Home / Browse projects / Mumbai Suburban, Maharashtra / RUNWAL ANTHURIUM - VALENTINE
RUNWAL ANTHURIUM - VALENTINE
RG-MH-23934 · RERA P51800008477 · Last updated on MahaRERA portal: 5 May 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 34 months past the filed date
- Litigation declared, 2 cases
- 1 complaint at MahaRERA
- Completion date moved by 60 months
- 2 extensions taken
Clear
- Separate project account declared
- Allotment letter follows the model form
6 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RUNWAL ANTHURIUM - VALENTINE is a Residential / Group Housing project by Runwal Developers Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800008477 on 19 Aug 2017. Possession was promised by 31 Dec 2023 and is now 34 months past that date. The completion date has moved by 60 months from the original filing. 1 complaint is on record with the regulator.
At a glance
Project
- NameRUNWAL ANTHURIUM - VALENTINE
- TypeResidential / Group Housing
- Location
- LBS Marg
- Mulund
- Kurla
- Mumbai Suburban
- 400080
- Pincode400080
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800008477
- ReraGenie IDRG-MH-23934
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on19 Aug 2017
- Promised completion31 Dec 2023
- Revised completionRevised to 31 Dec 2023 (originally 31 Dec 2018)
- Buildings1 building record
- Documents filed193 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING 5 - VALENTINE | NA | 41 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 5 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
BUILDING 5 - VALENTINE: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 5 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed296
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PALLAVI MATKARI |
| Engineer | Sanjay Singh |
| Chartered Accountant | S P Gunjal & Associates |
| Chartered Accountant | M B AGRAWAL AND CO |
| Partner | Role in project |
|---|---|
| Runwal Developers Ltd | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe project "Runwal Anthurium- Valentine" has been completed in all aspect. The project/building is granted Part Occupancy Certificate dated 12th March 2019 by Municipal Corporation of Greater Mumbai except for one flat no.1 at 33rd floor of the building. Now full Occupancy Certificate is awaited. Meanwhile we hereby requesting Hon'ble MahaRERA Authority to extend the date of Completion of the Project till 31/12/2023
Reason as filed by the promoterWe, have registered our project “Runwal Anthurium - Valentine ” (hereinafter referred to as the said Project) on the RERA Website bearing Registration No.51900008477 on 19th August 2017. The “Revised Proposed Date of Completion” while registering the said Project was mentioned on RERA Website as 31/12/2018 for the completion of the project. We have completed the entire construction and completed the finishing works of the said Project and have applied for CFO NOC required for obtaining Occupation Certificate in respect of the said Project. We hereby confirm that we shall endeavor to obtain the
Litigation declared2
| Case | Court | Status |
|---|---|---|
| Writ petition No 4977/2015 | High Court of Bombay | pending |
| 4977/2015 | High Court Bombay | Ongoing |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000000533 | GANESH KALYANASUNDARAM | RUNWAL DEVELOPERS PVT LTD | 10/09/2017 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 10 Aug 2020
Documents filed193
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 193 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 5 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold unsold.pdf | 5 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 18 Apr 2025 |
| Certificates of CA (Form 3)File: Form 3.pdf | 18 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 DEC 24.pdf | 27 Jan 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Dec 2024.pdf | 27 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23 24.pdf | 24 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Dec 2024.pdf | 23 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 Dec 2024.pdf | 21 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023 2024.pdf | 17 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Sep 2024.pdf | 25 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: From 1 Sep 2024.pdf | 22 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Sep 2024.pdf | 21 Oct 2024 |
| Certificates of CA (Form 3)File: Form 3 Sep 2024.pdf | 18 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 June 2024.pdf | 22 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory June 2024.pdf | 22 Jul 2024 |
| Certificates of CA (Form 3)File: Form 3 June 2024.pdf | 22 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 June 2024.pdf | 19 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 March 2024.pdf | 24 Apr 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: From 1 March 2024.pdf | 22 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory March 2024.pdf | 20 Apr 2024 |
| Certificates of CA (Form 3)File: Form 3 March 2024.pdf | 19 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Anthurim 31 12 2023.pdf | 23 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: Legal encumbrance.pdf | 14 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: Finace encumbrance.pdf | 14 Feb 2024 |
| Details of encumbrances concerned to LegalFile: Legal encumbrance.pdf | 14 Feb 2024 |
| Details of encumbrances concerned to LegalFile: Finace encumbrance.pdf | 14 Feb 2024 |
| Declaration in FORM BFile: From B 5 02 2024 extention.pdf | 14 Feb 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 23 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf | 23 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 23 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 19 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 compressed.pdf | 18 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.pdf | 16 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold 30 09 2023.pdf | 26 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 30-9-23.pdf | 23 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 30 09 2023.pdf | 23 Oct 2023 |
| Home Buyer /Allottee Grievance Redressal CellFile: Declaration Anthurium.pdf | 23 Oct 2023 |
| Certificates of CA (Form 3)File: Form 3 Anthurium 30 Sept 2023.pdf | 19 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Anthurium as on 30 06 2023.pdf | 21 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold list of Anthurium as on 30 06 23.pdf | 21 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Anthurium as on 30 June 2023.pdf | 20 Jul 2023 |
| Certificates of CA (Form 3)File: Form 3 Anthurium as on 30 06 2023.pdf | 20 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Anthurium 31 03 2023.pdf | 21 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate Runwal Anthurium 31 03 2023.pdf | 20 Apr 2023 |
| Certificates of CA (Form 3)File: Form 3 CA certificate Anthurium 31 03 2023.pdf | 20 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Architect Certificate of 31 03 2023.pdf | 19 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Anthurium Form 1.pdf | 20 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Anthurium Engineers Certificate.pdf | 20 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Anthurium sold and unsold.pdf | 19 Jan 2023 |
| Certificates of CA (Form 3)File: Form 3 Anthurium.pdf | 16 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Anthurium March 2021 ot 2022.pdf | 29 Nov 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Anthurium Sep 2022.pdf | 19 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: sold unsold Anthurium Sep 2022.pdf | 19 Oct 2022 |
| Certificates of CA (Form 3)File: Form 3 Anthurium Sep 2022.pdf | 19 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ANTHURIUM_Sept 22.pdf | 15 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CA Certificate-Form-3-30-09-17.pdf | 3 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CA Certificate-Form-3-31-12-17.pdf | 3 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CA Certificate-Form-3-31-03-18.pdf | 3 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CA Certificate-Form-3-30-09-18.pdf | 3 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CA Certificate-Form-3-31-03-19.pdf | 3 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CA Certificate-Form-3-30-06-19.pdf | 3 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CA Certificate-Form-3-30-09-19.pdf | 3 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CA Certificate-Form-3-31-12-19.pdf | 3 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CA Certificate-Form-3-31-03-20.pdf | 3 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CA Certificate-Form-3-30-06-20.pdf | 3 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CA Certificate-Form-3-30-09-20.pdf | 3 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CA Certificate-Form-3-31-12-20.pdf | 3 Sep 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: CA Certificate-Form-3-31-03-21.pdf | 3 Sep 2022 |
| Certificates of CA (Form 3)File: CA Certificate-Form-3-30-09-17.pdf | 3 Sep 2022 |
| Certificates of CA (Form 3)File: CA Certificate-Form-3-31-12-17.pdf | 3 Sep 2022 |
| Certificates of CA (Form 3)File: CA Certificate-Form-3-31-03-18.pdf | 3 Sep 2022 |
| Certificates of CA (Form 3)File: CA Certificate-Form-3-30-09-18.pdf | 3 Sep 2022 |
| Certificates of CA (Form 3)File: CA Certificate-Form-3-31-12-18.pdf | 3 Sep 2022 |
| Certificates of CA (Form 3)File: CA Certificate-Form-3-30-06-19.pdf | 3 Sep 2022 |
| Certificates of CA (Form 3)File: CA Certificate-Form-3-30-09-19.pdf | 3 Sep 2022 |
| Certificates of CA (Form 3)File: CA Certificate-Form-3-31-03-19.pdf | 3 Sep 2022 |
| Certificates of CA (Form 3)File: CA Certificate-Form-3-31-12-19.pdf | 3 Sep 2022 |
| Certificates of CA (Form 3)File: CA Certificate-Form-3-31-03-20.pdf | 3 Sep 2022 |
| Certificates of CA (Form 3)File: CA Certificate-Form-3-30-06-20.pdf | 3 Sep 2022 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Runwal Anthurium Gemini, Limona, Ramona and R Square | Old Gabriel Factory L B S Marg Mulund West Mumbai | 436 | Completed | Dec 2015 | Late, Mar 2016 |
| Runwal Symphony | Vakola Santacruz East Mumbai | 90 | Completed | Dec 2012 | Late, Mar 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 6 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 193 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep RUNWAL ANTHURIUM - VALENTINE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mulund6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 263 registered projects within 2 km.
Eternia Towers A to D
Oberoi Constructions Limited
Bellanza Phase 1 - Wing A, B, C at The Prestig
PRESTIGE MULUND REALTY PRIVATE LIMITED
Atmosphere O2
Atmosphere Realty Pvt Ltd
Bellanza Phase 2 - Wing D, E, F at The Prestig
PRESTIGE MULUND REALTY PRIVATE LIMITED
Forest Hills Ph 1 at The Prestige City
PRESTIGE MULUND REALTY PRIVATE LIMITED
Kalpataru Elitus
Arimas Real Estate Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: Runwal Developers Ltd
Runwal Developers Ltd has 4 registrations on MahaRERA, including RUNWAL ANTHURIUM - VALENTINE and Nirvana Part I. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that RUNWAL ANTHURIUM - VALENTINE shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if RUNWAL ANTHURIUM - VALENTINE is delayed beyond 31 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RUNWAL ANTHURIUM - VALENTINE?
The registered promoter entity is Runwal Developers Ltd, a company as per the filing. Its CIN U70100MH1988PLC046631 and GSTIN 27AAACR0395J1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RUNWAL ANTHURIUM - VALENTINE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against RUNWAL ANTHURIUM - VALENTINE?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for RUNWAL ANTHURIUM - VALENTINE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at RUNWAL ANTHURIUM - VALENTINE?
The professionals named in the filing: Architect: PALLAVI MATKARI; Engineer: Sanjay Singh; Chartered Accountant: S P Gunjal & Associates; Chartered Accountant: M B AGRAWAL AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RUNWAL ANTHURIUM - VALENTINE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback