Home / Browse projects / Thane, Maharashtra / S B TOWER
S B TOWER
RG-MH-05149 · RERA P51700051089 · Last updated on MahaRERA portal: 30 Jun 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
S B TOWER is a Others project by EKVEERA ENTERPRISES in Thane, Maharashtra, registered with MahaRERA as P51700051089 on 29 May 2023. Possession is promised by 31 Dec 2026. 40 of the 176 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete.
At a glance
Project
- NameS B TOWER
- TypeOthers
- Location
- SHILPHATA ROAD
- NEKNIPADA
- GOLVALI
- NEAR NAHAR HOSPITAL
- DOMBIVLI
- Kalyan
- Thane
- 421202
- Pincode421202
- RERA no.P51700051089
- ReraGenie IDRG-MH-05149
Builder
- NameEKVEERA ENTERPRISES
- Entity typePartnership
- PartnersNILKANTHA YADAV BHAGAT, DINESH GANESH BHAGAT, NILESH YADAV BHAGAT, ABHISHEK GANESH BHAGAT
- Other registrations8 more →
- Completed1 of 9
- No longer live4 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 May 2023
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings2 building records
- Documents filed63 files
Current status
Figures as on 30 Jun 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TYPE A | NA | 3 | 3 | 0 | 5 | 5 |
| TYPE B | NA | 16 | 0 | 144 | 27 | 171 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 30 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 52%.
TYPE A91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TYPE B47%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 52% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 20% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities18
As on 30 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
| SUBSTATION RECEIVING STATION | Yes | 0% |
| SOLAR PANEL INSTALLATION | Yes | 0% |
| DG SET INSTALLATION | Yes | 0% |
Parking filed134
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership7
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| VASUDEO BALARAM PATIL | Thane (M Corp.) | Thane |
| EKNATH BALARAM PATIL | Thane (M Corp.) | Thane |
| PRABHAVATI GANESH PATIL | Thane (M Corp.) | Thane |
| AARATI BANDU MHATRE | Thane (M Corp.) | Thane |
| SAVITA SUNIL GAIKAR | Thane (M Corp.) | Thane |
| VRUSHALI PRALHAD PATIL | Thane (M Corp.) | Thane |
| VISHAL BUDHAJEE PATIL | Thane (M Corp.) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Joshi Deshaware & Associates |
| Engineer | Ajay Mahale & Associates |
| Chartered Accountant | HEMANT SHETTY & CO |
| Chartered Accountant | SHETTY & SHETTY |
| Chartered Accountant | BHARTI RUPESH & ASSOCIATES |
| Partner | Role in project |
|---|---|
| EKVEERA ENTERPRISES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Mar 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Mar 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Apr 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 26 Dec 2024
Documents filed63
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form_1_SB TOVER_Sign.pdf | 30 Jun 2025 |
| Form 2File: Form 2 S B TOWER.pdf | 30 Jun 2025 |
| Form 3File: CA Certificate_Form 3_SB Tower Q4_Sign.pdf | 30 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of sold and Booked.pdf | 30 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: self declaration.pdf | 30 Jun 2025 |
| Building plan approvalFile: Final KDMC Plan.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SB TOWER ARCHITECT.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: S B TOWER ENGINEER CERTICATE Q4.pdf | 19 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Final CC .pdf | 19 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Final KDMC Plan.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Q2.pdf | 26 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 Architect Certificate Q2.pdf | 26 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Fom2 Engineer's Certificate Q2 .pdf | 26 Dec 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: A Wing OC and B Wing Part OC.pdf | 26 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE Q1 SB TOWER.pdf | 20 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1.PDF | 17 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Q2.PDF | 17 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1_Q3.PDF | 17 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Q4.pdf | 17 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q1.pdf | 17 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q2.pdf | 17 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q3.pdf | 17 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q4.pdf | 17 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q1_3_Compressed.pdf | 17 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q2_Compressed.pdf | 17 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q3_Compressed.pdf | 17 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q4_Compressed.pdf | 17 Jun 2024 |
| Details of encumbrances concerned to FinanceFile: legal and finance.pdf | 23 May 2023 |
| Details of encumbrances concerned to LegalFile: legal and finance.pdf | 23 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Abhijit Alimkar - S B Tower.pdf | 13 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Abhishek Bhagat S B Tower.pdf | 13 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Anil G Bhagat S B Tower.pdf | 13 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Dinesh Bhagat S B Tower.pdf | 13 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Nilesh Bhagat S B Tower.pdf | 13 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Nilesh Warekar S B Tower.pdf | 13 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Nilkantha Bhagat S B Tower.pdf | 13 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Siddhant Bhoir S B Tower.pdf | 13 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Sumit Bhoir S B Tower.pdf | 13 May 2023 |
| Other - FinanceFile: 4_Declaration of financial encumbrance.pdf | 13 May 2023 |
| Building plan approvalFile: Ekveera 5_Copy of Layout Approval_final.pdf | 31 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Ekveera 5_Copy of Layout Approval_final.pdf | 31 Mar 2023 |
| Proforma of Agreement for saleFile: S B TOWER SALE AGREEMENT.pdf | 31 Mar 2023 |
| CERSAI detailsFile: 5_Cersai Search Report alongwith Decl.pdf | 9 Mar 2023 |
| Layout approvalFile: 8_Copy of Layout Approval.pdf | 8 Mar 2023 |
| Building plan approvalFile: 9_Plan_12-02-2023_3.pdf | 8 Mar 2023 |
| PAN CardFile: 4_Pan Card of Organization.pdf | 8 Mar 2023 |
| Copy of the legal title reportFile: 5 Copy of The Legal Title Report.pdf | 8 Mar 2023 |
| Details of encumbrances concerned to FinanceFile: 7_Details of encumbrances Concerned to Legal.pdf | 8 Mar 2023 |
| Details of encumbrances concerned to LegalFile: 7_Details of encumbrances Concerned to Legal.pdf | 8 Mar 2023 |
| Copy of Layout Approval (in case of layout)File: 8_Copy of Layout Approval.pdf | 8 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 9_Plan_12-02-2023_3.pdf | 8 Mar 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 10_Commencement Certificcate_compressed.pdf | 8 Mar 2023 |
| Declaration about Commencement CertificateFile: 11_SB Tower Declaration of commencement certificate.pdf | 8 Mar 2023 |
| Declaration in FORM BFile: 12_Declaration Form B _Promoter.pdf | 8 Mar 2023 |
| Declaration in FORM BFile: 12_Declaration Form B _ Co-Promoter.pdf | 8 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 13_Architect Certificate.PDF | 8 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 14_Form 2_Engineer Certificate.pdf | 8 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7 Form 3 RERA Certificate.pdf | 8 Mar 2023 |
| Proforma of Allotment letterFile: 17_Proforma of the allotment letter_compressed.pdf | 8 Mar 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 6_Separate bank account declaration.pdf | 8 Mar 2023 |
| Deviation Report with respect to Allotment letterFile: 21_deviation allotment letter declaration.pdf | 8 Mar 2023 |
| Deviation Report with respect to model copy of AgreementFile: 3_Deviation Sheets for Agreement for Sale.pdf | 8 Mar 2023 |
| Other - TechnicalFile: S B Tower_NAREDCO Certificate.pdf | 8 Mar 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 8 other registrations, which the RERA portal never shows together
- All 63 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep S B TOWER on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEAR NAHAR HOSPITAL7,600+ in Thane
Swaminarayan City Phase 1C
Swaminarayan Life Space LLP
Swaminarayan City Phase I
Swaminarayan Life Space LLP
BHOIR JEWELS
SHANKAR NAMAJI BHOIR
Swaminarayan City Phase 1D
Swaminarayan Life Space LLP
Amar Galaxy Bldg No. 2 Wing B and C
AMAR REALTY
Swaminarayan City Phase 1B
Swaminarayan Life Space LLP
See every Thane project, with the district possession charts
Builder: EKVEERA ENTERPRISES
EKVEERA ENTERPRISES has 9 registrations on MahaRERA, including CHANDRANGAN RESIDENCY TYPE- A and CHANDRANGAN RESIDENCY TYPE - B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if S B TOWER is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of S B TOWER?
The registered promoter entity is EKVEERA ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in S B TOWER?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for S B TOWER?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at S B TOWER?
The professionals named in the filing: Architect: Joshi Deshaware & Associates; Engineer: Ajay Mahale & Associates; Chartered Accountant: HEMANT SHETTY & CO; Chartered Accountant: SHETTY & SHETTY; Chartered Accountant: BHARTI RUPESH & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in S B TOWER?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.