SAI ANANTA

By SHREE VENKATESHWARA GROUP

RG-MH-36053 · RERA PR1260002502966 · Last updated on MahaRERA portal: 8 Aug 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 completed earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2032Possession promisedmoved 4 months from the original
3 of 33Construction stages doneacross 3 buildings; furthest along: Basement (if any), 0%
165 of 165Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 18 documents Report an error

SAI ANANTA is a Residential / Group Housing project by SHREE VENKATESHWARA GROUP in Pune, Maharashtra, registered with MahaRERA as PR1260002502966 on 18 Mar 2026. Possession is promised by 30 Apr 2032. The completion date has moved by 4 months from the original filing. 0 of the 165 units on this registration are recorded sold or booked, and 3 of 33 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSAI ANANTA
  • TypeResidential / Group Housing
  • Location
    • WADMUKHWADI
    • Haveli
    • Pune
    • 412203
  • Pincode412203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1260002502966
  • ReraGenie IDRG-MH-36053

Builder

  • NameSHREE VENKATESHWARA GROUP
  • Entity typePartnership
  • GSTIN27AFFFS5766P1Z1
  • PartnersSHARAD PANDURANG DIGHE, TANAJI DAMODAR WAGHOLE
  • Other registrations1 more →
  • Declared earlier projects3 →

Key dates

this monthRegisteredMar 2026First promiseDec 2031Revised toApr 2032

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Mar 2026
  • Promised completion30 Apr 2032
  • Revised completionRevised to 30 Apr 2032 (originally 31 Dec 2031)
  • Buildings3 building records
  • Documents filed18 files

Current status

0%0 of 165 units booked
0.0%Work done, per cost certificate

Figures as on 8 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BUILDINGNA40000
B BUILDING NA8420020
C BUILDINGNA33291450145

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 8 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Basement (if any), at 0%.

A BUILDING9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B BUILDING9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C BUILDING9%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNo0%
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed79

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots79
Closed/Covered79
BuildingClosed/CoveredTotal
A BUILDING2626
B BUILDING2626
C BUILDING2727

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area13,400 sq m
Land owned byNot the promoter
Named landowners5
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Feb 2026
LandownerVillageDistrict
KISAN ANANDRAO SHINDE-Pune
ASHA KISANRAO SHINDE-Pune
JALINDAR KISANRAO SHINDE-Pune
BHARAT KISANRAO SHINDE-Pune
SHARAD KISANRAO SHINDE-Pune

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNICIPAL CORPORATION
Permissible FSI17928.58
Proposed, not sanctioned17,929 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHINDE GRAND SURVEY NO.690,SHEETAL BAUG SOCIETY,OPP.TULJABHAVANI TEMPLE,PUNE NASIK HIGHWAY,BHOSARI,TAL.HAVELI.411039
Estimated costRs 5.36 cr
Cost incurredRs 12,650
Work done0.02%
BuildingWingEstimatedIncurred
C BUILDINGNARs 2.79 crRs 6,592
B BUILDINGNARs 2.03 crRs 4,793
-NARs 53.62 lakhRs 1,265

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectUNUSUAL SPACES
EngineerCONSTROTECHNICS
Chartered AccountantANUPAMA SHETTY
Chartered AccountantSheetal Jindal And Company
PartnerRole in project
SHREE VENKATESHWARA GROUP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

PR1260002502966/WarDec 2031 → Apr 2032

Reason as filed by the promoterNA

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600632Ram GawaliSHREE VENKATESHWARA GROUP15/09/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Aug 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Aug 2026
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2032

Documents filed18

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: 1 Layout.pdf8 Aug 2026
Building plan approvalFile: 2-3 -Parking.pdf8 Aug 2026
Building plan approvalFile: 4-7.pdf8 Aug 2026
Form 2A (FY 2025-2026)File: form 2A FY 25-26.pdf8 Aug 2026
Form 5 (FY 2025-2026)File: Form 5 FY 25-26 signed.pdf8 Aug 2026
Withdrawal Update Form 1File: FORM-1_SAI ANANTA.pdf17 Jul 2026
Withdrawal Update Form 2File: FORM-2_SAI ANANTA sign.pdf17 Jul 2026
Withdrawal Update Form 3File: Form-3 jun_26 Sai Ananta sign.pdf17 Jul 2026
Withdrawal Update Form 1File: FORM1_SAI ANANTA Sign Mar_26.pdf22 Apr 2026
Withdrawal Update Form 2File: FORM2_SAI ANANTA Mar_26.pdf22 Apr 2026
Withdrawal Update Form 3File: FORM3_SAI ANANTA Sign.pdf22 Apr 2026
Building plan approvalFile: 4 B Wing Floor Plan (1)_compressed.pdf17 Mar 2026
Declaration and undertaking (Annexure A)File: ANNEXURE A_page-0001.pdf2 Mar 2026
Layout approvalFile: Plan1_compressed.pdf10 Feb 2026
Building plan approvalFile: Plan_compressed.pdf10 Feb 2026
Building plan approvalFile: Plan2_compressed.pdf10 Feb 2026
Building plan approvalFile: Plan3_compressed.pdf10 Feb 2026
Building plan approvalFile: Plan4_compressed.pdf10 Feb 2026

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise2 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
WAKAD CENTRAL PARKP52100079655WAKAD, Pune15Mar 2025Certificate SignedDec 2027Not due yet
Tulsi KunjP52100080357Dehu, Pune42May 2025OngoingDec 2026Not due yet
Snehal ApartmentP52100054909Pune, Pune28Feb 2024CompletedSep 2025Sep 2025

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 4 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAI ANANTA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wadmukhwadi13,700+ in Pune

2 kmSAI ANANTACompleted 28Lapsed / revoked 15Other 68Dot size: filed unitsN

Filed coordinates, straight-line distance. 111 registered projects within 2 km.

Builder: SHREE VENKATESHWARA GROUP

SHREE VENKATESHWARA GROUP has 2 registrations on MahaRERA, including WAKAD CENTRAL PARK and SAI ANANTA. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SAI ANANTA is delayed beyond 30 Apr 2032?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAI ANANTA?

The registered promoter entity is SHREE VENKATESHWARA GROUP, a partnership as per the filing. Its GSTIN 27AFFFS5766P1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAI ANANTA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SAI ANANTA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SAI ANANTA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAI ANANTA?

The professionals named in the filing: Architect: UNUSUAL SPACES; Engineer: CONSTROTECHNICS; Chartered Accountant: ANUPAMA SHETTY; Chartered Accountant: Sheetal Jindal And Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAI ANANTA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAI ANANTA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAI ANANTA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.