Red flags
- Completion date moved by 48 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RUDRAKSH TOWERS WING B is a Others project by Promoter name not stated in filing in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800077386 on 13 Aug 2024. Possession is promised by 30 Dec 2033. The completion date has moved by 48 months from the original filing. 0 of the 33 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.
At a glance
Project
- NameRUDRAKSH TOWERS WING B
- TypeOthers
- Location
- GMLR NAHUR
- NAHUR
- Kurla
- Mumbai Suburban
- 400080
- Pincode400080
- RERA no.P51800077386
- ReraGenie IDRG-MH-18611
Builder
- NamePromoter name not stated in filing
- PartnersANIL V SHAH, TEJAS A SHAH, KARTIK A SHAH
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on13 Aug 2024
- Promised completion30 Dec 2033
- Revised completionRevised to 30 Dec 2033 (originally 31 Dec 2029)
- Buildings1 building record
- Documents filed129 files
Current status
Figures as on 16 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| RUDRAKSH TOWERS WING B | NA | 17 | 9 | 17 | 16 | 33 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 16 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 71%.
RUDRAKSH TOWERS WING B: 6% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 71% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 16 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed251
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| MAHESH DEVELOPERS | Bandra | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DAISARIA ASSOCIATES |
| Engineer | EPICON CONSULTANTS PVT LTD |
| Engineer | Ashok R Sapariya |
| Chartered Accountant | AMIT DHAVLE AND ASSOCIATES |
| Chartered Accountant | SOHAM A KETKAR & ASSOCIATES |
| Partner | Role in project |
|---|---|
| AVS HOUSING AND CONSTRUCTION LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterReasons for Seeking Extension 1. Pending Procurement and Loading of TDR/Fungible FSI In Rudraksh Towers - Wing B, the IOD/Commencement Certificate has presently been obtained only up to the 9th floor against the proposed 34 floors. The purchase and loading of the requisite TDR/Fungible FSI for construction from the 10th to the 34th floor is still under process and is yet to be completed. Consequently, the necessary approvals for the remaining floors are pending. 2. Construction Yet to Commence and No Bookings Accepted Owing to the above circumstances, construction activities in Rudraksh Towers
Litigation declared6
| Case | Court | Status |
|---|---|---|
| 959/2019 | BOMBAY HIGH COURT | THERE IS NO INJUNCTION IN PROPERTY |
| 524/2017 | BOMBAY HIGH COURT | SUIT IS PENDING FOR COMPLIANCE |
| 15139/2024 | BOMBAY HIGH COURT | INTERIM APPLICATION IS PENDING |
| 100214/2022 | BOMBAY CITY CIVIL COURT | EXECUTION APPLICATION IS PENDING |
| 2442/2023 | BOMBAY HIGH COURT | INTERIM APPLICATION IS PENDING |
| 2489/2012 | BOMBAY CITY CIVIL COURT | SUIT IS PENDING FOR COMPLIANCE |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Aug 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Aug 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Aug 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 1 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Dec 2033
Documents filed129
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 129 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2026-2027)File: FORM 2A WING B.pdf | 16 Jul 2026 |
| Form 1File: From 1 Rudraksh Tower Wing B.pdf | 15 Jul 2026 |
| Form 2File: FORM 2 WING B.pdf | 15 Jul 2026 |
| Form 3File: Form 3 WING B.pdf | 15 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Rudraksh Towers Wing B Sold Unsold.pdf | 15 Jul 2026 |
| Form 1File: Architect Certificate Rudraksh Tower Wing B Jan - Mar 26.pdf | 16 Apr 2026 |
| Form 2File: Engineer Certificate Wing B Jan - Mar 26.pdf | 16 Apr 2026 |
| Form 3File: CA Certificate Wing B Jan - Mar 26.pdf | 16 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Wing B Jan - Mar 26.pdf | 16 Apr 2026 |
| Form 2A (FY 2025-2026)File: Form 2A B wing Jan - Mar 26.pdf | 16 Apr 2026 |
| Form 1File: FORM 1 WING B OCT - DEC 25.pdf | 20 Jan 2026 |
| Form 2File: FORM 2 WING B OCT - DEC 25.pdf | 20 Jan 2026 |
| Form 3File: FORM 3 Wing B Oct - Dec 25.pdf | 20 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD WING B OCT - DEC 25.pdf | 20 Jan 2026 |
| Form 1File: FORM 1 WING B OCT - DEC 25.pdf | 20 Jan 2026 |
| Form 2File: FORM 2 WING B OCT - DEC 25.pdf | 20 Jan 2026 |
| Form 3File: FORM 3 Wing B Oct - Dec 25.pdf | 20 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD WING B OCT - DEC 25.pdf | 20 Jan 2026 |
| Form 1File: Rudraksh Wing B Form 1.pdf | 13 Oct 2025 |
| Form 2File: RUDRAKSH WING B FORM 2.pdf | 13 Oct 2025 |
| Form 3File: Rudraksh Wing B Form 3.pdf | 13 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Rudraksh WIng B Sold Unsold.pdf | 13 Oct 2025 |
| Form 2A (FY 2024-2025)File: RUDRAKSH TOWER WING B FORM 2A.pdf | 13 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5 Wing B.pdf | 13 Oct 2025 |
| Form 1File: Architect Certificate Wing B.pdf | 13 Jul 2025 |
| Form 2File: Form 2 Engineer Certificate Wing B.pdf | 13 Jul 2025 |
| Form 3File: Form 3 Wing B.pdf | 13 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold B Wing Rudraksh.pdf | 13 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD WING B.pdf | 16 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT’S CERTIFICATE WING B.pdf | 12 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 as on 31 03 2025 Wing B.pdf | 12 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: WING B ENGINEER’S CERTIFICATE.pdf | 12 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Wing A 30 9 24.pdf | 31 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 WING A 17 12 24.pdf | 31 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Wing B 30 9 24.pdf | 31 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 WING B 17 12 24.pdf | 31 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 as on 30 09 2024 Wing B.pdf | 31 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 WING B 28 01 25.pdf | 31 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 WING A 17 12 24.pdf | 31 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Wing A 24 01 25.pdf | 31 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 WING B 17 12 24.pdf | 31 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 WING B 24 01 25 compressed.pdf | 31 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD DISCLOSURE WING B.pdf | 31 Jan 2025 |
| Proforma of Agreement for saleFile: AFS B wing.pdf | 9 Aug 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: WING B FORMAT A BANK SEPARATE ACC DECL.pdf | 9 Aug 2024 |
| Deviation Report with respect to model copy of AgreementFile: AFS Deviation Report BWING New Allottees.pdf | 9 Aug 2024 |
| Other - LegalFile: Clarification supplementray agreement 1.pdf | 9 Aug 2024 |
| Other - LegalFile: PRC Declaration.pdf | 9 Aug 2024 |
| Other - LegalFile: DEED OF EXCHANGE REGISTERED COPY-1-15.pdf | 8 Aug 2024 |
| Other - LegalFile: DEED OF EXCHANGE REGISTERED COPY-16-30.pdf | 8 Aug 2024 |
| Other - LegalFile: DEED OF EXCHANGE REGISTERED COPY-31-50.pdf | 8 Aug 2024 |
| Other - LegalFile: DEED OF EXCHANGE REGISTERED COPY-51-70.pdf | 8 Aug 2024 |
| Other - LegalFile: 747.pdf | 8 Aug 2024 |
| Other - LegalFile: 748.pdf | 8 Aug 2024 |
| Other - LegalFile: 748:1.pdf | 8 Aug 2024 |
| Other - LegalFile: 748:2.pdf | 8 Aug 2024 |
| Other - LegalFile: 733B.pdf | 8 Aug 2024 |
| Details of encumbrances concerned to FinanceFile: legal encrumbrance wing B.pdf | 7 Aug 2024 |
| Details of encumbrances concerned to LegalFile: legal encrumbrance wing B.pdf | 7 Aug 2024 |
| Proforma of Allotment letterFile: Allotment Letter Tower B (1).pdf | 7 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Wing B.pdf | 6 Aug 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: letter from Bank Wing B.pdf | 6 Aug 2024 |
| Other - FinanceFile: Clarification cum undertaking.pdf | 6 Aug 2024 |
| Other - FinanceFile: REGISTERED JV Agreement 15:01:2022 Page 1-40.pdf | 6 Aug 2024 |
| Other - FinanceFile: REGISTERED JV Agreement 15:01:2022 Page 41-80.pdf | 6 Aug 2024 |
| Other - FinanceFile: REGISTERED JV Agreement 15:01:2022 Page 81-120.pdf | 6 Aug 2024 |
| Other - FinanceFile: REGISTERED JV Agreement 15:01:2022 Page 121-160.pdf | 6 Aug 2024 |
| Other - FinanceFile: REGISTERED JV Agreement 15:01:2022 Page 161-200.pdf | 6 Aug 2024 |
| Other - FinanceFile: REGISTERED JV Agreement 15:01:2022 Page 201-240.pdf | 6 Aug 2024 |
| Other - FinanceFile: REGISTERED JV Agreement 15:01:2022 Page 241-304.pdf | 6 Aug 2024 |
| Building plan approvalFile: IOD.pdf | 3 Aug 2024 |
| Copy of the legal title reportFile: TITLE(1)-.pdf | 3 Aug 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD.pdf | 3 Aug 2024 |
| Other - LegalFile: Order date 22:12:2023.pdf | 3 Aug 2024 |
| Other - LegalFile: 06:06:24.pdf | 3 Aug 2024 |
| Other - LegalFile: order 15:12:2023 IA2442:2023.pdf | 3 Aug 2024 |
| Other - LegalFile: execution application 100214.pdf | 3 Aug 2024 |
| Building plan approvalFile: Amended Approved Plan 1-4 .pdf | 2 Aug 2024 |
| Building plan approvalFile: Amended Approved Plan 5-6 .pdf | 2 Aug 2024 |
| Building plan approvalFile: Amended Approved Plan 7-8 .pdf | 2 Aug 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 129 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep RUDRAKSH TOWERS WING B on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NAHUR6,700+ in Mumbai Suburban
Eternia Towers A to D
Oberoi Constructions Limited
Bellanza Phase 1 - Wing A, B, C at The Prestig
PRESTIGE MULUND REALTY PRIVATE LIMITED
Atmosphere O2
Atmosphere Realty Pvt Ltd
Bellanza Phase 2 - Wing D, E, F at The Prestig
PRESTIGE MULUND REALTY PRIVATE LIMITED
Forest Hills Ph 1 at The Prestige City
PRESTIGE MULUND REALTY PRIVATE LIMITED
Kalpataru Elitus
Arimas Real Estate Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: Promoter name not stated in filing
The filing does not name a promoter organisation for this registration. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if RUDRAKSH TOWERS WING B is delayed beyond 30 Dec 2033?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RUDRAKSH TOWERS WING B?
The registered promoter entity is Promoter name not stated in filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RUDRAKSH TOWERS WING B?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for RUDRAKSH TOWERS WING B?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at RUDRAKSH TOWERS WING B?
The professionals named in the filing: Architect: DAISARIA ASSOCIATES; Engineer: EPICON CONSULTANTS PVT LTD; Engineer: Ashok R Sapariya; Chartered Accountant: AMIT DHAVLE AND ASSOCIATES; Chartered Accountant: SOHAM A KETKAR & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RUDRAKSH TOWERS WING B?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback