Home / Browse projects / Aurangabad, Maharashtra / VENUGOPAL PARK

Registered No litigation declared Residential / Group Housing project

VENUGOPAL PARK

By Yashwant Mukund Kharote

RG-MH-69528 · RERA P51500080797 · Last updated on MahaRERA portal: 5 Jul 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Mar 2030Possession promisedno revision filed
0 of 143Construction stages doneacross 13 buildings; furthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

VENUGOPAL PARK is a Residential / Group Housing project by Yashwant Mukund Kharote in Aurangabad, Maharashtra, registered with MahaRERA as P51500080797 on 10 Jul 2025. Possession is promised by 31 Mar 2030.

At a glance

Project

  • NameVENUGOPAL PARK
  • TypeResidential / Group Housing
  • Location
    • Shivoor
    • Shioor
    • Vaijapur
    • Aurangabad
    • 431116
  • Pincode431116
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500080797
  • ReraGenie IDRG-MH-69528

Builder

  • NameYashwant Mukund Kharote
  • Entity typeIndividual

Key dates

this monthRegisteredJul 2025PromisedMar 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Jul 2025
  • Promised completion31 Mar 2030
  • Revised completionNone
  • Buildings13 building records
  • Documents filed68 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA22000
Building BNA22000
Building CNA22000
Building DNA22000
Building ENA22000
Building FNA22000
Building GNA22000
Building HNA22000
Building INA22000
Building JNA22000
Building kNA22000
Building LNA22000
Building MNA22000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building13

As on 5 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 143 construction stages are filed complete across 13 buildings. The stage furthest along is Excavation, at 0%.

Building A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building D0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building E0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building F0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building G0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building H0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building I0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building J0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building k0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building L0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building M0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes70%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes70%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes80%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed20

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots20
Closed/Covered20
BuildingClosed/CoveredTotal
Building A33
Building B33
Building C33
Building D33
Building J22
Building k22
Building L22
Building M22

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area12,134 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 Oct 2025

Approvals and building plan

Sanctioning authorityDistrict Collector Office Aurangabad
Permissible FSI6299.73
Proposed, not sanctioned5,300 sq m
Buildings approved13
Buildings sanctioned13

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJAGGIS BUILDING,NEAR KRANTI CHOWK,JALNA ROAD,AURANGABAD PIN 431005

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Sunil Chawda
EngineerSudarshan Anawade
Chartered AccountantCA Sachin Lathi
PartnerRole in project
Yashwant Mukund Kharote-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Apr 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2030

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Commencement Certificates / NA Order for plotted developmentFile: Gmail - Proposal No 224471 बाबतचे बांधकाम परवानगी व नकाशा (2).pdf5 Jul 2025
Commencement Certificates / NA Order for plotted developmentFile: पत्र.pdf5 Jul 2025
Other - TechnicalFile: Gmail - Proposal No 224471 बाबतचे बांधकाम परवानगी व नकाशा (2).pdf5 Jul 2025
Other - TechnicalFile: पत्र.pdf5 Jul 2025
Commencement Certificates / NA Order for plotted developmentFile: Gmail - Proposal No 224471 बाबतचे बांधकाम परवानगी व नकाशा (2).pdf5 Jul 2025
Commencement Certificates / NA Order for plotted developmentFile: पत्र.pdf5 Jul 2025
Other - TechnicalFile: Gmail - Proposal No 224471 बाबतचे बांधकाम परवानगी व नकाशा (2).pdf5 Jul 2025
Other - TechnicalFile: पत्र.pdf5 Jul 2025
Other - LegalFile: 708and710 (Yashwant pur).pdf19 May 2025
Other - LegalFile: 708and710 (Yashwant pur).pdf19 May 2025
Details of encumbrances concerned to FinanceFile: Encumbrancr Declration_0001.pdf7 May 2025
Details of encumbrances concerned to FinanceFile: Decleration of No-Encumbrance_0001.pdf7 May 2025
Details of encumbrances concerned to LegalFile: Encumbrancr Declration_0001.pdf7 May 2025
Details of encumbrances concerned to LegalFile: Decleration of No-Encumbrance_0001.pdf7 May 2025
Other - TechnicalFile: 708and710 (Yashwant pur).pdf7 May 2025
Details of encumbrances concerned to FinanceFile: Encumbrancr Declration_0001.pdf7 May 2025
Details of encumbrances concerned to FinanceFile: Decleration of No-Encumbrance_0001.pdf7 May 2025
Details of encumbrances concerned to LegalFile: Encumbrancr Declration_0001.pdf7 May 2025
Details of encumbrances concerned to LegalFile: Decleration of No-Encumbrance_0001.pdf7 May 2025
Other - TechnicalFile: 708and710 (Yashwant pur).pdf7 May 2025
Declaration about Commencement CertificateFile: Format-D_0001.pdf6 May 2025
CERSAI detailsFile: Decleration_0001.pdf6 May 2025
Other - TechnicalFile: Annexure A_0001.pdf6 May 2025
Declaration about Commencement CertificateFile: Format-D_0001.pdf6 May 2025
CERSAI detailsFile: Decleration_0001.pdf6 May 2025
Other - TechnicalFile: Annexure A_0001.pdf6 May 2025
Proforma of Allotment letterFile: allotment letter.pdf12 Apr 2025
Declaration in FORM BFile: Form B affidavit.pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARSunil Chawda - converted.pdf12 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dt-12-04-2025_0001.pdf12 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Er Sudarshan.pdf12 Apr 2025
Proforma of Agreement for saleFile: ASF.pdf12 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format -B_0001.pdf12 Apr 2025
Proforma of Allotment letterFile: allotment letter.pdf12 Apr 2025
Declaration in FORM BFile: Form B affidavit.pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARSunil Chawda - converted.pdf12 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dt-12-04-2025_0001.pdf12 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Er Sudarshan.pdf12 Apr 2025
Proforma of Agreement for saleFile: ASF.pdf12 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format -B_0001.pdf12 Apr 2025
Layout approvalFile: plan -1.pdf10 Apr 2025
Building plan approvalFile: plan.pdf10 Apr 2025
Layout approvalFile: plan -1.pdf10 Apr 2025
Building plan approvalFile: plan.pdf10 Apr 2025
PAN CardFile: PANCARD YASHWANT.pdf10 Apr 2025
Copy of the legal title reportFile: SEARCH.pdf10 Apr 2025
Details of encumbrances concerned to FinanceFile: Declaration of No encumbernce_0001.pdf10 Apr 2025
Copy of Layout Approval (in case of layout)File: plan -1.pdf10 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: Cert_BP_Padmabhushan Saindane_224471_420.pdf10 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: plan.pdf10 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format -A_0001.pdf10 Apr 2025
Deviation Report with respect to Allotment letterFile: To whow so ever it may concern_0001_0001.pdf10 Apr 2025
Details of encumbrances concerned to LegalFile: Declaration of No encumbernce_0001.pdf10 Apr 2025
Deviation Report with respect to model copy of AgreementFile: To whow so ever it may concern_0001.pdf10 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure-A_0001.pdf10 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured -unsecured_0001.pdf10 Apr 2025
PAN CardFile: PANCARD YASHWANT.pdf10 Apr 2025
Copy of the legal title reportFile: SEARCH.pdf10 Apr 2025
Details of encumbrances concerned to FinanceFile: Declaration of No encumbernce_0001.pdf10 Apr 2025
Copy of Layout Approval (in case of layout)File: plan -1.pdf10 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: Cert_BP_Padmabhushan Saindane_224471_420.pdf10 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: plan.pdf10 Apr 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format -A_0001.pdf10 Apr 2025
Deviation Report with respect to Allotment letterFile: To whow so ever it may concern_0001_0001.pdf10 Apr 2025
Details of encumbrances concerned to LegalFile: Declaration of No encumbernce_0001.pdf10 Apr 2025
Deviation Report with respect to model copy of AgreementFile: To whow so ever it may concern_0001.pdf10 Apr 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure-A_0001.pdf10 Apr 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured -unsecured_0001.pdf10 Apr 2025

How this compares with Aurangabad

14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep VENUGOPAL PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shivoor1,400+ in Aurangabad

Builder: Yashwant Mukund Kharote

Yashwant Mukund Kharote has 1 registration on MahaRERA, including VENUGOPAL PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if VENUGOPAL PARK is delayed beyond 31 Mar 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VENUGOPAL PARK?

The registered promoter entity is Yashwant Mukund Kharote, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VENUGOPAL PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VENUGOPAL PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VENUGOPAL PARK?

The professionals named in the filing: Architect: Ar Sunil Chawda; Engineer: Sudarshan Anawade; Chartered Accountant: CA Sachin Lathi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VENUGOPAL PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VENUGOPAL PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VENUGOPAL PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.