ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / S B TOWER

Registered No litigation declared Others project

S B TOWER

By EKVEERA ENTERPRISES

RG-MH-05149 · RERA P51700051089 · Last updated on MahaRERA portal: 30 Jun 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
14 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 52%
136 of 176Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 63 documents Report an error

S B TOWER is a Others project by EKVEERA ENTERPRISES in Thane, Maharashtra, registered with MahaRERA as P51700051089 on 29 May 2023. Possession is promised by 31 Dec 2026. 40 of the 176 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete.

At a glance

Project

  • NameS B TOWER
  • TypeOthers
  • Location
    • SHILPHATA ROAD
    • NEKNIPADA
    • GOLVALI
    • NEAR NAHAR HOSPITAL
    • DOMBIVLI
    • Kalyan
    • Thane
    • 421202
  • Pincode421202
  • RERA no.P51700051089
  • ReraGenie IDRG-MH-05149

Builder

  • NameEKVEERA ENTERPRISES
  • Entity typePartnership
  • PartnersNILKANTHA YADAV BHAGAT, DINESH GANESH BHAGAT, NILESH YADAV BHAGAT, ABHISHEK GANESH BHAGAT
  • Other registrations8 more →
  • Completed1 of 9
  • No longer live4 lapsed, de-registered or revoked

Key dates

this monthRegisteredMay 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 May 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed63 files

Current status

23%40 of 176 units booked

Figures as on 30 Jun 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TYPE ANA33055
TYPE BNA16014427171

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 30 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 52%.

TYPE A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
TYPE B47%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure52%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities18

As on 30 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
SUBSTATION RECEIVING STATIONYes0%
SOLAR PANEL INSTALLATIONYes0%
DG SET INSTALLATIONYes0%

Parking filed134

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots134
Closed/Covered134

Land and ownership7

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,200 sq m
Land owned byThe promoter, with other names on the file
Named landowners7
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Jun 2025
LandownerVillageDistrict
VASUDEO BALARAM PATILThane (M Corp.)Thane
EKNATH BALARAM PATILThane (M Corp.)Thane
PRABHAVATI GANESH PATILThane (M Corp.)Thane
AARATI BANDU MHATREThane (M Corp.)Thane
SAVITA SUNIL GAIKARThane (M Corp.)Thane
VRUSHALI PRALHAD PATILThane (M Corp.)Thane
VISHAL BUDHAJEE PATILThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityKALYAN DOMBIVLI MUNICIPAL CORPORATION
Permissible FSI9890.93
Proposed, not sanctioned9,891 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR SHREE KRISHNA PARK DIVA SHIL ROAD DIVA EAST THANE 400612

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJoshi Deshaware & Associates
EngineerAjay Mahale & Associates
Chartered AccountantHEMANT SHETTY & CO
Chartered AccountantSHETTY & SHETTY
Chartered AccountantBHARTI RUPESH & ASSOCIATES
PartnerRole in project
EKVEERA ENTERPRISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 26 Dec 2024

Documents filed63

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form_1_SB TOVER_Sign.pdf30 Jun 2025
Form 2File: Form 2 S B TOWER.pdf30 Jun 2025
Form 3File: CA Certificate_Form 3_SB Tower Q4_Sign.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and Booked.pdf30 Jun 2025
Self-declaration of Quarterly ProgressFile: self declaration.pdf30 Jun 2025
Building plan approvalFile: Final KDMC Plan.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SB TOWER ARCHITECT.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: S B TOWER ENGINEER CERTICATE Q4.pdf19 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: Final CC .pdf19 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Final KDMC Plan.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Q2.pdf26 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 1 Architect Certificate Q2.pdf26 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Fom2 Engineer's Certificate Q2 .pdf26 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: A Wing OC and B Wing Part OC.pdf26 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE Q1 SB TOWER.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1.PDF17 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Q2.PDF17 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1_Q3.PDF17 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Q4.pdf17 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q1.pdf17 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q2.pdf17 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q3.pdf17 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q4.pdf17 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q1_3_Compressed.pdf17 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q2_Compressed.pdf17 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q3_Compressed.pdf17 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q4_Compressed.pdf17 Jun 2024
Details of encumbrances concerned to FinanceFile: legal and finance.pdf23 May 2023
Details of encumbrances concerned to LegalFile: legal and finance.pdf23 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Abhijit Alimkar - S B Tower.pdf13 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Abhishek Bhagat S B Tower.pdf13 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Anil G Bhagat S B Tower.pdf13 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Dinesh Bhagat S B Tower.pdf13 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Nilesh Bhagat S B Tower.pdf13 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Nilesh Warekar S B Tower.pdf13 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Nilkantha Bhagat S B Tower.pdf13 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Siddhant Bhoir S B Tower.pdf13 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Sumit Bhoir S B Tower.pdf13 May 2023
Other - FinanceFile: 4_Declaration of financial encumbrance.pdf13 May 2023
Building plan approvalFile: Ekveera 5_Copy of Layout Approval_final.pdf31 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: Ekveera 5_Copy of Layout Approval_final.pdf31 Mar 2023
Proforma of Agreement for saleFile: S B TOWER SALE AGREEMENT.pdf31 Mar 2023
CERSAI detailsFile: 5_Cersai Search Report alongwith Decl.pdf9 Mar 2023
Layout approvalFile: 8_Copy of Layout Approval.pdf8 Mar 2023
Building plan approvalFile: 9_Plan_12-02-2023_3.pdf8 Mar 2023
PAN CardFile: 4_Pan Card of Organization.pdf8 Mar 2023
Copy of the legal title reportFile: 5 Copy of The Legal Title Report.pdf8 Mar 2023
Details of encumbrances concerned to FinanceFile: 7_Details of encumbrances Concerned to Legal.pdf8 Mar 2023
Details of encumbrances concerned to LegalFile: 7_Details of encumbrances Concerned to Legal.pdf8 Mar 2023
Copy of Layout Approval (in case of layout)File: 8_Copy of Layout Approval.pdf8 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: 9_Plan_12-02-2023_3.pdf8 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: 10_Commencement Certificcate_compressed.pdf8 Mar 2023
Declaration about Commencement CertificateFile: 11_SB Tower Declaration of commencement certificate.pdf8 Mar 2023
Declaration in FORM BFile: 12_Declaration Form B _Promoter.pdf8 Mar 2023
Declaration in FORM BFile: 12_Declaration Form B _ Co-Promoter.pdf8 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 13_Architect Certificate.PDF8 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 14_Form 2_Engineer Certificate.pdf8 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7 Form 3 RERA Certificate.pdf8 Mar 2023
Proforma of Allotment letterFile: 17_Proforma of the allotment letter_compressed.pdf8 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 6_Separate bank account declaration.pdf8 Mar 2023
Deviation Report with respect to Allotment letterFile: 21_deviation allotment letter declaration.pdf8 Mar 2023
Deviation Report with respect to model copy of AgreementFile: 3_Deviation Sheets for Agreement for Sale.pdf8 Mar 2023
Other - TechnicalFile: S B Tower_NAREDCO Certificate.pdf8 Mar 2023

How this compares with Thane

23%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep S B TOWER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR NAHAR HOSPITAL7,600+ in Thane

Builder: EKVEERA ENTERPRISES

EKVEERA ENTERPRISES has 9 registrations on MahaRERA, including CHANDRANGAN RESIDENCY TYPE- A and CHANDRANGAN RESIDENCY TYPE - B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if S B TOWER is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of S B TOWER?

The registered promoter entity is EKVEERA ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in S B TOWER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for S B TOWER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at S B TOWER?

The professionals named in the filing: Architect: Joshi Deshaware & Associates; Engineer: Ajay Mahale & Associates; Chartered Accountant: HEMANT SHETTY & CO; Chartered Accountant: SHETTY & SHETTY; Chartered Accountant: BHARTI RUPESH & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in S B TOWER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About S B TOWER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save S B TOWER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.