Registered No litigation declared Residential / Group Housing project

RVK ARIA WING A B

By RVK REALTY

RG-MH-59270 · RERA P52100052177 · Last updated on MahaRERA portal: 15 Oct 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 90%
12 of 24Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

RVK ARIA WING A B is a Residential / Group Housing project by RVK REALTY in Pune, Maharashtra, registered with MahaRERA as P52100052177 on 27 Jul 2023. Possession is promised by 31 Dec 2027. 12 of the 24 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.

At a glance

Project

  • NameRVK ARIA WING A B
  • TypeResidential / Group Housing
  • Location
    • VISHAL NAGAR
    • PIMPLE NILAKH
    • Haveli
    • Pune
    • 411027
  • Pincode411027
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100052177
  • ReraGenie IDRG-MH-59270

Builder

  • NameRVK REALTY
  • Entity typePartnership
  • PartnerVIVEKANAND SHANTARAM KISARKAR
  • PartnerROHAN VIVEKANAND KISARKAR
  • Other registrations3 more →
  • Completed2 of 4
  • Declared earlier projects4 →

Key dates

this monthRegisteredJul 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Jul 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed64 files

Current status

50%12 of 24 units booked

Figures as on 15 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RVK ARIA WING ANA6612012
RVK ARIA WING BNA6612012

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 15 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 90%.

RVK ARIA WING A33%
ActivityProgress
Excavation100%
Basement (if any)80%
Podiums (if any)0%
Plinth80%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
RVK ARIA WING B45%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)90%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed22

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots22
Closed/Covered22
BuildingClosed/CoveredTotal
RVK ARIA WING A1111
RVK ARIA WING B1111

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area600 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on21 Sep 2024
LandownerVillageDistrict
NANDKISHOR VISHWANATH PALAVESasewadiAhmednagar
VIDYA NANDKISHOR PALAVESasewadiAhmednagar
SUNIL TRYAMBAK AVHADPune (M Corp.)Pune
ANIL TRYAMBAK AVHADKothrudPune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI906.87
Proposed, not sanctioned907 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTILAK ROAD

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMS SHINDE JOSHI & ASSOCIATES
EngineerSUNIL MUTALIK
EngineerRAHUL SHEMBADE
Chartered AccountantANUPAMA NARENDRA SHETTY SHETTY
PartnerRole in project
RVK REALTY-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Aug 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form -1.pdf15 Oct 2025
Form 2File: Engg Form 2.PDF15 Oct 2025
Form 3File: form 3.PDF15 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY ARIA.pdf15 Oct 2025
Form 1File: Form -1.pdf17 Jul 2025
Form 2File: Form 2.PDF17 Jul 2025
Form 3File: Form -3.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY.pdf17 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RVK Aria - Form 1.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RVK Aria- Form 3.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RVK Aria -Form 2.pdf16 Apr 2025
Disclosure of sold/ booked inventoryFile: RVK Aria - DISCLOSURE OF SOLD BOOKED INVENTORY.pdf16 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: RVK Aria -Form 2A.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RVK Realty -FORM 3.pdf17 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RVK Realty-Form 1 (1) 010125 Arya.pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RVK Realty-Form 2 10125 Arya.pdf11 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD ARIA01012025.pdf11 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Arya_18102024120637.PDF18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rvk arya_17102024135315.PDF17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1- RVK REALTY.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED ARIA.pdf14 Oct 2024
Layout approvalFile: ARIA REVISE PLAN.pdf8 Aug 2024
Copy of Layout Approval (in case of layout)File: ARIA REVISE PLAN.pdf8 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: Xerox Scan_07082024105256.PDF7 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Xerox Scan_16072024151810.PDF16 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - RVK Arya.pdf12 Jul 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY - ARIA.pdf12 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RVK ARCI 11072024.pdf11 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enng 2 rvk arya.PDF10 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Rvk Engineers Certificate on Quality Assurance (Form 2A FY 2022-23).pdf18 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Rvk 3 18.PDF18 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RVK ARYA 13-04-2023.PDF13 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RVK REALTY ARIA 06-04-2024.pdf12 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RVK REALTY ARIA 06-04-2024.pdf6 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A -Aria.pdf14 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Arya.pdf8 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG NOV2023.PDF26 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG DECE2023.PDF26 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: rck ca.PDF26 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Rera aria _28112023114728.PDF28 Nov 2023
Layout approvalFile: Arya 2-08-23.pdf2 Aug 2023
Copy of Layout Approval (in case of layout)File: Arya 2-08-23.pdf2 Aug 2023
CERSAI detailsFile: Rvk no cersai_10072023164943.PDF3 Jul 2023
Details of encumbrances concerned to FinanceFile: Financial Encumbrances.pdf21 Jun 2023
Details of encumbrances concerned to LegalFile: Financial Encumbrances.pdf21 Jun 2023
Declaration in FORM BFile: Form B_22052023143838.PDF22 May 2023
Disclosure of sold/ booked inventoryFile: DOC081.pdf22 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf11 May 2023
Proforma of Agreement for saleFile: RERA Agreement Pimple Nilakh-updated 12-07-2323.pdf6 May 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER RERA - RVK .pdf6 May 2023
Layout approvalFile: Plan rvk arya_compressed final.pdf4 May 2023
Building plan approvalFile: Plan rvk arya_compressed final.pdf4 May 2023
Details of encumbrances concerned to FinanceFile: Legal en.pdf4 May 2023
Details of encumbrances concerned to LegalFile: Legal en.pdf4 May 2023
Copy of Layout Approval (in case of layout)File: Plan rvk arya_compressed final.pdf4 May 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan rvk arya_compressed final.pdf4 May 2023
Commencement Certificates / NA Order for plotted developmentFile: commencement certificate ARIA.pdf4 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Rvk Disclosure _11072023170613.PDF4 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Rvk Format A_01072023120330.PDF4 May 2023
Deviation Report with respect to Allotment letterFile: Aloutment de.pdf4 May 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to model copy of Agreement.pdf4 May 2023
PAN CardFile: PAN RVK REALTY.pdf2 May 2023
Copy of the legal title reportFile: Rvk rera s_12-07-23 23.pdf2 May 2023
Declaration about Commencement CertificateFile: rvk com.pdf2 May 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
RVK TARANGP52100047939NIGDI PRADHIKARAN PUNE, Pune-Dec 2022CompletedDec 2025Mar 2024
RVK KSHITIJP52100017003NEAR SONAL HALL KARVE ROAD, Pune11Jun 2018CompletedJun 2023Jan 2020

How this compares with Pune

50%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RVK ARIA WING A B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PIMPLE NILAKH13,700+ in Pune

2 kmRVK ARIA WING A BCompleted 65Lapsed / revoked 35Other 127Dot size: filed unitsN

Filed coordinates, straight-line distance. 227 registered projects within 2 km.

Builder: RVK REALTY

RVK REALTY has 4 registrations on MahaRERA, including KSHITIJ and RVK JANAKI. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if RVK ARIA WING A B is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RVK ARIA WING A B?

The registered promoter entity is RVK REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RVK ARIA WING A B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RVK ARIA WING A B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RVK ARIA WING A B?

The professionals named in the filing: Architect: MS SHINDE JOSHI & ASSOCIATES; Engineer: SUNIL MUTALIK; Engineer: RAHUL SHEMBADE; Chartered Accountant: ANUPAMA NARENDRA SHETTY SHETTY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RVK ARIA WING A B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RVK ARIA WING A B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RVK ARIA WING A B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.