Home / Browse projects / Mumbai Suburban, Maharashtra / Rustomjee Seasons - Wing D

Completed No litigation declared Residential / Group Housing project

Rustomjee Seasons - Wing D

By KEYSTONE REALTORS LIMITED

RG-MH-03355 · RERA P51800021028 · Last updated on MahaRERA portal: 30 Sep 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 18 other registrations.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
8 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 92%
0Complaints at MahaRERAon this registration
Jump to the 41 documents Report an error

Rustomjee Seasons - Wing D is a Residential / Group Housing project by KEYSTONE REALTORS LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800021028 on 27 May 2019. The registration is recorded completed; possession was promised by 30 Dec 2025.

At a glance

Project

  • NameRustomjee Seasons - Wing D
  • TypeResidential / Group Housing
  • Location
    • M.K. KALELKAR ROAD/ NANA DHARMADHIKARI ROAD
    • BANDRA EAST
    • Andheri
    • Mumbai Suburban
    • 400051
  • Pincode400051
  • RERA no.P51800021028
  • ReraGenie IDRG-MH-03355

Builder

  • NameKEYSTONE REALTORS LIMITED
  • Entity typeCompany
  • Other registrations18 more →
  • Completed11 of 19
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects11 →

Key dates

this monthRegisteredMay 2019PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on27 May 2019
  • Promised completion30 Dec 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed41 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PHASE- D1NA280000
PHASE D2NA280000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 30 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 92%.

PHASE- D159%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure92%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises72%
Sanitary Fittings within the flats / premises21%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks38%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.22%
PHASE D251%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure92%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises42%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks25%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities38

As on 30 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes10%
Storm Water DrainsYes10%
Landscaping & Tree PlantingYes80%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes80%
Water conservation /Rain water harvestingYes80%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Jogging/Walking Track 1.5 meter wide pathway in granite for residents to use for there morning/evYes80%
Koi Pond / Lagoon Visual water feature. A shallow water body for Koi fish & aquatic plants with iYes100%
Meandering walkway in rustic stone / earthly finish pavers that has naturalYes80%
Mini Theatre A 12 seater preview theatre with audio visual entertainment.Yes100%
Multiplay court with spectators bleachers Sports turf for futsal & cricket that can be used for pYes100%
NANoNot applicable
Outdoor Fitness Area Place where outdoor fitness stations are located for fitness enthusiastsYes100%
Rain Shower Curtain Area on the fun deck for kids to have fun under the rain shower curtain creatYes100%
Seniors Corner with Reflexology Court Space with resting benches with a separate area constructedYes100%
Spa Day spa with 2 treatment rooms, rest room facilities & salon with hair treatment & foot refleYes100%
Swimming Pool with Fun Pool for KidsYes100%
Tennis Court /Multifunction Acrylic Surface Sports surface for Tennis / Basket Ball.Yes100%
Yoga Deck Platform for practising YogaYes0%
Indoor Game Zone Space for Indoor games like pool, table tennis & board games like chess, carom &Yes100%
Gymnasium with cardio & strength equipments & rest rYes50%
Dry Fountain Fun activity for kids with multiple fountain nozzles that are placed below the deckYes100%
Creative Arts Studio Multifunctional space for all age group to pursue their passions like dance,Yes100%
Cooling Mist Pod Located near the pool deck the space is cooler as a result of foggers & mistersYes100%
Children’s Play Area Play area for kidsYes0%
BBQ Pod A space with outdoor electric BBQ facility and outdoor sitting on the pool deckYes100%
Banquet HallYes0%
Aromatic Garden Gardens with fragrant flowering plants & trees.Yes100%
Alfresco Dining SEMI covered dining area with outdoor lounge furniture (tables & chairs)Yes100%

Parking filed326

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots326
Closed/Covered326
BuildingClosed/CoveredTotal
PHASE- D1163163
PHASE D2163163

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,059 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI21075.0
Proposed, not sanctioned9,927 sq m
Buildings approved2
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch349, BUSINESS POINT BUILDING, WESTERN EXPRESS HIGHWAY, ANDHERI EAST MUMBAI 400069

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANISH D SAVANT
EngineerPRAMOD DUBEY
Chartered AccountantV M SHIMPI & ASSOCIATES
PartnerRole in project
KEYSTONE REALTORS LIMITED-

Litigation declared9

CaseCourtStatus
14044/2016HIGH COURT BOMBAYPetition is partly heard and will be listed in due course for hearing
280/2013HIGH COURT BOMBAYNotice of Motion filed by Abhinav Sahakar will be heard along with main petition
4358/2011City Civil Court at Bombayinterse dispute between family members of rehab unit matter pending
704/2016HIGH COURT BOMBAYpending for final hearing
246/2017HIGH COURT BOMBAYSUIT DISPOSED OFF BY FILING CONSENT TERMS
248/2017HIGH COURT BOMBAYSUIT DISPOSED OFF BY FILING CONSENT TERMS
IA NO 43773 OF 2020 IN SLP NO 17009 OF 2019/2020SUPREME COURT OF INDIASLP DISPOSED OFF SO IA ALSO DISPOSED
20842 /2022SUPREME COURT OF INDIAMatter is admitted and will be listed for hearing in due course
6676/2023High Court BombayPending for MHADA Reply

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 May 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 May 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 15 Mar 2023

Documents filed41

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Seasons Wing D March 2023.pdf30 Sep 2023
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 Architect Certificate Wing D.pdf12 Jul 2023
Certificates of CA (Form 3)File: Seasons D Wing Dec 2022.pdf6 Apr 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Season Full OC.pdf15 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Seasons D wing SEPT 2022.pdf30 Sep 2022
Declaration about Commencement CertificateFile: Seasons D wing 30062022.pdf1 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: AMENDED CC 1.pdf30 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: March 2022- Architect Certificate Seasons D wing.pdf29 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2- Seasons RERA.pdf29 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: March 2022- form 2A- Seasons.pdf28 Jun 2022
Building plan approvalFile: Amended Approval Dt14062022- letter.pdf14 Jun 2022
Building Plan Approval (IOD)File: Amended Approval Dt14062022- letter.pdf14 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Seasons COMPRESSED.pdf20 May 2022
Proforma of Allotment letterFile: REVISED AFS 8122021.pdf8 Dec 2021
Details of encumbrancesFile: revised LnT encumbrance certificate.pdf7 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Seasons D.pdf30 Sep 2021
Building plan approvalFile: Letter dt 12072021.pdf21 Aug 2021
Building Plan Approval (IOD)File: Letter dt 12072021.pdf21 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: Further CC Wing D dt 15072021.pdf16 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: Seasons CC 01062021 UPLOAD.pdf1 Jun 2021
Building plan approvalFile: Amended Letter upload.pdf27 May 2021
Building Plan Approval (IOD)File: Amended Letter upload.pdf27 May 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Season D Wing.pdf30 Sep 2020
Engineers Certificate on Quality Assurance (Form 2A)File: Seasons Wing D.pdf13 Feb 2020
Engineers Certificate on Quality Assurance (Form 2A)File: Seasons Wing D.pdf18 Jan 2020
Engineers Certificate on Quality Assurance (Form 2A)File: seasons D wing.pdf24 Oct 2019
Commencement Certificates / NA Order for plotted developmentFile: group 4- revised approval dtd 10-05-2019(1).pdf17 Sep 2019
Building plan approvalFile: reduced size Seasons IOD.pdf14 May 2019
Layout approvalFile: plan 1.pdf14 May 2019
Layout approvalFile: plan 2.pdf14 May 2019
Layout approvalFile: plan 3.pdf14 May 2019
Copy of the legal title reportFile: title certificate.pdf14 May 2019
Details of encumbrancesFile: encumbrance certificate dtd 2-5-19.pdf14 May 2019
Copy of Layout Approval (in case of layout)File: plan 1.pdf14 May 2019
Copy of Layout Approval (in case of layout)File: plan 2.pdf14 May 2019
Copy of Layout Approval (in case of layout)File: plan 3.pdf14 May 2019
Building Plan Approval (IOD)File: reduced size Seasons IOD.pdf14 May 2019
Commencement Certificates / NA Order for plotted developmentFile: 2170103_furthercc_signed.pdf14 May 2019
Declaration in FORM BFile: form b- abhishek.pdf14 May 2019
Certificates of CA (Form 3)File: CA certificate dtd 16-5-19.pdf14 May 2019
Proforma of Allotment letterFile: AFS of F wing for RERA.pdf14 May 2019

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
ELITADN Nagar Muncipal School Road Gharkul Society Indira Nagar Four Bungalows Andheri West Mumbai-400053169CompletedJan 2016Late, Feb 2016
Rustomjee SangamJunction of S V Road and Sai Baba Road Santacruz West Mumbai-40005467CompletedFeb 2014Late, Sep 2014
Rustomjee OrianaRoad Number 7 Gandhi Nagar Bandra East Mumbai-400051140CompletedDec 2013Late, Nov 2015

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Rustomjee Seasons - Wing D on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BANDRA EAST6,700+ in Mumbai Suburban

Builder: KEYSTONE REALTORS LIMITED

KEYSTONE REALTORS LIMITED has 19 registrations on MahaRERA, including Rustomjee Seasons - Wing B and Rustomjee Seasons - Wing C. Its filings disclose 11 earlier MahaRERA projects: declares 6 of 11 past projects completed on time. Litigation is declared on 6 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Rustomjee Seasons - Wing D is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Rustomjee Seasons - Wing D?

The registered promoter entity is KEYSTONE REALTORS LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Rustomjee Seasons - Wing D?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Rustomjee Seasons - Wing D?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Rustomjee Seasons - Wing D?

The professionals named in the filing: Architect: MANISH D SAVANT; Engineer: PRAMOD DUBEY; Chartered Accountant: V M SHIMPI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Rustomjee Seasons - Wing D?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Rustomjee Seasons - Wing D. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Rustomjee Seasons - Wing D to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.