SAHIL HEIGHTS A1

By VAISHNAVI PROMOTERS AND DEVELOPERS

RG-MH-83455 · RERA P52100054948 · Last updated on MahaRERA portal: 26 Aug 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 9 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 92%
57 of 71Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

SAHIL HEIGHTS A1 is a Others project by VAISHNAVI PROMOTERS AND DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100054948 on 21 Feb 2024. Possession is promised by 31 Dec 2027. 14 of the 71 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameSAHIL HEIGHTS A1
  • TypeOthers
  • Location
    • PIMPLE NILAKH
    • Haveli
    • Pune
    • 411027
  • Pincode411027
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054948
  • ReraGenie IDRG-MH-83455

Builder

  • NameVAISHNAVI PROMOTERS AND DEVELOPERS
  • Entity typePartnership
  • PartnersSANDEEP VITTHAL KATE, SANTOSH VITTHAL KATE, NILESH VITTHAL KATE
  • Other registrations9 more →
  • Completed3 of 10
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredFeb 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Feb 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed79 files

Current status

20%14 of 71 units booked
70.9%Work done, per cost certificate

Figures as on 26 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAHIL HEIGHTS A1NA1111512071

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 92%.

SAHIL HEIGHTS A1: 59% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure92%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises52%
Sanitary Fittings within the flats / premises18%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks75%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.53%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%

Progress on shared amenities15

As on 26 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed149

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots149
Closed/Covered47
Open Space102

Land and ownership39

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,397 sq m
Land owned byNot the promoter
Named landowners39
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on19 Jul 2025
LandownerVillageDistrict
PRABHAKAR SITARAM DHOREPimple NilakhPune
ANKUSH SITARAM DHOREPimple NilakhPune
KUSUM BHAGWANTRAO KATEPimple NilakhPune
NANDA ASHOKRAO SASTEPimple NilakhPune
GOPICHAND BABURAO DHOREPimple NilakhPune
MACHINDRA BABURAO DHOREPimpale GuravPune
DHANANJAY BABURAO DHOREPimple NilakhPune
KAMAL JALINDAR DHOREPimple NilakhPune
SUMAN SHANKAR DONGAREPimple NilakhPune
SHAKUNTALA SHIVAJI TINGAREPimple NilakhPune
DEVYANI BHANUDAS GHULEPimple NilakhPune
ASHISH GOPICHANDRA DHOREPimple NilakhPune
SATISH GOPICHAND DHOREPimple NilakhPune
HARSHAL MACHINDRA DHOREPimple NilakhPune
KARAN DHANANJAY DHOREPimple NilakhPune
SURESH JALINDAR DHOREPimple NilakhPune
UDAY JALINDAR DHOREPimple NilakhPune
SUJATA RAJARAM MUNGSEPimple NilakhPune
ANJALI EKNATH GUJARPimple NilakhPune
SANGITA ALIAS PUJA MHASKU KAMTHEPimple NilakhPune
THAKUBAI HARISHCHANDRA DHOREPimple NilakhPune
SHAMRAO HARISHCHANDRA DHOREPimple NilakhPune
RAKESH HARISHCHANDRA DHOREPimple NilakhPune
NEELIMA BALASAHEB THORVEPimple NilakhPune
VAISHALI DATTATRAYA WAGHOLEPimple NilakhPune
GULAB ALIAS PUSHPA VIJAY HAGWANEPimple NilakhPune
LILABAI JANARDAN DHOREPimple NilakhPune
PURSHOTTAM JANARDAN DHOREPimple NilakhPune
ANAND JANARDAN DHOREPimple NilakhPune
MINAKSHI GULABRAO SORTEPimple NilakhPune
SUNIL PRABHAKAR DHOREPimple NilakhPune
ANIL ANKUSH DHOREPimple NilakhPune
MANOJ ANKUSH DHOREPimple NilakhPune
CHETAN SUBHASH DHOREPimple NilakhPune
KALPANA DHANANJAY DHOREPimple NilakhPune
SUNANDA MACHINDRA DHOREPimple NilakhPune
REKHA GOPICHAND DHOREPimple NilakhPune
SHUBASH SITARAM DHOREPimple NilakhPune
PRABHAKAR SITARAM DHOREPimple NilakhPune

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNICIPAL CORPORATION
Permissible FSI6730.58
Proposed, not sanctioned5,388 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor S No 141 2 3 4 5 Graound Floor Rajaveer Palace Phase 2 Pimple Saudagar Pune 411027
Estimated costRs 22.53 cr
Cost incurredRs 15.98 cr
Work done70.92%
BuildingWingEstimatedIncurred
SAHIL HEIGHTS A1NARs 20.83 crRs 15.63 cr
-NARs 1.69 crRs 35.00 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGIRISH E. GUPTE
EngineerSANTOSH V. KATE
EngineerG A Bhilare
EngineerAKSHAY TUPE
Chartered AccountantPGMJ AND ASSOCIATES
Chartered AccountantMAHAVIR PAREKH & CO
Chartered AccountantNITISH VAIDYA & ASSOCIATES
PartnerRole in project
VAISHNAVI PROMOTERS AND DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Aug 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Aug 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: Form 2A Final.pdf26 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A Final.pdf26 Aug 2026
Form 2A (FY 2023-2024)File: Form 2A Final.pdf26 Aug 2026
Withdrawal Update Form 1File: Form 1.pdf24 Jul 2026
Withdrawal Update Form 2File: Form 2.pdf24 Jul 2026
Withdrawal Update Form 3File: Form 3 .pdf24 Jul 2026
Withdrawal Update Form 1File: Form 1.pdf18 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf18 Apr 2026
Withdrawal Update Form 3File: Form 3.pdf18 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf6 Mar 2026
Withdrawal Update Form 2File: Form 2.pdf6 Mar 2026
Withdrawal Update Form 3File: Form 3.pdf6 Mar 2026
Form 5 (FY 2023-2024)File: Form 5 23-24 Final.pdf29 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 24-25 Final.pdf29 Nov 2025
Withdrawal Update Form 1File: Form 1 Final.pdf19 Oct 2025
Withdrawal Update Form 2File: Form 2 Final.pdf19 Oct 2025
Withdrawal Update Form 3File: Form 3 Final.pdf19 Oct 2025
Withdrawal Update Form 1File: Form 1 Final.pdf15 Oct 2025
Withdrawal Update Form 2File: Form 2 Final.pdf15 Oct 2025
Withdrawal Update Form 3File: Form 3 Final.pdf15 Oct 2025
Layout approvalFile: Sanction Plan.pdf5 Aug 2025
Building plan approvalFile: Building Plan 1.pdf5 Aug 2025
Building plan approvalFile: Building Plan 2.pdf5 Aug 2025
Building plan approvalFile: Building Plan 3.pdf5 Aug 2025
Building plan approvalFile: Building Plan 4.pdf5 Aug 2025
Building plan approvalFile: Building Plan 5.pdf5 Aug 2025
Form 1File: Form 1.pdf4 Aug 2025
Form 2File: Form 2.pdf4 Aug 2025
Form 3File: Form 3.pdf4 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Circular.pdf4 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect MAr-25_compressed.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate -Mar-25.pdf28 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Mar-25.pdf28 Apr 2025
Other - TechnicalFile: Form-2A 24-25.pdf28 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A 24-25.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf13 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Dec 24_Sahil Heights.pdf13 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2- Dec 24.pdf13 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Sep 24.pdf6 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Sep 24.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Sep 24.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Certificate.pdf10 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER Certificate.pdf10 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf10 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf10 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf10 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf10 May 2024
Copy of the legal title reportFile: LTR merged-1-5.pdf6 Feb 2024
Copy of the legal title reportFile: LTR merged-6-10.pdf6 Feb 2024
Copy of the legal title reportFile: LTR merged-11-14.pdf6 Feb 2024
Copy of the legal title reportFile: LTR merged-15-19.pdf6 Feb 2024
Other - FinanceFile: REA52100151088 CC Mail.pdf22 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 5 (4).pdf26 Dec 2023
Declaration about Commencement CertificateFile: Circular 32.pdf21 Dec 2023
CERSAI detailsFile: CERSAI FINAL.pdf21 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclore Santosh kate.pdf21 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: discloser Nilesh kate.pdf21 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: discloser sandeep kate.pdf21 Dec 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf21 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final FORM 3_compressed.pdf18 Dec 2023
Other - TechnicalFile: Carpet area.pdf18 Dec 2023
Layout approvalFile: LAYOUT HIGHLIGHTED_compressed.pdf11 Dec 2023
Building plan approvalFile: BUILDING 1_compressed.pdf11 Dec 2023
Building plan approvalFile: BUILDING 2_compressed.pdf11 Dec 2023
Building plan approvalFile: BUILDING 3_compressed.pdf11 Dec 2023
Building plan approvalFile: BUILDING HIGHLIGHTED_compressed.pdf11 Dec 2023
Copy of Layout Approval (in case of layout)File: LAYOUT HIGHLIGHTED_compressed.pdf11 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILDING 1_compressed.pdf11 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILDING 2_compressed.pdf11 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILDING 3_compressed.pdf11 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: BUILDING HIGHLIGHTED_compressed.pdf11 Dec 2023
Declaration in FORM BFile: form b- sahil hights.pdf11 Dec 2023
Proforma of Agreement for saleFile: Plain Model AFS.pdf11 Dec 2023
Deviation Report with respect to Allotment letterFile: Allotment declaration.pdf11 Dec 2023
Deviation Report with respect to model copy of AgreementFile: DocScanner Dec 1, 2023 1-40 PM.pdf11 Dec 2023
PAN CardFile: FIRM PAN.pdf7 Dec 2023
Details of encumbrances concerned to FinanceFile: financial Encrumbances.pdf7 Dec 2023
Details of encumbrances concerned to LegalFile: financial Encrumbances.pdf7 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: New Commencement Certificate.pdf7 Dec 2023

How this compares with Pune

20%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAHIL HEIGHTS A1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PIMPLE NILAKH13,700+ in Pune

2 kmSAHIL HEIGHTS A1Completed 95Lapsed / revoked 38Other 101Dot size: filed unitsN

Filed coordinates, straight-line distance. 234 registered projects within 2 km.

Builder: VAISHNAVI PROMOTERS AND DEVELOPERS

VAISHNAVI PROMOTERS AND DEVELOPERS has 10 registrations on MahaRERA, including SAHIL VIGHNESH RESIDENCY and SAHIL HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SAHIL HEIGHTS A1 is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAHIL HEIGHTS A1?

The registered promoter entity is VAISHNAVI PROMOTERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAHIL HEIGHTS A1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAHIL HEIGHTS A1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAHIL HEIGHTS A1?

The professionals named in the filing: Architect: GIRISH E. GUPTE; Engineer: SANTOSH V. KATE; Engineer: G A Bhilare; Engineer: AKSHAY TUPE; Chartered Accountant: PGMJ AND ASSOCIATES; Chartered Accountant: MAHAVIR PAREKH & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAHIL HEIGHTS A1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAHIL HEIGHTS A1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAHIL HEIGHTS A1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.