ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Runwal Forests Tower 5-8

Completed No litigation declared Residential / Group Housing project

Runwal Forests Tower 5-8

By Wheelabrator Alloy Castings Limited

RG-MH-09897 · RERA P51800001838 · Last updated on MahaRERA portal: 16 Apr 2025

Source: official MahaRERA filing

Red flags

  • 25 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
44 of 44Construction stages doneacross 4 buildings; every applicable stage filed complete
25Complaints at MahaRERAon this registration
Jump to the 741 documents Report an error

Runwal Forests Tower 5-8 is a Residential / Group Housing project by Wheelabrator Alloy Castings Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800001838 on 29 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2022. 25 complaints are on record with the regulator.

At a glance

Project

  • NameRunwal Forests Tower 5-8
  • TypeResidential / Group Housing
  • Location
    • LBS Marg
    • Bhandup(W)
    • Kurla
    • Mumbai Suburban
    • 400078
  • Pincode400078
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800001838
  • ReraGenie IDRG-MH-09897

Builder

  • NameWheelabrator Alloy Castings Limited
  • Entity typeCompany
  • DirectorLucy Roychoudhury
  • Other registrations2 more →
  • Completed2 of 3

Key dates

this monthRegisteredJul 2017PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on29 Jul 2017
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings4 building records
  • Documents filed741 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower -5NA410000
Tower -6NA410000
Tower-7NA410000
Tower-8NA540000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 16 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

44 of 44 construction stages are filed complete across 4 buildings.

Tower -5100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Tower -6100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Tower-7100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Tower-8100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities31

As on 16 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes78%
Water SupplyYes65%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes31%
Storm Water DrainsYes64%
Landscaping & Tree PlantingYes38%
Street LightingYes80%
Community BuildingsYes15%
Treatment And Disposal Of Sewage And Sullage WaterYes45%
Solid Waste Management And DisposalYes80%
Water conservation /Rain water harvestingYes80%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes67%
Aggregate area of recreational Open SpaceYes50%
Open ParkingNoNot applicable
Zen gardenYes0%
Common BasementYes100%
Common Car ParkingYes60%
Cricket pitchYes0%
Dedicated children play areaYes0%
DG Backup for critical and Emergency ServicesYes100%
Jogging / running track / Cycling TrackYes0%
Yoga ZoneYes0%
Water bodiesYes0%
Swimming Pool No 3Yes0%
Swimming Pool No 2 Kids PoolYes0%
Swimming pool 1Yes0%
Skating rinkYes0%
Senior citizen areaYes0%
Putting greenYes0%
Open air GymnasiumYes0%

Parking filed428

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots428
Closed/Covered428
BuildingClosed/CoveredTotal
Tower -5144144
Tower -6142142
Tower-7142142

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,819 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Runwal Real Estates Private LimitedKurlaMumbai Suburban

Approvals and building plan

Permissible FSI53262.47
Proposed, not sanctioned52,311 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSion East, Mumbai

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAakar Architects & Consultants
EngineerEpicons Consultant Pvt. Ltd. Structural Architect
PartnerRole in project
Wheelabrator Alloy Castings Limited-

Litigation declared8

CaseCourtStatus
WP No 2182/2007/2007HIGH COURT BOMBAYPENDING
132/2017 L 181/2016/2017HIGH COURT BOMBAYPENDING
WP L 2613/2007/2007HIGH COURT BOMBAYPENDING
CCL/526/2017 in Suit No 132/2017/2017HIGH COURT BOMBAYPENDING
AT006000000010445 /2018Maharera Appellate Tribunalpending
Ref No 164 of 2018/2018Labour Court Thanepending
WRIT PETITION L NO 424 OF 2019/2019HIGH COURT OF JUDICATURE AT BOMBAYpending
CC006000000194065/2020Maharera Authoritypending

Complaints filed with MahaRERA25

Case no.ComplainantRespondentFiled
CC006000000056828Mr. Kamal Rai & Mrs Tanvi Raiwheelabrotor alloy castings limited03/11/2018
CC006000000001671Rupesh PawarRUNWAL DEVELOPERS04/11/2017
CC006000000023068Uday KalghutkarRunwal Group22/01/2018
CC006000000023387PRADEEP KUMAR PRASAD AND INDRA DEVI K. PRASADWheelabrator Alloy Castings Limited25/02/2018
CC006000000023632Manish PoojarySuchita Shetty08/03/2018
CC006000000171903Pankaj Agrawal & Deepti AgrawalWheelabrator Alloy Castings Limited18/12/2019
CC006000000193466Sweta Sharma/Santosh SharmaSandeep Runwal / Chetan Pathare12/07/2020
CC006000000197462Mukesh Bansal & Minakshi Bansal through V Juris, The Law OfficesWHEELABRATOR ALLOY CASTINGSLIMITED& AXIS BANK03/07/2021
CC006000000194065Mr. Yogesh Bhagwan Kale and Mrs Kanchan Yogesh KaleWheelabrator Alloy Casting Limited (Runwal Forest)19/09/2020
CC006000000195119K P VargheseWheelabrator Alloy Castings Limited04/12/2020
CC006000000195572Mrs. Marlin Varghese KadaWheelabrator Alloy Castings Limited09/01/2021
CC006000000195429Mangala Naresh SinhaWheelabrator Alloy Castings Ltd.07/01/2021
CC006000000195551Mangala Naresh SinhaWheelabrator Alloy Castings Ltd.07/01/2021
CC006000000195784Vinit Kumar Sinha & Neha PrashantWheelabrator Alloys Castings09/02/2021
CC006000000197002vikas and neena guptaWheelabrator Alloy Castings Ltd16/05/2021
CC006000000198279Ms. Nirmala, Mr. Anshul and Ms. Amrita KhandelwalWheelabrator Alloy Castings Limited07/09/2021
CC006000000220658Abbas Hussain ZaidyWheelabrator Alloy Castings Limited19/04/2022
CC006000000251637Jitendra Bhaskar PawarM/S. WHEELABRATOR ALLOY CASTINGS LIMITED29/06/2022
CC006000000251649Prashant Arvind GordeWHEELABRATOR ALLOY CASTINGS LIMITED29/06/2022
CC006000000292220Santosh Gangadas ChintalWheelabrator Alloy Castings Limited05/08/2022
CC006000000303019Santosh KumarWheelabrator Alloy Casting Limited27/10/2022
CC006000000303376manchali narayanrunwal forest19/11/2022
CC006000000303427Nalin JainWheelabrartor Alloy Castings Ltd.25/11/2022
CC006000000479842Runwal Forests Co-Operative Housing Society Ltd (Tower 5,6,7)M/s Wheelabrator Alloy Castings Ltd02/04/2024
CC12503374Wheelabrator Alloy Castings LimitedROHINTON NAVDER22/09/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Feb 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Jul 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 23 Jan 2023

Documents filed741

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 741 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: Runwal Forest 5 to 8_11zon.pdf16 Apr 2025
Disclosure of sold/ booked inventoryFile: Forest 5-8_11zon.pdf18 Jan 2025
Disclosure of sold/ booked inventoryFile: Forest_Cluster_2_Sep24_11zon.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: Runwal Forest - T5 to T8 - as on 30 June 2024_11zon.pdf11 Jul 2024
Disclosure of sold/ booked inventoryFile: Runwal Forest - Cluster 2_11zon.pdf17 Apr 2024
Disclosure of sold/ booked inventoryFile: Runwal Forest - Cluster 2_11zon.pdf17 Apr 2024
Disclosure of sold/ booked inventoryFile: Runwal Forest - Cluster 2_11zon.pdf17 Apr 2024
Building plan approvalFile: Basement 1.pdf14 Mar 2024
Building plan approvalFile: Basement 2.pdf14 Mar 2024
Building plan approvalFile: Basement 3.pdf14 Mar 2024
Building plan approvalFile: MYSCAN_20240229_0001_Page_02.pdf14 Mar 2024
Building plan approvalFile: MYSCAN_20240229_0001_Page_03.pdf14 Mar 2024
Building plan approvalFile: MYSCAN_20240229_0001_Page_04.pdf14 Mar 2024
Building plan approvalFile: MYSCAN_20240229_0001_Page_45.pdf14 Mar 2024
Building plan approvalFile: MYSCAN_20240229_0001_Page_47.pdf14 Mar 2024
Building plan approvalFile: MYSCAN_20240229_0001_Page_24.pdf14 Mar 2024
Building plan approvalFile: MYSCAN_20240229_0001_Page_25.pdf14 Mar 2024
Building plan approvalFile: MYSCAN_20240229_0001_Page_26.pdf14 Mar 2024
Building plan approvalFile: MYSCAN_20240229_0001_Page_28.pdf14 Mar 2024
Building plan approvalFile: MYSCAN_20240229_0001_Page_29.pdf14 Mar 2024
Building plan approvalFile: MYSCAN_20240229_0001_Page_31.pdf14 Mar 2024
Building plan approvalFile: MYSCAN_20240229_0001_Page_34.pdf14 Mar 2024
Building plan approvalFile: MYSCAN_20240229_0001_Page_28.pdf14 Mar 2024
Building plan approvalFile: MYSCAN_20240229_0001_Page_30.pdf14 Mar 2024
Building plan approvalFile: MYSCAN_20240229_0001_Page_34.pdf14 Mar 2024
Building plan approvalFile: MYSCAN_20240229_0001_Page_34.pdf14 Mar 2024
Building plan approvalFile: MYSCAN_20240229_0001_Page_44.pdf14 Mar 2024
Building plan approvalFile: MYSCAN_20240229_0001_Page_46.pdf14 Mar 2024
Building plan approvalFile: IOD - 5 March 2024.pdf14 Mar 2024
Building Plan Approval (IOD)File: Basement 1.pdf14 Mar 2024
Building Plan Approval (IOD)File: Basement 2.pdf14 Mar 2024
Building Plan Approval (IOD)File: Basement 3.pdf14 Mar 2024
Building Plan Approval (IOD)File: MYSCAN_20240229_0001_Page_02.pdf14 Mar 2024
Building Plan Approval (IOD)File: MYSCAN_20240229_0001_Page_03.pdf14 Mar 2024
Building Plan Approval (IOD)File: MYSCAN_20240229_0001_Page_04.pdf14 Mar 2024
Building Plan Approval (IOD)File: MYSCAN_20240229_0001_Page_45.pdf14 Mar 2024
Building Plan Approval (IOD)File: MYSCAN_20240229_0001_Page_47.pdf14 Mar 2024
Building Plan Approval (IOD)File: MYSCAN_20240229_0001_Page_24.pdf14 Mar 2024
Building Plan Approval (IOD)File: MYSCAN_20240229_0001_Page_25.pdf14 Mar 2024
Building Plan Approval (IOD)File: MYSCAN_20240229_0001_Page_26.pdf14 Mar 2024
Building Plan Approval (IOD)File: MYSCAN_20240229_0001_Page_28.pdf14 Mar 2024
Building Plan Approval (IOD)File: MYSCAN_20240229_0001_Page_29.pdf14 Mar 2024
Building Plan Approval (IOD)File: MYSCAN_20240229_0001_Page_31.pdf14 Mar 2024
Building Plan Approval (IOD)File: MYSCAN_20240229_0001_Page_34.pdf14 Mar 2024
Building Plan Approval (IOD)File: MYSCAN_20240229_0001_Page_28.pdf14 Mar 2024
Building Plan Approval (IOD)File: MYSCAN_20240229_0001_Page_30.pdf14 Mar 2024
Building Plan Approval (IOD)File: MYSCAN_20240229_0001_Page_34.pdf14 Mar 2024
Building Plan Approval (IOD)File: MYSCAN_20240229_0001_Page_34.pdf14 Mar 2024
Building Plan Approval (IOD)File: MYSCAN_20240229_0001_Page_44.pdf14 Mar 2024
Building Plan Approval (IOD)File: MYSCAN_20240229_0001_Page_46.pdf14 Mar 2024
Building Plan Approval (IOD)File: IOD - 5 March 2024.pdf14 Mar 2024
Disclosure of sold/ booked inventoryFile: Runwal Forest -5-8 - 31 December 2023_11zon.pdf6 Jan 2024
Certificates of CA (Form 3)File: Form 3 Runwal Forests T5 -T8 - 30 June 2022.pdf18 Nov 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Runwal Forest Tower 8 Registration Certificate - 6 November 2023.pdf9 Nov 2023
Building plan approvalFile: Basement 1.pdf3 Nov 2023
Building plan approvalFile: Basement 2.pdf3 Nov 2023
Building plan approvalFile: Basement 3.pdf3 Nov 2023
Building plan approvalFile: AA_Page_01.pdf3 Nov 2023
Building plan approvalFile: AA_Page_02.pdf3 Nov 2023
Building plan approvalFile: AA_Page_03.pdf3 Nov 2023
Building plan approvalFile: AA_Page_04.pdf3 Nov 2023
Building plan approvalFile: AA_Page_47.pdf3 Nov 2023
Building plan approvalFile: AA_Page_24.pdf3 Nov 2023
Building plan approvalFile: AA_Page_25.pdf3 Nov 2023
Building plan approvalFile: AA_Page_26.pdf3 Nov 2023
Building plan approvalFile: AA_Page_44.pdf3 Nov 2023
Building plan approvalFile: AA_Page_24.pdf3 Nov 2023
Building plan approvalFile: AA_Page_25.pdf3 Nov 2023
Building plan approvalFile: AA_Page_44.pdf3 Nov 2023
Building plan approvalFile: AA_Page_27.pdf3 Nov 2023
Building plan approvalFile: AA_Page_28.pdf3 Nov 2023
Building plan approvalFile: AA_Page_29.pdf3 Nov 2023
Building plan approvalFile: AA_Page_29.pdf3 Nov 2023
Building plan approvalFile: AA_Page_44.pdf3 Nov 2023
Building plan approvalFile: AA_Page_30.pdf3 Nov 2023
Building plan approvalFile: AA_Page_31.pdf3 Nov 2023
Building plan approvalFile: AA_Page_34.pdf3 Nov 2023
Building plan approvalFile: AA_Page_44.pdf3 Nov 2023
Building Plan Approval (IOD)File: Basement 1.pdf3 Nov 2023
Building Plan Approval (IOD)File: Basement 2.pdf3 Nov 2023

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Runwal Forests Tower 5-8 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhandup(W)6,700+ in Mumbai Suburban

2 kmRunwal Forests Tower 5-8Completed 39Lapsed / revoked 23Other 78Dot size: filed unitsN

Filed coordinates, straight-line distance. 140 registered projects within 2 km.

Builder: Wheelabrator Alloy Castings Limited

Wheelabrator Alloy Castings Limited has 3 registrations on MahaRERA, including Runwal Forest Tower 1-4 and Runwal Forests Tower 5-8. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Runwal Forests Tower 5-8 is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Runwal Forests Tower 5-8?

The registered promoter entity is Wheelabrator Alloy Castings Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Runwal Forests Tower 5-8?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Runwal Forests Tower 5-8?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Runwal Forests Tower 5-8?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Runwal Forests Tower 5-8?

The professionals named in the filing: Architect: Aakar Architects & Consultants; Engineer: Epicons Consultant Pvt. Ltd. Structural Architect. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Runwal Forests Tower 5-8?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Runwal Forests Tower 5-8. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Runwal Forests Tower 5-8 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.