Red flags

  • Possession 1 months past the filed date
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
5 of 11Construction stages donefurthest along: Internal walls, 93%
23 of 72Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 102 documents Report an error

ROONGTA EXQUISITE APARTMENT is a Others project by ROONGTA LANDMARKS LLP in Nashik, Maharashtra, registered with MahaRERA as P51600046803 on 10 Sep 2022. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 6 months from the original filing. 49 of the 72 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameROONGTA EXQUISITE APARTMENT
  • TypeOthers
  • Location
    • ANANDWALI
    • NASHIK
    • Aanandwali
    • 422013
  • Pincode422013
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600046803
  • ReraGenie IDRG-MH-70626

Builder

  • NameROONGTA LANDMARKS LLP
  • Entity typePartnership
  • PartnersAKHIL LALIT ROONGTA, NIKHIL LALIT ROONGTA, LALIT ROONGTA
  • Other registrations5 more →
  • Completed4 of 6
  • Past their filed date1
  • Declared earlier projects2 →

Key dates

1 months past promisethis monthRegisteredSep 2022First promiseMar 2026Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Sep 2022
  • Promised completion30 Sep 2026
  • Revised completionRevised to 30 Sep 2026 (originally 31 Mar 2026)
  • Buildings1 building record
  • Documents filed102 files

Current status

68%49 of 72 units booked
93.7%Work done, per cost certificate

Figures as on 11 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ROONGTA EXQUISITE APARTMENTNA201868472

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 93%.

ROONGTA EXQUISITE APARTMENT: 71% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises93%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks72%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.59%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.61%

Progress on shared amenities15

As on 11 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed72

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots72
Closed/Covered47
Open Space25

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,812 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Mar 2026

Approvals and building plan

Sanctioning authorityNASHIK MUNICIPAL CORPORATION
Permissible FSI9009.88
Proposed, not sanctioned9,010 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchINDIRA NAGAR , NASHIK
Estimated costRs 19.43 cr
Cost incurredRs 18.20 cr
Work done93.7%
BuildingWingEstimatedIncurred
ROONGTA EXQUISITE APARTMENTNARs 19.13 crRs 18.20 cr
-NARs 30.00 lakh-

Certifying professionals and partners10

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAGAR A. KABRE
ArchitectKABRE CONSULTANTS
EngineerAMOL YADAVRAO BHALERAO
EngineerMR SANJEEV PATEL
EngineerRAHUL TANHAJI JADHAV
Chartered AccountantPranav S. Lahoti & Co.
Chartered AccountantPravin R. Rathi & Associates
Chartered AccountantPRANAV LAHOTI
Chartered AccountantPRAVIN R RATHI & ASSOCIATES FRN 131494W
Chartered AccountantMS MAHENDRA JADHAV AND ASSOCIATES
PartnerRole in project
ROONGTA LANDMARKS LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA17032620249Mar 2026 → Sep 2026

Reason as filed by the promoterDue to the ongoing geopolitical conflict in the West Asia region, there have been significant disruptions in global supply chains and logistics networks affecting the availability and timely delivery of construction materials and equipment. The project has experienced shortage and delayed procurement of key construction materials, escalation in transportation timelines, and rescheduling of contractor activities due to supply constraints. These circumstances are beyond the control of the promoter and have temporarily affected the pace of construction activities despite continuous efforts to mai

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 26 Jun 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed102

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Exquisite Architect Cert 01072026.pdf11 Aug 2026
Withdrawal Update Form 2File: Engineer Cert 01072026.pdf11 Aug 2026
Withdrawal Update Form 3File: FORM 3 Exquisite Q1 FY 26-27.pdf11 Aug 2026
Layout approvalFile: plan.pdf26 Jun 2026
Form 2A (FY 2025-2026)File: Form 2a Exquisite 25-26.pdf27 May 2026
Withdrawal Update Form 1File: FORM 1.pdf17 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf17 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf17 Apr 2026
Withdrawal Update Form 1File: FORM 1 EXQUISITE 01012026.pdf10 Mar 2026
Withdrawal Update Form 2File: FORM 2 Q3 EXQUISITE.pdf10 Mar 2026
Withdrawal Update Form 3File: EXQUISITES Q3 31122025.pdf10 Mar 2026
Form 3File: EXQUISITES Q3 31122025.pdf10 Feb 2026
Form 2File: FORM 2 Q3 EXQUISITE.pdf10 Feb 2026
Form 1File: FORM 1-EXQUISITE-01012026.pdf10 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold inventory-EXQUISITE-31122025.pdf10 Feb 2026
Form 2File: FORM 2 EXQUISITE Q2 01102025.pdf9 Dec 2025
Form 1File: FORM 1-EXQUISITE-01102025.pdf9 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold inventory-EXQUISITE-30092025.pdf9 Dec 2025
Form 3File: EXQUISITE Q2 30092025...pdf9 Dec 2025
Form 5 (FY 2024-2025)File: FORM 5 EXQUISITE.pdf22 Nov 2025
Form 1File: FORM 1-EXQUISITE 01072025.pdf14 Aug 2025
Form 2File: FORM 2-EXQUISITE-01072025.pdf14 Aug 2025
Form 3File: EXQUISITE FORM 3.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold inventory-EXQUISITE-01072025.pdf14 Aug 2025
Form 1File: FORM 1-EXQUISITE-01042025.pdf11 Jun 2025
Form 2File: FORM 2-EXQUISITE_01042025.pdf11 Jun 2025
Form 3File: Exquisite form 3 q4.pdf11 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD-EXQUISITE-Q4-FY24-25.pdf11 Jun 2025
Self-declaration of Quarterly ProgressFile: EXQUISTE CERSAI MAR 25.pdf11 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-EXQUISITE-01042025.pdf30 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD-EXQUISITE-FY24-25.pdf24 Apr 2025
Other - TechnicalFile: FORM 2A_EXQUISITE_FY 24-25.pdf12 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certi_EXQUISITE 01012025.pdf4 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_EXQUISITE_01012025.pdf4 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-EXQUISITE-01012025.pdf22 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold-Exquisite-Q3.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Engineer Certificate_Exquisite_Q1.pdf3 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Exquisite_Q2.pdf3 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-EXQUISITE Q2.pdf26 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-EXQUISISTE-Q2.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-EXQUISISTE-Q2.pdf18 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 EXQUISITE 23-24.pdf31 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold_Exquisite_Q2 24-25.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Exquisite_Q1 24-25.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Exquisite_Form 1_Q1(24-25).pdf12 Jul 2024
Disclosure of sold/ booked inventoryFile: EXQUISITE_SOLD UNSOLD INVENTORY_Q1.pdf6 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EXQUISITE FORM 2 Q4.pdf6 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 FORM 1 EXQUISITE Q4.pdf1 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: EXQUSITE MAR 24.pdf1 May 2024
CERSAI detailsFile: CERSAI_EXQUISITE.pdf27 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: EXQUSITE MARCH 23.pdf22 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Exquisiste_ Form 3_Q4.pdf22 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: EXQUISITE FORM 3 Q4.pdf22 Apr 2024
Other - TechnicalFile: EXQUSITE MAR 24.pdf22 Apr 2024
Disclosure of sold/ booked inventoryFile: EXQUISITE 31032024.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Exquisite_Form-2 Q3.pdf3 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 Exquisite 01012024.pdf24 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: EXQUISITE FORM 3 Q3.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EXQUISITE FORM 2 Q1.pdf13 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EXQUISITE FORM 2 Q2.pdf13 Jan 2024
Disclosure of sold/ booked inventoryFile: EXQUISITE Q3.pdf4 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: EXQUISITE 01072023.pdf3 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: EXQUISITE 02102023.pdf3 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q1.pdf3 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q2.pdf3 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EXQUISITE.pdf30 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 EXQUISITE Q4.pdf23 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 EXQUISITE FY 22-23_compressed.pdf23 Oct 2023
Proforma of Agreement for saleFile: AFS.pdf23 Oct 2023
Disclosure of sold/ booked inventoryFile: EXQUISITE.pdf19 Oct 2023
Disclosure of sold/ booked inventoryFile: EXQUISITE 30062023.pdf26 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: EXQUSITE FORM 1.pdf15 May 2023
CERSAI detailsFile: CERSAI_EXQUISITE.pdf26 Apr 2023
Disclosure of sold/ booked inventoryFile: EQUISITE.pdf21 Apr 2023
Other - TechnicalFile: EXQUSITE.pdf21 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: REVISED COMMEMCEMENT.pdf1 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: EXQUISITE.pdf21 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: EXQUISITE Q2.pdf30 Jan 2023
Disclosure of sold/ booked inventoryFile: EXQUISITE 31122022.pdf27 Jan 2023
Disclosure of sold/ booked inventoryFile: EXQUISITE SEP22-ok.pdf14 Oct 2022

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
ROONGTA LIFESTYLE VILLASP51600030728NASHIK, Nashik42Sep 2021CompletedApr 2023Mar 2023
ROONGTA CENTRAL PARK APARTMENTP51600022518NAHSIK, Nashik194Sep 2019CompletedMar 2023Jan 2021

How this compares with Nashik

68%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one moved by 6 months
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ROONGTA EXQUISITE APARTMENT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NASHIK4,100+ in Nashik

2 kmROONGTA EXQUISITE APARTMCompleted 154Lapsed / revoked 39Other 93Dot size: filed unitsN

Filed coordinates, straight-line distance. 286 registered projects within 2 km.

Builder: ROONGTA LANDMARKS LLP

ROONGTA LANDMARKS LLP has 6 registrations on MahaRERA, including ROONGTA CENTRAL PARK APARTMENT and ROONGTA FUTUREX APARTMENT. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if ROONGTA EXQUISITE APARTMENT is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ROONGTA EXQUISITE APARTMENT?

The registered promoter entity is ROONGTA LANDMARKS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ROONGTA EXQUISITE APARTMENT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ROONGTA EXQUISITE APARTMENT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ROONGTA EXQUISITE APARTMENT?

The professionals named in the filing: Architect: SAGAR A. KABRE; Architect: KABRE CONSULTANTS; Engineer: AMOL YADAVRAO BHALERAO; Engineer: MR SANJEEV PATEL; Engineer: RAHUL TANHAJI JADHAV; Chartered Accountant: Pranav S. Lahoti & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ROONGTA EXQUISITE APARTMENT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ROONGTA EXQUISITE APARTMENT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ROONGTA EXQUISITE APARTMENT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.