022
Building plan approvalFile: 5 Copy of Layout Approval (in case of layout).pdf15 Mar 2022
Building plan approvalFile: 6 Copy of Layout Approval (in case of layout).pdf15 Mar 2022
PAN CardFile: 1 PAN Card (5).pdf15 Mar 2022
Copy of the legal title reportFile: 1 Copy of the legal title report (15).pdf15 Mar 2022
Details of encumbrancesFile: 1 Details of encumbrances (1).pdf15 Mar 2022
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout) (5).pdf15 Mar 2022
Copy of Layout Approval (in case of layout)File: 2 Copy of Layout Approval (in case of layout) (1).pdf15 Mar 2022
Copy of Layout Approval (in case of layout)File: 3 Copy of Layout Approval (in case of layout).pdf15 Mar 2022

How this compares with Thane

33%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ATLANTIC on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHIWANDI7,600+ in Thane

Builder: RIDDHI SIDDHI ENTERPRISES

Riddhi Siddhi Enterprises has 3 registrations on MahaRERA, including OM RISHIKESH CHS Ltd and Shyam Darshan Residency. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if ATLANTIC is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ATLANTIC?

The registered promoter entity is RIDDHI SIDDHI ENTERPRISES, a partnership as per the filing. Its GSTIN 27AAUFR8058F1ZJ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ATLANTIC?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ATLANTIC?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ATLANTIC?

The professionals named in the filing: Architect: Durraj Shamim Kamankar; Architect: Shashi Deshmukh; Engineer: Durraj Shamim Kamankar; Engineer: Ajay Mahale; Chartered Accountant: Swapnesh & Vinit Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ATLANTIC?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ATLANTIC. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ATLANTIC to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.