Home / Browse projects / Pune, Maharashtra / WAKAD CENTRAL PARK

Registered No litigation declared Others project

WAKAD CENTRAL PARK

By SHREE VENKATESHWARA GROUP

RG-MH-31321 · RERA P52100079655 · Last updated on MahaRERA portal: 22 Apr 2026

Source: official MahaRERA filing

Red flags

  • Rs 30.00 crore secured on the land, in favour of CAPRI GLOBAL HOUSING FINANCE LTD

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
1 of 11Construction stages donefurthest along: Basement (if any), 70%
108 of 108Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 61 documents Report an error

WAKAD CENTRAL PARK is a Others project by SHREE VENKATESHWARA GROUP in Pune, Maharashtra, registered with MahaRERA as P52100079655 on 18 Mar 2025. Possession is promised by 31 Dec 2027. 0 of the 108 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameWAKAD CENTRAL PARK
  • TypeOthers
  • Location
    • WAKAD
    • Mulshi
    • Pune
    • 411057
  • Pincode411057
  • RERA no.P52100079655
  • ReraGenie IDRG-MH-31321

Builder

  • NameSHREE VENKATESHWARA GROUP
  • Entity typePartnership
  • PartnerSHARAD DIGHE
  • Other registrations1 more →
  • Declared earlier projects3 →

Key dates

this monthRegisteredMar 2025PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Mar 2025
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed61 files

Current status

0%0 of 108 units booked
10.9%Work done, per cost certificate

Figures as on 22 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA16143375108

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 70%.

BUILDING A: 15% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)70%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed430

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots430
Closed/Covered430

Land and ownership17

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area3,600 sq m
Land owned byNot the promoter
Named landowners17
Encumbrance on the landDeclared present
Charge in favour ofCAPRI GLOBAL HOUSING FINANCE LTD
Secured amountRs 30.00 crore
Declared on27 Apr 2026
LandownerVillageDistrict
BEBIBAI GANPAT SHEDAGEWakadPune
VITTHAL GANPAT SHEDAGEWakadPune
SUSHIL VITTHAL SHEDAGEWakadPune
ASHISH VITTHAL SHEDAGEWakadPune
UMESH GANPAT SHEDAGEWakadPune
SUJATA UMESH SHEDAGEWakadPune
BHAGWAN JAYRAM SHEDAGEWakadPune
RAVINDRA BHAGWAN SHEDAGEWakadPune
SWAPNALI RAVINDRA SHEDAGEWakadPune
JALINDAR BHAGWAN SHEDAGEWakadPune
SEEMA JALINDAR SHEDAGEWakadPune
NAVNATH BHAGWAN SHEDAGEWakadPune
ARATI NAVNATH SHEDAGEWakadPune
TANAJI SHIVAJI SHEDAGEWakadPune
UJWALA TANAJI SHEDAGEWakadPune
ATIL TANAJI SHEDAGEWakadPune
RAKESH TANAJI SHEDAGEWakadPune

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNCIPAL CORPORATION
Permissible FSI11500.67
Proposed, not sanctioned11,501 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR & FIRST FLOOR ASTRAL COURT, 'B' BLDG., SURVEY NO. 137 & 138 GAIKWAD NAGAR, AUNDH, PUNE 411007
Estimated costRs 70.00 cr
Cost incurredRs 7.62 cr
Work done10.89%
BuildingWingEstimatedIncurred
BUILDING ANARs 63.00 crRs 6.86 cr
-NARs 7.00 crRs 76.21 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSACHIN LADKAT AND ASSOCIATE
EngineerCONSTROTECHNICS
Chartered AccountantNAVDEEP JINDAL AND ASSOCIATES
Chartered AccountantCA Dolly Gandhi
PartnerRole in project
SHREE VENKATESHWARA GROUP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Mar 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Mar 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed61

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM1_WAKAD CENTRAL PARK.pdf22 Apr 2026
Withdrawal Update Form 2File: FORM2_WAKAD CENTRAL PARK.pdf22 Apr 2026
Withdrawal Update Form 3File: FORM3_WAKAD CENTRAL PARK.pdf22 Apr 2026
Withdrawal Update Form 1File: FORM-1_SVG.pdf13 Apr 2026
Withdrawal Update Form 2File: FORM-2_SVG.pdf13 Apr 2026
Withdrawal Update Form 3File: FORM-3_SVG.pdf13 Apr 2026
Layout approvalFile: 1 Layout.pdf16 Mar 2026
Building plan approvalFile: 2-6.pdf16 Mar 2026
Building plan approvalFile: 7-15.pdf16 Mar 2026
Withdrawal Update Form 1File: FORM-1_SVG.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM-2_SVG.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM-3_SVG.pdf20 Jan 2026
Withdrawal Update Form 1File: Form - 1.pdf7 Nov 2025
Withdrawal Update Form 2File: Form - 2.pdf7 Nov 2025
Withdrawal Update Form 3File: Form - 3.pdf7 Nov 2025
Withdrawal Update Form 1File: FORM-1.pdf19 Jul 2025
Withdrawal Update Form 2File: FORM-2.pdf19 Jul 2025
Withdrawal Update Form 3File: FORM-3.pdf19 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revised - Form 3 final.pdf13 Mar 2025
Other - FinanceFile: Landowner Declaration NEW.pdf13 Mar 2025
Other - LegalFile: DA wakad central plaza - converted (1).pdf11 Mar 2025
Other - LegalFile: Revised - Form 3 final.pdf11 Mar 2025
Other - LegalFile: Landowner Declaration NEW.pdf11 Mar 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)_p22 Feb 2025
Other - LegalFile: 5.pdf10 Feb 2025
Details of encumbrances concerned to FinanceFile: Details of Encumbrances Concerned to Finance.pdf15 Jan 2025
Details of encumbrances concerned to LegalFile: Details of Encumbrances Concerned to Finance.pdf15 Jan 2025
Copy of the legal title reportFile: search report.pdf6 Jan 2025
Proforma of Allotment letterFile: OrderNo60 (2).pdf6 Jan 2025
Deviation Report with respect to Allotment letterFile: deviation report - allotment.pdf6 Jan 2025
Deviation Report with respect to model copy of AgreementFile: deviation report - ats.pdf6 Jan 2025
Proforma of Agreement for saleFile: OrderNo60 (1).pdf6 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: ilovepdf_merged (1).pdf6 Jan 2025
Layout approvalFile: 1.pdf26 Dec 2024
Building plan approvalFile: scan000000411.pdf26 Dec 2024
Building plan approvalFile: scan000000413.pdf26 Dec 2024
Building plan approvalFile: scan000000414.pdf26 Dec 2024
Building plan approvalFile: scan000000415.pdf26 Dec 2024
Building plan approvalFile: scan000000416.pdf26 Dec 2024
Building plan approvalFile: scan000000417.pdf26 Dec 2024
Building plan approvalFile: scan000000418.pdf26 Dec 2024
Details of encumbrances concerned to FinanceFile: EC - finance_merged.pdf26 Dec 2024
Copy of Layout Approval (in case of layout)File: 1.pdf26 Dec 2024
Declaration in FORM BFile: form b - promoter_compressed.pdf26 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_page-0001.pdf26 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf26 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf26 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: scan000000418.pdf26 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: scan000000417.pdf26 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: scan000000416.pdf26 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: scan000000414.pdf26 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: scan000000413.pdf26 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: scan000000411.pdf26 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: scan000000415.pdf26 Dec 2024
Declaration about Commencement CertificateFile: declaration of cc.pdf26 Dec 2024
CERSAI detailsFile: CERSAI.pdf26 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Specimen format of Declaration-Cum-Undertaking.pdf26 Dec 2024
Details of encumbrances concerned to LegalFile: EC - finance_merged.pdf26 Dec 2024
Other - TechnicalFile: NEW DECLARATION AS PER ORDER 50.pdf26 Dec 2024
Disclosure for secured/unsecured finance availed for the projectFile: DISCLOSURE FOR SECUREDUNSECURED FINANCE AVAILED FOR THE PROJECT.pdf26 Dec 2024
PAN CardFile: PAN Card of Firm.pdf30 Nov 2024

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep WAKAD CENTRAL PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WAKAD13,700+ in Pune

Builder: SHREE VENKATESHWARA GROUP

SHREE VENKATESHWARA GROUP has 2 registrations on MahaRERA, including WAKAD CENTRAL PARK and SAI ANANTA. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if WAKAD CENTRAL PARK is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of WAKAD CENTRAL PARK?

The registered promoter entity is SHREE VENKATESHWARA GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in WAKAD CENTRAL PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for WAKAD CENTRAL PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at WAKAD CENTRAL PARK?

The professionals named in the filing: Architect: SACHIN LADKAT AND ASSOCIATE; Engineer: CONSTROTECHNICS; Chartered Accountant: NAVDEEP JINDAL AND ASSOCIATES; Chartered Accountant: CA Dolly Gandhi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in WAKAD CENTRAL PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About WAKAD CENTRAL PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save WAKAD CENTRAL PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.