Home / Browse projects / Thane, Maharashtra / Saayam Visava

Completed No litigation declared Residential / Group Housing project

Saayam Visava

By Shrikrishna Ramchandra Marathe

RG-MH-12725 · RERA P51700024133 · Last updated on MahaRERA portal: 3 Feb 2025

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
May 2023Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Internal walls, 80%
0Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

Saayam Visava is a Residential / Group Housing project by Shrikrishna Ramchandra Marathe in Thane, Maharashtra, registered with MahaRERA as P51700024133 on 21 Jan 2020. The registration is recorded completed; possession was promised by 30 May 2023.

At a glance

Project

  • NameSaayam Visava
  • TypeResidential / Group Housing
  • Location
    • Shivaji Path
    • Middle class Soc.
    • DOMBIVLI
    • Kalyan
    • Thane
    • 421201
  • Pincode421201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700024133
  • ReraGenie IDRG-MH-12725

Builder

  • NameShrikrishna Ramchandra Marathe
  • Entity typeIndividual
  • Other registrations2 more →
  • Completed2 of 3
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredJan 2020PromisedMay 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on21 Jan 2020
  • Promised completion30 May 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed59 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Saayam VisavaNA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.

Saayam Visava: 74% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes10%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed23

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots23
Closed/Covered23

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area638 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1198.0
Proposed, not sanctioned942 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRam Nagar Dombivali E

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnkur Shetye
EngineerGirish S Marathe
Chartered AccountantNavin Mistry
Chartered AccountantANKUR SANGOI & ASSOCIATES
PartnerRole in project
Shrikrishna Ramchandra Marathe-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700017373May 2023 → Mar 2024

Reason as filed by the promoterDue to corona pandemic project work got delayed also there was addition in FSI so Revised Commencement certificate received in June 2021 for two additional floor

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Jan 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Oct 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Mar 2024

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_Ranade Signed For 29 FEB 2024_compressed.pdf3 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Signed Form 5_Ranade MARCH 23_compressed.pdf3 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 RANADE 15OCT2023.pdf30 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 RANADE 15 JAN 2024.pdf30 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Ranade 15OCT2023.pdf27 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Ranade JAN2024.pdf27 Mar 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory as on 31DEC2023.pdf27 Mar 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory as on15 MARCH 2024.pdf27 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC RANADE 28DEC2023.pdf27 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: RANADE OC PlaN FINAL.pdf27 Mar 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 Ranade Site.pdf27 Mar 2024
Declaration in FORM BFile: Form B_compressed.pdf19 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A_ 31st March 2020.pdf19 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A_31st March 2021.pdf19 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A_31st March 2022.pdf19 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_31st March 2023.pdf19 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_31st May 2023.pdf19 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 15JUNE2023.pdf17 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_ EnG CERT RANADE 15JUNE2023.pdf17 Aug 2023
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf7 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Ranade Form 2A march 23.pdf7 Aug 2023
Disclosure of sold/ booked inventoryFile: inventory sold details march 2023.pdf7 Aug 2023
Disclosure of sold/ booked inventoryFile: Sold Inventory MAY 2023.pdf7 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY21-22 Ranade.pdf7 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_compressed.pdf5 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY19-20 Ranade.pdf5 Aug 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY20-21 Ranade.pdf5 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 01 Ranade Architect Certificate_JUNE 2020.pdf2 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 02 Ranade Architect Certificate JUNE 2021.pdf2 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 03 Ranade Architect Certificate JUNE 2022.pdf2 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 04 Ranade Architect Certificate_ JUNE 2023.pdf2 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 15 june 2020.pdf2 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 june2021.pdf2 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 june 2022.pdf2 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Ranade MAY 2023.pdf2 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: form 2a 15 june 2020.pdf2 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form 2a june 2021.pdf2 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2a june 2022.pdf2 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Ranade Form 2A MAY 2023.pdf2 Jun 2023
OtherFile: Ranade Form 2A MAY 2023.pdf2 Jun 2023
Layout approvalFile: REVISED Aprroved plan LAYOUT.pdf12 Apr 2023
Copy of Layout Approval (in case of layout)File: REVISED Aprroved plan LAYOUT.pdf12 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: Revised C C.pdf12 Apr 2023
OtherFile: Power Of Attorney.pdf20 Jan 2020
OtherFile: Development Agreement.pdf20 Jan 2020
OtherFile: MCHI Membership Certificate.pdf20 Jan 2020
PAN CardFile: Pan Card.pdf17 Jan 2020
Copy of the legal title reportFile: Title report.pdf17 Jan 2020
Proforma of Allotment letterFile: Ranade tenant.pdf17 Jan 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE (Maharera).pdf25 Nov 2019
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate ( Ranade Project).pdf25 Nov 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certifcate Ranade.pdf25 Nov 2019
Building plan approvalFile: Ranade Approval plan.pdf16 Oct 2019
Layout approvalFile: Ranale Layout.pdf16 Oct 2019
Details of encumbrancesFile: Details of Encrumbances.pdf16 Oct 2019
Copy of Layout Approval (in case of layout)File: Ranale Layout.pdf16 Oct 2019
Building Plan Approval / NA Order for plotted developmentFile: Ranade Approval plan.pdf16 Oct 2019
Commencement Certificates / NA Order for plotted developmentFile: Ranade C C.pdf16 Oct 2019
Declaration in FORM BFile: Ranade RERA Affidavit (Form B ).pdf16 Oct 2019

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
ShubanAdwait plot no 26 Trimurti Society Ganesh Nagar Dombivali W14CompletedFeb 2019Late, Jun 2019
Karjat Bapt SiteOpp. Sunil Chhiki old court road Karjat9CompletedAug 2016Late, Dec 2016

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Saayam Visava on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Middle class Soc.7,600+ in Thane

2 kmSaayam VisavaCompleted 94Lapsed / revoked 83Other 142Dot size: filed unitsN

Filed coordinates, straight-line distance. 319 registered projects within 2 km.

Builder: Shrikrishna Ramchandra Marathe

Shrikrishna Ramchandra Marathe has 3 registrations on MahaRERA, including SAANJ CO OP HSG SOC Praposed and Saayam Visava. Its filings disclose 6 earlier MahaRERA projects: declares 2 of 6 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Saayam Visava is delayed beyond 30 May 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Saayam Visava?

The registered promoter entity is Shrikrishna Ramchandra Marathe, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Saayam Visava?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Saayam Visava?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Saayam Visava?

The professionals named in the filing: Architect: Ankur Shetye; Engineer: Girish S Marathe; Chartered Accountant: Navin Mistry; Chartered Accountant: ANKUR SANGOI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Saayam Visava?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Saayam Visava. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Saayam Visava to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.