Red flags

  • Registration lapsed
  • Possession 12 months past the filed date
  • Completion date moved by 11 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2025Possession promised12 months past this date
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
13 of 56Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 119 documents Report an error

RTC SILVER is a Commercial project by YOGESH ANANDPAL GOYAL in Pune, Maharashtra, registered with MahaRERA as P52100032721 on 24 Jan 2022. Possession was promised by 31 Oct 2025 and is now 12 months past that date. The completion date has moved by 11 months from the original filing. 43 of the 56 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameRTC SILVER
  • TypeCommercial
  • Location
    • PUNE NAGAR ROAD
    • WAGHOLI
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100032721
  • ReraGenie IDRG-MH-22703

Builder

  • NameYOGESH ANANDPAL GOYAL
  • Entity typeIndividual
  • GSTIN27ABKPG1172A4Z3
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

12 months past promisethis monthRegisteredJan 2022First promiseNov 2024Revised toOct 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on24 Jan 2022
  • Promised completion31 Oct 2025
  • Revised completionRevised to 31 Oct 2025 (originally 1 Nov 2024)
  • Buildings1 building record
  • Documents filed119 files

Current status

77%43 of 56 units booked

Figures as on 8 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RTC SILVER B4NA111105656

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

RTC SILVER B4: 83% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.85%

Progress on shared amenities16

As on 8 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Piped Gas ConnectionYes0%

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,465 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Sep 2024
LandownerVillageDistrict
YOGESH BAFNA DIRECTR GANDHI BAFNA CONSTRUCTION P LPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Metropolitan Regional Development Authority
Permissible FSI12359.69
Proposed, not sanctioned6,375 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch215, FREE PRESS HOUSE, FREE PRESS MARG, NARIMAN POINT, MUMBAI 400021

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSDI CONSULTANTS PVT LTD
EngineerKedar Phadnis Structural Consultant & Chartered Engineer
Chartered AccountantCA SUNNY THAWANI
Chartered AccountantRadhika Khandelwal & Associates
PartnerRole in project
YOGESH ANANDPAL GOYAL-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100019814Nov 2024 → Oct 2025

Reason as filed by the promoter.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Oct 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 21 Mar 2025

Documents filed119

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 119 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: Plan 11- (B4) 10th & 11th Floor Plan.pdf8 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate for RERA Q2.pdf21 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Q1 FY 24-25.pdf21 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Q2 FY 24-25.pdf21 Mar 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate.pdf21 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q1 Self Declaration - No Withdrawal from Designated Bank Account.pdf29 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Q2 Self Declaration - No Withdrawal from Designated Bank Account.pdf29 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate for Q1 FY 24-25.pdf13 Aug 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration for seperate bank Ac RTC Silver.pdf13 Jul 2024
Declaration in FORM BFile: Form B.pdf20 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4 FY 23-24.pdf20 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf20 Jun 2024
Disclosure of sold/ booked inventoryFile: Promoters Disclosure of Sold and Unsold Inventory of RTC Silver B4.pdf20 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RTC Silver.pdf20 Jun 2024
Layout approvalFile: Plan 1 - Layout_compressed.pdf10 May 2024
Building plan approvalFile: Plan 2 - Parking Layout_compressed.pdf10 May 2024
Building plan approvalFile: Plan 3 - (Wing 1A) Section AA, Terrace, Stilt, Elevation_compressed.pdf10 May 2024
Building plan approvalFile: Plan 4 - (B3) 1st, 3rd, Parking Floor Plan_compressed.pdf10 May 2024
Building plan approvalFile: Plan 5 - (B3) 2nd, 4th, 5th, 6th, Elevation Plan_compressed.pdf10 May 2024
Building plan approvalFile: Plan 6 - (B3) 7th, 8th, 9th, 10th, Section AA Plan_compressed.pdf10 May 2024
Building plan approvalFile: Plan 7 - (B4) 1st, Parking Floor Plan_compressed.pdf10 May 2024
Building plan approvalFile: Plan 8 - (B4) 2nd, 3rd Floor Plan_compressed.pdf10 May 2024
Building plan approvalFile: Plan 9 - (B) 4th, 5th Floor Plan_compressed.pdf10 May 2024
Building plan approvalFile: Plan 10 - (B4) 6th, 7th, 8th, 9th Floor Plan_compressed.pdf10 May 2024
Building plan approvalFile: Plan 12 - (B4) Section BB, XX, Terrace Floor Plan_compressed.pdf10 May 2024
Copy of Layout Approval (in case of layout)File: Plan 1 - Layout_compressed.pdf10 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 2 - Parking Layout_compressed.pdf10 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 3 - (Wing 1A) Section AA, Terrace, Stilt, Elevation_compressed.pdf10 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 4 - (B3) 1st, 3rd, Parking Floor Plan_compressed.pdf10 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 5 - (B3) 2nd, 4th, 5th, 6th, Elevation Plan_compressed.pdf10 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 6 - (B3) 7th, 8th, 9th, 10th, Section AA Plan_compressed.pdf10 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 7 - (B4) 1st, Parking Floor Plan_compressed.pdf10 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 8 - (B4) 2nd, 3rd Floor Plan_compressed.pdf10 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 9 - (B) 4th, 5th Floor Plan_compressed.pdf10 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 10 - (B4) 6th, 7th, 8th, 9th Floor Plan_compressed.pdf10 May 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 12 - (B4) Section BB, XX, Terrace Floor Plan_compressed.pdf10 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Letter dated 04042024.pdf10 May 2024
Declaration about Commencement CertificateFile: Declaration of CC.pdf10 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 30-06-2023.pdf22 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 30-09-2023.pdf22 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 30-12-2023.pdf22 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Engineer Certificate (Quality Assurance ) for FY 22-23.pdf19 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY 22-23.pdf15 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Signed_compressed.pdf10 Oct 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: RTC Silver B4 - Occupancy Certificate upto 8th Flr dt 13_06_2023.pdf4 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate.pdf16 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineer Certificate .pdf16 May 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold Inventory.pdf16 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf16 May 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: RTC Silver - Occupancy Certificate upto 4th Floor.pdf16 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Architect Certificate.pdf6 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineer Certificate.pdf6 May 2023
Disclosure of sold/ booked inventoryFile: Disclouser of Sold Booked Inventory.pdf6 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_CA Certificate (1).pdf6 May 2023
Proforma of Agreement for saleFile: 1 Proforma of Allotment letter.pdf17 Mar 2023
Details of encumbrances concerned to FinanceFile: Self Declaration regarding encumberances.pdf22 Feb 2023
Details of encumbrances concerned to LegalFile: Self Declaration regarding encumberances.pdf22 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organisations.pdf22 Feb 2023
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment Letter.pdf22 Feb 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to Model Draft Agreement.pdf22 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA Certificate Form 5 - signed and accepted by Promotor YG.pdf7 Feb 2023
Building plan approvalFile: Plan 7.pdf23 Dec 2022
Building plan approvalFile: Plan 8.pdf23 Dec 2022
Building plan approvalFile: Plan 9.pdf23 Dec 2022
Building plan approvalFile: Plan 10.pdf23 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan 7.pdf23 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan 8.pdf23 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan 9.pdf23 Dec 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan 10.pdf23 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2_YG.pdf7 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate dt 04072022.pdf25 Jul 2022
Layout approvalFile: Plan 1 - Layout.pdf12 Feb 2022
Building plan approvalFile: Plan 2 - Parking Layout Upper Ground Flr Parking.pdf12 Feb 2022
Building plan approvalFile: Plan 3 - Comm Wing 1A Terrace Elevation StilT Section.pdf12 Feb 2022
Building plan approvalFile: Plan 4 - B3 1st 3rd Parking Section BB.pdf12 Feb 2022
Building plan approvalFile: Plan 5 - (B3) 2nd, 4th, 5th 6th, Elevation.pdf12 Feb 2022
Building plan approvalFile: Plan 6 - (B3) 7th, 8th, 9th, 10th, Section AA.pdf12 Feb 2022
Building plan approvalFile: Plan 7 - (B4) 1st, Parking, Elevation.pdf12 Feb 2022
Building plan approvalFile: Plan 8 - (B4) 2nd, 3rd Floor.pdf12 Feb 2022

How this compares with Pune

77%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 11 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RTC SILVER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WAGHOLI13,700+ in Pune

2 kmRTC SILVERCompleted 19Lapsed / revoked 13Other 32Dot size: filed unitsN

Filed coordinates, straight-line distance. 64 registered projects within 2 km.

Builder: YOGESH ANANDPAL GOYAL

YOGESH ANANDPAL GOYAL has 2 registrations on MahaRERA, including RTC SILVER and RTC Emerald Suites. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that RTC SILVER shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if RTC SILVER is delayed beyond 31 Oct 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RTC SILVER?

The registered promoter entity is YOGESH ANANDPAL GOYAL, an individual as per the filing. Its GSTIN 27ABKPG1172A4Z3 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RTC SILVER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RTC SILVER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RTC SILVER?

The professionals named in the filing: Architect: SDI CONSULTANTS PVT LTD; Engineer: Kedar Phadnis Structural Consultant & Chartered Engineer; Chartered Accountant: CA SUNNY THAWANI; Chartered Accountant: Radhika Khandelwal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RTC SILVER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RTC SILVER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RTC SILVER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.