Home / Browse projects / Pune, Maharashtra / SADGURU RESIDENCY
SADGURU RESIDENCY
By MAA PRANAAM BUILDCON PRIVATE LIMITED
RG-MH-52410 · RERA P52100017241 · Last updated on MahaRERA portal: 29 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 36 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SADGURU RESIDENCY is a Residential / Group Housing project by MAA PRANAAM BUILDCON PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100017241 on 24 Jul 2018. Possession is promised by 30 Dec 2026. The completion date has moved by 36 months from the original filing. 1 of the 2 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NameSADGURU RESIDENCY
- TypeResidential / Group Housing
- Location
- YEWALEWADI
- YAWALEWADI
- Haveli
- Pune
- 411048
- Pincode411048
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100017241
- ReraGenie IDRG-MH-52410
Builder
- NameMAA PRANAAM BUILDCON PRIVATE LIMITED
- Entity typeCompany
- DirectorVIVEK SURESH PAWAR
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on24 Jul 2018
- Promised completion30 Dec 2026
- Revised completionRevised to 30 Dec 2026 (originally 30 Dec 2023)
- Buildings1 building record
- Documents filed79 files
Current status
Figures as on 29 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING A | NA | 10 | 7 | 2 | 0 | 2 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 25%.
BUILDING A: 30% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 25% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 29 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed48
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| RAMDAS BABAN DHANDEKAR | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RAJENDRA THITE & ASSOCIATES |
| Architect | Shraddha Nitin Nimbarte |
| Engineer | RAJESH NIGADE |
| Chartered Accountant | Mayank Kriplani |
| Chartered Accountant | Pranal p Thakare |
| Partner | Role in project |
|---|---|
| MAA PRANAAM BUILDCON PRIVATE LIMITED | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe Project's completion was delayed as a result of Covid-19 and booking difficulties. The Promoter is making an effort to finish the project entirely by the deadline specified in this extension application. The promoter agrees to update the MahaRERA webpage with a progress report on a quarterly, annual, or regular basis in accordance with the MahaRERA Circular. Therefore, in the interest of the project and the Promoter, the current extension request may kindly be approved.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 11 Jul 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Oct 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Oct 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2026
Documents filed79
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 Maa Pranam Buildcon.pdf | 29 Apr 2026 |
| Form 2File: Sadguru Residency Engineers Certificate.pdf | 29 Apr 2026 |
| Form 3File: Pranal Thakare CA Sadguru Residency Report.pdf | 29 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Sadgur Residency Inventory Details.pdf | 29 Apr 2026 |
| Form 1File: Form 1.pdf | 20 Jan 2026 |
| Form 2File: Form 2 Sep.pdf | 20 Jan 2026 |
| Form 3File: Form 3 Sep.pdf | 20 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Sep.pdf | 20 Jan 2026 |
| Form 1File: Form 1 Sadguru.pdf | 20 Jan 2026 |
| Form 2File: Form 2 Dec.pdf | 20 Jan 2026 |
| Form 3File: Form 3 Dec.pdf | 20 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Dec.pdf | 20 Jan 2026 |
| Form 1File: form 1 .pdf | 28 Jul 2025 |
| Form 2File: Form 2 30-06-2025.pdf | 28 Jul 2025 |
| Form 3File: Form 3 30-06-2025.pdf | 28 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: sold sd 30-6-25.pdf | 28 Jul 2025 |
| Declaration in FORM BFile: FORM B_AFFIDAVIT.pdf | 23 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form -1 Architect Certificate.pdf | 23 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A_SR_LETTERHEAD_231023.pdf | 23 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM5_22-23.pdf | 23 Oct 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_with Declaration.pdf | 20 Oct 2023 |
| Layout approvalFile: Layout Santion Plan_compressed.pdf | 19 Oct 2023 |
| Building plan approvalFile: A Building 1st and 2nd Floor_compressed.pdf | 19 Oct 2023 |
| Building plan approvalFile: A Building 3rd and 4th Floor_compressed.pdf | 19 Oct 2023 |
| Building plan approvalFile: A Building 5th and 6th_compressed.pdf | 19 Oct 2023 |
| Building plan approvalFile: A Building 7th and Elevation_compressed.pdf | 19 Oct 2023 |
| Building plan approvalFile: B Building Floor Plan_compressed.pdf | 19 Oct 2023 |
| Copy of Layout Approval (in case of layout)File: Layout Santion Plan_compressed.pdf | 19 Oct 2023 |
| Building Plan Approval (IOD)File: A Building 1st and 2nd Floor_compressed.pdf | 19 Oct 2023 |
| Building Plan Approval (IOD)File: A Building 3rd and 4th Floor_compressed.pdf | 19 Oct 2023 |
| Building Plan Approval (IOD)File: A Building 5th and 6th_compressed.pdf | 19 Oct 2023 |
| Building Plan Approval (IOD)File: A Building 7th and Elevation_compressed.pdf | 19 Oct 2023 |
| Building Plan Approval (IOD)File: B Building Floor Plan_compressed.pdf | 19 Oct 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: New CC_compressed.pdf | 19 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 19 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory-Updated.pdf | 17 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 2022-2023.pdf | 16 Oct 2023 |
| Declaration about Commencement CertificateFile: Declaration of Commencement Certificate.pdf | 14 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 14 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A_SR_19-20.pdf | 14 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A_SR_20-21.pdf | 14 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A_SR_21-22.pdf | 14 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A_SR_22-23.pdf | 14 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory.pdf | 14 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Sold Unsold Inventory.pdf | 14 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5_SR_21-22.pdf | 14 Oct 2023 |
| Details of encumbrances concerned to FinanceFile: DETAIL OF ENCUMBRANCES Sadguru Residency.pdf | 5 May 2023 |
| Details of encumbrances concerned to LegalFile: DETAIL OF ENCUMBRANCES Sadguru Residency.pdf | 5 May 2023 |
| Proforma of Agreement for saleFile: SADGURU Residency MHADA DRAFT-1 (1).pdf | 2 May 2023 |
| Layout approvalFile: 20210825001_compressed (1).pdf | 17 Jan 2023 |
| Building plan approvalFile: 20210825002_compressed.pdf | 17 Jan 2023 |
| Building plan approvalFile: 20210825003_compressed (1).pdf | 17 Jan 2023 |
| Building plan approvalFile: 20210825004_compressed.pdf | 17 Jan 2023 |
| Building plan approvalFile: 20210825005_compressed.pdf | 17 Jan 2023 |
| Building plan approvalFile: 20210825006_compressed.pdf | 17 Jan 2023 |
| Building plan approvalFile: 20210825007_compressed.pdf | 17 Jan 2023 |
| Building plan approvalFile: 20210825008_compressed.pdf | 17 Jan 2023 |
| Copy of Layout Approval (in case of layout)File: 20210825001_compressed (1).pdf | 17 Jan 2023 |
| Building Plan Approval (IOD)File: 20210825002_compressed.pdf | 17 Jan 2023 |
| Building Plan Approval (IOD)File: 20210825003_compressed (1).pdf | 17 Jan 2023 |
| Building Plan Approval (IOD)File: 20210825004_compressed.pdf | 17 Jan 2023 |
| Building Plan Approval (IOD)File: 20210825005_compressed.pdf | 17 Jan 2023 |
| Building Plan Approval (IOD)File: 20210825006_compressed.pdf | 17 Jan 2023 |
| Building Plan Approval (IOD)File: 20210825007_compressed.pdf | 17 Jan 2023 |
| Building Plan Approval (IOD)File: 20210825008_compressed.pdf | 17 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: Details of Encumbrances Sadguru Residency.pdf | 22 Dec 2022 |
| Details of encumbrances concerned to LegalFile: Details of Encumbrances Sadguru Residency.pdf | 22 Dec 2022 |
| Details of encumbrances concerned to LegalFile: DETAIL OF ENCUMBRANCES.pdf | 1 Sep 2022 |
| Certificates of CA (Form 3)File: CA Certificate for RERA.pdf | 12 Jul 2018 |
| Layout approvalFile: Building Plan 1.pdf | 11 Jul 2018 |
| Building plan approvalFile: Building Plan 1.pdf | 11 Jul 2018 |
| PAN CardFile: PANCARD.pdf | 11 Jul 2018 |
| Copy of the legal title reportFile: Legal Title Report.pdf | 11 Jul 2018 |
| Details of encumbrancesFile: Declaration.pdf | 11 Jul 2018 |
| Copy of Layout Approval (in case of layout)File: Building Plan 1.pdf | 11 Jul 2018 |
| Building Plan Approval (IOD)File: Building Plan 1.pdf | 11 Jul 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 11 Jul 2018 |
| Declaration in FORM BFile: Form B.pdf | 11 Jul 2018 |
| Proforma of Allotment letterFile: Dhandekar Agreement Draft.pdf | 11 Jul 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 79 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SADGURU RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near YEWALEWADI13,700+ in Pune
Filed coordinates, straight-line distance. 112 registered projects within 2 km.
Dwarikadham
Yashodhan Affordable Landmark LLP
UNITAS FASHION CENTER
UNITATIS DEVELOPMENTS PVT. LTD
Millennium Park
Xrbia Epoch Creations LLP
BABAR CLASSIC VISTA WING E, F, G
Classic Properties
JITO NAGAR
JAIN ASHAPURI DEVELOPER UNIT II
Wellwisher West Views
Bhansali Infrastructure LLP
Builder: MAA PRANAAM BUILDCON PRIVATE LIMITED
MAA PRANAAM BUILDCON PRIVATE LIMITED has 1 registration on MahaRERA, including SADGURU RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SADGURU RESIDENCY is delayed beyond 30 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SADGURU RESIDENCY?
The registered promoter entity is MAA PRANAAM BUILDCON PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SADGURU RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SADGURU RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SADGURU RESIDENCY?
The professionals named in the filing: Architect: RAJENDRA THITE & ASSOCIATES; Architect: Shraddha Nitin Nimbarte; Engineer: RAJESH NIGADE; Chartered Accountant: Mayank Kriplani; Chartered Accountant: Pranal p Thakare. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SADGURU RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback