ReraGenieLog inGet a buyer report

Home / Browse projects / Aurangabad, Maharashtra / RUKHMINI CHHAYA RESIDENCY

Registered No litigation declared Others project

RUKHMINI CHHAYA RESIDENCY

By SWAMI SAMARTH DEVELOPERS

RG-MH-21868 · RERA P51500051416 · Last updated on MahaRERA portal: 14 Feb 2026

Source: official MahaRERA filing

Red flags

  • Rs 5.00 crore secured on the land, in favour of State Bank Of India
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Apr 2029Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 80%
2 of 2Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

RUKHMINI CHHAYA RESIDENCY is a Others project by SWAMI SAMARTH DEVELOPERS in Aurangabad, Maharashtra, registered with MahaRERA as P51500051416 on 14 Jun 2023. Possession is promised by 30 Apr 2029. 0 of the 2 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameRUKHMINI CHHAYA RESIDENCY
  • TypeOthers
  • Location
    • NATHPURAM
    • ITKHEDA
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431005
  • Pincode431005
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500051416
  • ReraGenie IDRG-MH-21868

Builder

  • NameSWAMI SAMARTH DEVELOPERS
  • Entity typePartnership
  • PartnersSUNIL DATTATRAY TAYADE, AKSHAY BHAGWANRAO POL, SONAL ARVIND PATHRIKAR, RASMIN AMIT SHAH
  • Other registrations5 more →
  • Completed2 of 6
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredJun 2023PromisedApr 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Jun 2023
  • Promised completion30 Apr 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed73 files

Current status

0%0 of 2 units booked
44.9%Work done, per cost certificate

Figures as on 14 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RUKHMINI CHHAYA RESIDENCYNA80022

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 80%.

RUKHMINI CHHAYA RESIDENCY: 61% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.35%

Progress on shared amenities15

As on 14 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes40%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes15%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes20%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes10%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed128

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots128
Open Space128

Land and ownership3

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,231 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared present
Charge in favour ofState Bank Of India
Secured amountRs 5.00 crore
CERSAI search filedYes
Declared on18 Feb 2026
LandownerVillageDistrict
SUDHAKAR PUNDLIKRAO MOHITEAurangabad (M Corp.)Aurangabad
CHHAYA SUDHAKAR MOHITEAurangabad (M Corp.)Aurangabad
GEETA MAHADEV MULEYAurangabad (M Corp.)Aurangabad

Approvals and building plan

Sanctioning authorityAURANGABAD MUNICIPAL CORPORATION
Permissible FSI4740.48
Proposed, not sanctioned4,740 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGURUNATH SANKUL KALDA CORNER CHETNA NAGAR AURANGABAD
Estimated costRs 9.28 cr
Cost incurredRs 4.16 cr
Work done44.86%
BuildingWingEstimatedIncurred
RUKHMINI CHHAYA RESIDENCYNARs 9.02 crRs 4.06 cr
-NARs 26.40 lakhRs 10.56 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPAWAN DAMODHARRAO PATHRIKAR
EngineerAKASH DAMODHARRAO PATHRIKAR
Chartered AccountantSACHIN TOTALA & CO
Chartered AccountantGAIKWAD SHAH & CO
PartnerRole in project
SWAMI SAMARTH DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2029

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1 Dec 25.pdf14 Feb 2026
Withdrawal Update Form 2File: Form-2 Dec 25.pdf14 Feb 2026
Withdrawal Update Form 3File: Form-3 Dec 25.pdf14 Feb 2026
Withdrawal Update Form 1File: 1 Form-1 Sep 2025.pdf13 Feb 2026
Withdrawal Update Form 2File: 2 Form-2 Sep 2025.pdf13 Feb 2026
Withdrawal Update Form 3File: 3 Form-3 Sep 2025.pdf13 Feb 2026
Withdrawal Update Form 1File: 1 Form-1 June 2025.pdf28 Oct 2025
Withdrawal Update Form 2File: 2 Form-2 June 2025.pdf28 Oct 2025
Withdrawal Update Form 3File: FORM 3 WITH DECLARATION_organized.pdf28 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM 1 Dec 24.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM 1 Mar 25.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM 2 Dec 24.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM 2 Mar 25.pdf21 Apr 2025
Details of encumbrances concerned to FinanceFile: HDFC NOC.pdf28 Nov 2024
Details of encumbrances concerned to FinanceFile: No Encumbraces HDFC.pdf28 Nov 2024
Details of encumbrances concerned to LegalFile: HDFC NOC.pdf28 Nov 2024
Details of encumbrances concerned to LegalFile: No Encumbraces HDFC.pdf28 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Swami Samarth Developers Form-5.pdf28 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SSD Form-1 Sep-24.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SSD Form-3 Jun-24.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SSD Form-3 Sep-24.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SSD Form-2 Sep-24.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SSD Form-1 Jun-24.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SSD Form-2 Jun-24.pdf21 Oct 2024
Layout approvalFile: IMG_1351.pdf4 May 2024
Building plan approvalFile: IMG_1352.pdf4 May 2024
Copy of Layout Approval (in case of layout)File: IMG_1351.pdf4 May 2024
Building Plan Approval / NA Order for plotted developmentFile: IMG_1352.pdf4 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June Qtr .pdf25 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sep Qtr .pdf25 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 2 Dec Qtr.pdf25 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March Qtr 2024.pdf25 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June QTR.pdf25 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sep QTR.pdf25 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec Qtr.pdf25 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2024 Qtr.pdf25 Apr 2024
Disclosure of sold/ booked inventoryFile: Chhaya Residency Sold 30-Jun-23.pdf25 Apr 2024
Disclosure of sold/ booked inventoryFile: Chhaya Residency Sold 30-Sptember-23.pdf25 Apr 2024
Disclosure of sold/ booked inventoryFile: Chhaya Residency Sold 31-Decmber-23.pdf25 Apr 2024
Disclosure of sold/ booked inventoryFile: Chhaya Residency Sold 31-March-24.pdf25 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Declaraion June 2023.pdf25 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Declaration Sep 2023.pdf25 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Declataion Dec 2023.pdf25 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Declaration March 2024.pdf25 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: annexure A Sp.pdf6 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: annexure A RShah.pdf6 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: annexure A Sunil Tayade.pdf6 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: annexure A A pol.pdf6 Jun 2023
CERSAI detailsFile: Undertaking CERSAI.pdf2 Jun 2023
CERSAI detailsFile: CERSAI_Search_Report_200269125800_For_Asset_Based_Search_19_05_2023_15_52_19_743.pdf19 May 2023
Details of encumbrances concerned to FinanceFile: new encumbrance certificate.pdf18 May 2023
Details of encumbrances concerned to LegalFile: new encumbrance certificate.pdf18 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - CA Certificate.pdf18 May 2023
Other - LegalFile: sanction plan 1.pdf18 May 2023
Other - LegalFile: sanction plan 2.pdf18 May 2023
Other - LegalFile: sanction plan 3 - New.pdf18 May 2023
Details of encumbrances concerned to FinanceFile: encumbrance certificate 1.pdf5 May 2023
Details of encumbrances concerned to LegalFile: encumbrance certificate 1.pdf5 May 2023
Proforma of Allotment letterFile: Proforma - Allotment letter.pdf5 May 2023
Declaration about Commencement CertificateFile: format D.pdf4 May 2023
Declaration in FORM BFile: format B.pdf4 May 2023
Proforma of Agreement for saleFile: Agreement for Sale.pdf4 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A.pdf4 May 2023
Deviation Report with respect to Allotment letterFile: No Deviation Allotment letter.pdf4 May 2023
Deviation Report with respect to model copy of AgreementFile: no Deviation ATS.pdf4 May 2023
Copy of the legal title reportFile: search report 30 yr New.pdf29 Apr 2023
Layout approvalFile: sanction plan.pdf21 Apr 2023
Copy of Layout Approval (in case of layout)File: sanction plan.pdf21 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER'S CERTIFICATE RERA NEW 16-04-2023 RUKMINI CHAYA.pdf21 Apr 2023
Building plan approvalFile: sanction plan.pdf20 Apr 2023
PAN CardFile: PAN SWAMI SAMARTH DE.pdf20 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: sanction plan.pdf20 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf20 Apr 2023

How this compares with Aurangabad

0%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep RUKHMINI CHHAYA RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ITKHEDA1,400+ in Aurangabad

2 kmRUKHMINI CHHAYA RESIDENCCompleted 12Lapsed / revoked 9Other 29Dot size: filed unitsN

Filed coordinates, straight-line distance. 50 registered projects within 2 km.

Builder: SWAMI SAMARTH DEVELOPERS

SWAMI SAMARTH DEVELOPERS has 6 registrations on MahaRERA, including SAMARTH DHANVATIKA and SAMARTH SRUSHTI. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if RUKHMINI CHHAYA RESIDENCY is delayed beyond 30 Apr 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RUKHMINI CHHAYA RESIDENCY?

The registered promoter entity is SWAMI SAMARTH DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RUKHMINI CHHAYA RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RUKHMINI CHHAYA RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RUKHMINI CHHAYA RESIDENCY?

The professionals named in the filing: Architect: PAWAN DAMODHARRAO PATHRIKAR; Engineer: AKASH DAMODHARRAO PATHRIKAR; Chartered Accountant: SACHIN TOTALA & CO; Chartered Accountant: GAIKWAD SHAH & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RUKHMINI CHHAYA RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RUKHMINI CHHAYA RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RUKHMINI CHHAYA RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.