ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / LONKAR RESIDENCY

Registered No litigation declared Residential / Group Housing project

LONKAR RESIDENCY

By ROHINI RAJENDRA LONKAR

RG-MH-35298 · RERA P52100049495 · Last updated on MahaRERA portal: 21 May 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 60%
10 of 15Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

LONKAR RESIDENCY is a Residential / Group Housing project by ROHINI RAJENDRA LONKAR in Pune, Maharashtra, registered with MahaRERA as P52100049495 on 15 Feb 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 5 of the 15 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameLONKAR RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • Shirur Satara Road
    • Boripardhi
    • Daund
    • Pune
    • 412203
  • Pincode412203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100049495
  • ReraGenie IDRG-MH-35298

Builder

  • NameROHINI RAJENDRA LONKAR
  • Entity typeIndividual

Key dates

this monthRegisteredFeb 2023First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Feb 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed95 files

Current status

33%5 of 15 units booked
49.0%Work done, per cost certificate

Figures as on 21 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
LONKAR RESIDENCYNA5315015

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 60%.

LONKAR RESIDENCY: 47% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks58%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Open Space1

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area618 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Dec 2025

Approvals and building plan

Sanctioning authorityPune Metropolitan Regional Development Authority (PMRDA)
Permissible FSI538.95
Proposed, not sanctioned539 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNimbalkar Apt, Kedgaon Station, Daund Pune 412203
Estimated costRs 3.57 cr
Cost incurredRs 1.75 cr
Work done49.0%
BuildingWingEstimatedIncurred
LONKAR RESIDENCYNARs 1.79 crRs 71.42 lakh
-NARs 1.79 crRs 1.04 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA G KOSHTI AND ASSOCIATES
EngineerDR AMIN SHEIKH
EngineerDHANAJI S SHELKE
Chartered AccountantKTP AND ASSOCIATES
Chartered AccountantMonika N Shinde & Associates
PartnerRole in project
ROHINI RAJENDRA LONKAR-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA29042620770Dec 2025 → Dec 2026

Reason as filed by the promoterThe project was originally registered based on the Commencement Certificate, with a declared completion date of 31/12/2025. The promoter has infused her owned fund for the development of the project and also availed project finance from the bank as secured loan facility and constructed the Building and completed the slab structure of the said Building Lonkar Residency. However, the project was also dependent on customer advances to complete the construction of the project, the lower-than-expected conversion of bookings into sales resulted into a financial constraint, affecting the pace of cons

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 24 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1.pdf21 May 2026
Withdrawal Update Form 2File: form 2.pdf21 May 2026
Withdrawal Update Form 3File: form 3.pdf21 May 2026
Withdrawal Update Form 1File: from 1.pdf10 Apr 2026
Withdrawal Update Form 2File: from 2 (see regulation 3).pdf10 Apr 2026
Withdrawal Update Form 3File: from 3.pdf10 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A.pdf10 Apr 2026
Form 2A (FY 2022-2023)File: Form 2A.pdf28 Dec 2025
Form 2A (FY 2023-2024)File: Form 2A 2024.pdf28 Dec 2025
Form 2A (FY 2024-2025)File: Form 2A March 2025.pdf28 Dec 2025
Form 1File: Form 1.pdf26 Dec 2025
Form 2File: Form 2.pdf26 Dec 2025
Form 3File: Form 3.pdf26 Dec 2025
Disclosure of Sold and Booked InventoryFile: Unsold Inventory.pdf26 Dec 2025
Form 1File: Form 1.pdf26 Dec 2025
Form 2File: Form 2.pdf26 Dec 2025
Form 3File: Form 3.pdf26 Dec 2025
Disclosure of Sold and Booked InventoryFile: Unsold Inventory.pdf26 Dec 2025
Form 1File: Form 1 Sept 23.pdf26 Dec 2025
Form 2File: Form 2 Sept 23.pdf26 Dec 2025
Form 3File: Form 3 Sept 23.pdf26 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory Sept 23.pdf26 Dec 2025
Form 1File: Form 1 Dec 23.pdf26 Dec 2025
Form 2File: Form 2 Dec 23.pdf26 Dec 2025
Form 3File: Form 3 Dec 23.pdf26 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory Dec 23.pdf26 Dec 2025
Form 1File: Form 1 March 24.pdf26 Dec 2025
Form 2File: Form 2 March 2024.pdf26 Dec 2025
Form 3File: Form 3 March 24.pdf26 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory March 24.pdf26 Dec 2025
Form 1File: Form 1 March 24.pdf26 Dec 2025
Form 3File: Form 3 March 24.pdf26 Dec 2025
Form 2File: Form 2 June 24.pdf26 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory June 24.pdf26 Dec 2025
Form 1File: Form 1 Sept 24.pdf26 Dec 2025
Form 3File: Form 3 Sept 24.pdf26 Dec 2025
Form 2File: Form 2 Sept 24.pdf26 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory Sept 24.pdf26 Dec 2025
Form 1File: Form 1 Dec 24.pdf26 Dec 2025
Form 3File: Form 3 Dec 24.pdf26 Dec 2025
Form 2File: Form 2 Dec 24.pdf26 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory Dec 24.pdf26 Dec 2025
Form 1File: Form 1 March 25.pdf26 Dec 2025
Form 2File: Form 2 March 25.pdf26 Dec 2025
Form 3File: Form 3 March 25.pdf26 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory March 25.pdf26 Dec 2025
Form 1File: Form 1 June 25.pdf26 Dec 2025
Form 2File: Form 2 June 25.pdf26 Dec 2025
Form 3File: Form 3 June 25.pdf26 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory June 25.pdf26 Dec 2025
Form 1File: Form 1 Sept 25.pdf26 Dec 2025
Form 2File: Form 2 Sept 25.pdf26 Dec 2025
Form 3File: Form 3 Sept 25.pdf26 Dec 2025
Disclosure of Sold and Booked InventoryFile: Inventory Sept 25.pdf26 Dec 2025
Form 5 (FY 2022-2023)File: Form 5 March 2023.pdf26 Dec 2025
Form 5 (FY 2023-2024)File: Form 5 March 2024.pdf26 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 March 2025.pdf26 Dec 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf9 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf9 Sep 2023
Disclosure of sold/ booked inventoryFile: Unsold Inventory.pdf9 Sep 2023
Disclosure of sold/ booked inventoryFile: Unsold Inventory.pdf9 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf31 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf31 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf31 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf31 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf31 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf31 Aug 2023
CERSAI detailsFile: Undertaking.pdf10 Feb 2023
CERSAI detailsFile: CERSAI.pdf10 Feb 2023
CERSAI detailsFile: CERSAI 2.pdf10 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf10 Feb 2023
Details of encumbrances concerned to FinanceFile: Financial NO Encumbrance.pdf3 Feb 2023
Details of encumbrances concerned to LegalFile: Financial NO Encumbrance.pdf3 Feb 2023
Copy of the legal title reportFile: Legal title Report.pdf31 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.pdf31 Jan 2023
Proforma of Allotment letterFile: Allotment Letter.pdf31 Jan 2023
Deviation Report with respect to Allotment letterFile: No Deviation Allotment.pdf31 Jan 2023
Other - LegalFile: Search Report.pdf25 Jan 2023
Other - LegalFile: Sale Deed-pages-1-11.pdf25 Jan 2023
Other - LegalFile: Sale Deed-pages-12-22.pdf25 Jan 2023

How this compares with Pune

33%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep LONKAR RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Boripardhi13,700+ in Pune

Builder: ROHINI RAJENDRA LONKAR

ROHINI RAJENDRA LONKAR has 1 registration on MahaRERA, including LONKAR RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if LONKAR RESIDENCY is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of LONKAR RESIDENCY?

The registered promoter entity is ROHINI RAJENDRA LONKAR, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in LONKAR RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for LONKAR RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at LONKAR RESIDENCY?

The professionals named in the filing: Architect: A G KOSHTI AND ASSOCIATES; Engineer: DR AMIN SHEIKH; Engineer: DHANAJI S SHELKE; Chartered Accountant: KTP AND ASSOCIATES; Chartered Accountant: Monika N Shinde & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in LONKAR RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About LONKAR RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save LONKAR RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.