ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / RUNWAL ANTHURIUM - VALENTINE

Registration lapsed Litigation declared Residential / Group Housing project

RUNWAL ANTHURIUM - VALENTINE

By Runwal Developers Ltd

RG-MH-23934 · RERA P51800008477 · Last updated on MahaRERA portal: 5 May 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 34 months past the filed date
  • Litigation declared, 2 cases
  • 1 complaint at MahaRERA
  • Completion date moved by 60 months
  • 2 extensions taken

Clear

  • Separate project account declared
  • Allotment letter follows the model form

6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2023Possession promised34 months past this date
11 of 11Construction stages doneevery applicable stage filed complete
1Complaints at MahaRERAon this registration
Jump to the 193 documents Report an error

RUNWAL ANTHURIUM - VALENTINE is a Residential / Group Housing project by Runwal Developers Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800008477 on 19 Aug 2017. Possession was promised by 31 Dec 2023 and is now 34 months past that date. The completion date has moved by 60 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameRUNWAL ANTHURIUM - VALENTINE
  • TypeResidential / Group Housing
  • Location
    • LBS Marg
    • Mulund
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800008477
  • ReraGenie IDRG-MH-23934

Builder

  • NameRunwal Developers Ltd
  • Entity typeCompany
  • CINU70100MH1988PLC046631
  • GSTIN27AAACR0395J1Z8
  • DirectorsSANJAY DAGA, PALLAVI MATKARI, KISHORKUMAR JAIN
  • Other registrations3 more →
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

34 months past promisethis monthRegisteredAug 2017First promiseDec 2018Revised toDec 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on19 Aug 2017
  • Promised completion31 Dec 2023
  • Revised completionRevised to 31 Dec 2023 (originally 31 Dec 2018)
  • Buildings1 building record
  • Documents filed193 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING 5 - VALENTINENA410000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

BUILDING 5 - VALENTINE: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 5 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed296

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots296
Closed/Covered222
Open Space74

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,955 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI13615.7
Proposed, not sanctioned13,616 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop no 9 Mary Land Corner Sion Mumbai 400 022

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPALLAVI MATKARI
EngineerSanjay Singh
Chartered AccountantS P Gunjal & Associates
Chartered AccountantM B AGRAWAL AND CO
PartnerRole in project
Runwal Developers Ltd-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800011862Dec 2018 → Dec 2023

Reason as filed by the promoterThe project "Runwal Anthurium- Valentine" has been completed in all aspect. The project/building is granted Part Occupancy Certificate dated 12th March 2019 by Municipal Corporation of Greater Mumbai except for one flat no.1 at 33rd floor of the building. Now full Occupancy Certificate is awaited. Meanwhile we hereby requesting Hon'ble MahaRERA Authority to extend the date of Completion of the Project till 31/12/2023

EXT51800000930Dec 2018 → Dec 2019

Reason as filed by the promoterWe, have registered our project “Runwal Anthurium - Valentine ” (hereinafter referred to as the said Project) on the RERA Website bearing Registration No.51900008477 on 19th August 2017. The “Revised Proposed Date of Completion” while registering the said Project was mentioned on RERA Website as 31/12/2018 for the completion of the project. We have completed the entire construction and completed the finishing works of the said Project and have applied for CFO NOC required for obtaining Occupation Certificate in respect of the said Project. We hereby confirm that we shall endeavor to obtain the

Litigation declared2

CaseCourtStatus
Writ petition No 4977/2015High Court of Bombaypending
4977/2015High Court BombayOngoing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000000533GANESH KALYANASUNDARAMRUNWAL DEVELOPERS PVT LTD10/09/2017

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 10 Aug 2020

Documents filed193

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 193 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf5 May 2025
Disclosure of sold/ booked inventoryFile: Sold unsold.pdf5 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf18 Apr 2025
Certificates of CA (Form 3)File: Form 3.pdf18 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 DEC 24.pdf27 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec 2024.pdf27 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23 24.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Dec 2024.pdf23 Jan 2025
Certificates of CA (Form 3)File: Form 3 Dec 2024.pdf21 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023 2024.pdf17 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sep 2024.pdf25 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: From 1 Sep 2024.pdf22 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Sep 2024.pdf21 Oct 2024
Certificates of CA (Form 3)File: Form 3 Sep 2024.pdf18 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 June 2024.pdf22 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory June 2024.pdf22 Jul 2024
Certificates of CA (Form 3)File: Form 3 June 2024.pdf22 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 June 2024.pdf19 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 2024.pdf24 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: From 1 March 2024.pdf22 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory March 2024.pdf20 Apr 2024
Certificates of CA (Form 3)File: Form 3 March 2024.pdf19 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Anthurim 31 12 2023.pdf23 Feb 2024
Details of encumbrances concerned to FinanceFile: Legal encumbrance.pdf14 Feb 2024
Details of encumbrances concerned to FinanceFile: Finace encumbrance.pdf14 Feb 2024
Details of encumbrances concerned to LegalFile: Legal encumbrance.pdf14 Feb 2024
Details of encumbrances concerned to LegalFile: Finace encumbrance.pdf14 Feb 2024
Declaration in FORM BFile: From B 5 02 2024 extention.pdf14 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf23 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf23 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf23 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf19 Jan 2024
Certificates of CA (Form 3)File: Form 3 compressed.pdf18 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf16 Nov 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold 30 09 2023.pdf26 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 30-9-23.pdf23 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 30 09 2023.pdf23 Oct 2023
Home Buyer /Allottee Grievance Redressal CellFile: Declaration Anthurium.pdf23 Oct 2023
Certificates of CA (Form 3)File: Form 3 Anthurium 30 Sept 2023.pdf19 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Anthurium as on 30 06 2023.pdf21 Jul 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold list of Anthurium as on 30 06 23.pdf21 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Anthurium as on 30 June 2023.pdf20 Jul 2023
Certificates of CA (Form 3)File: Form 3 Anthurium as on 30 06 2023.pdf20 Jul 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Anthurium 31 03 2023.pdf21 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate Runwal Anthurium 31 03 2023.pdf20 Apr 2023
Certificates of CA (Form 3)File: Form 3 CA certificate Anthurium 31 03 2023.pdf20 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate of 31 03 2023.pdf19 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Anthurium Form 1.pdf20 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Anthurium Engineers Certificate.pdf20 Jan 2023
Disclosure of sold/ booked inventoryFile: Anthurium sold and unsold.pdf19 Jan 2023
Certificates of CA (Form 3)File: Form 3 Anthurium.pdf16 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Anthurium March 2021 ot 2022.pdf29 Nov 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Anthurium Sep 2022.pdf19 Oct 2022
Disclosure of sold/ booked inventoryFile: sold unsold Anthurium Sep 2022.pdf19 Oct 2022
Certificates of CA (Form 3)File: Form 3 Anthurium Sep 2022.pdf19 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANTHURIUM_Sept 22.pdf15 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CA Certificate-Form-3-30-09-17.pdf3 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CA Certificate-Form-3-31-12-17.pdf3 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CA Certificate-Form-3-31-03-18.pdf3 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CA Certificate-Form-3-30-09-18.pdf3 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CA Certificate-Form-3-31-03-19.pdf3 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CA Certificate-Form-3-30-06-19.pdf3 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CA Certificate-Form-3-30-09-19.pdf3 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CA Certificate-Form-3-31-12-19.pdf3 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CA Certificate-Form-3-31-03-20.pdf3 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CA Certificate-Form-3-30-06-20.pdf3 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CA Certificate-Form-3-30-09-20.pdf3 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CA Certificate-Form-3-31-12-20.pdf3 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CA Certificate-Form-3-31-03-21.pdf3 Sep 2022
Certificates of CA (Form 3)File: CA Certificate-Form-3-30-09-17.pdf3 Sep 2022
Certificates of CA (Form 3)File: CA Certificate-Form-3-31-12-17.pdf3 Sep 2022
Certificates of CA (Form 3)File: CA Certificate-Form-3-31-03-18.pdf3 Sep 2022
Certificates of CA (Form 3)File: CA Certificate-Form-3-30-09-18.pdf3 Sep 2022
Certificates of CA (Form 3)File: CA Certificate-Form-3-31-12-18.pdf3 Sep 2022
Certificates of CA (Form 3)File: CA Certificate-Form-3-30-06-19.pdf3 Sep 2022
Certificates of CA (Form 3)File: CA Certificate-Form-3-30-09-19.pdf3 Sep 2022
Certificates of CA (Form 3)File: CA Certificate-Form-3-31-03-19.pdf3 Sep 2022
Certificates of CA (Form 3)File: CA Certificate-Form-3-31-12-19.pdf3 Sep 2022
Certificates of CA (Form 3)File: CA Certificate-Form-3-31-03-20.pdf3 Sep 2022
Certificates of CA (Form 3)File: CA Certificate-Form-3-30-06-20.pdf3 Sep 2022

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Runwal Anthurium Gemini, Limona, Ramona and R SquareOld Gabriel Factory L B S Marg Mulund West Mumbai436CompletedDec 2015Late, Mar 2016
Runwal SymphonyVakola Santacruz East Mumbai90CompletedDec 2012Late, Mar 2016

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 60 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RUNWAL ANTHURIUM - VALENTINE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mulund6,700+ in Mumbai Suburban

2 kmRUNWAL ANTHURIUM - VALENCompleted 85Lapsed / revoked 62Other 116Dot size: filed unitsN

Filed coordinates, straight-line distance. 263 registered projects within 2 km.

Builder: Runwal Developers Ltd

Runwal Developers Ltd has 4 registrations on MahaRERA, including RUNWAL ANTHURIUM - VALENTINE and Nirvana Part I. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that RUNWAL ANTHURIUM - VALENTINE shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if RUNWAL ANTHURIUM - VALENTINE is delayed beyond 31 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RUNWAL ANTHURIUM - VALENTINE?

The registered promoter entity is Runwal Developers Ltd, a company as per the filing. Its CIN U70100MH1988PLC046631 and GSTIN 27AAACR0395J1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RUNWAL ANTHURIUM - VALENTINE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against RUNWAL ANTHURIUM - VALENTINE?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for RUNWAL ANTHURIUM - VALENTINE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RUNWAL ANTHURIUM - VALENTINE?

The professionals named in the filing: Architect: PALLAVI MATKARI; Engineer: Sanjay Singh; Chartered Accountant: S P Gunjal & Associates; Chartered Accountant: M B AGRAWAL AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RUNWAL ANTHURIUM - VALENTINE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RUNWAL ANTHURIUM - VALENTINE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RUNWAL ANTHURIUM - VALENTINE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.