Home / Browse projects / Mumbai Suburban, Maharashtra / Zee Sadguru

Registered No litigation declared Others project

Zee Sadguru

By Zee Developers Private Limited

RG-MH-19102 · RERA P51800078144 · Last updated on MahaRERA portal: 21 Apr 2026

Source: official MahaRERA filing

Red flags

  • Rs 50.00 crore secured on the land, in favour of ICICI HOME FINANCE COMPANY LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
15 of 33Construction stages doneacross 3 buildings; furthest along: Staircases, 50%
76 of 87Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

Zee Sadguru is a Others project by Zee Developers Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800078144 on 25 Nov 2024. Possession is promised by 31 Dec 2027. 11 of the 87 units on this registration are recorded sold or booked, and 15 of 33 construction stages are filed complete.

At a glance

Project

  • NameZee Sadguru
  • TypeOthers
  • Location
    • Tejpal Road
    • Vile Parle East
    • Vileparle
    • Andheri
    • Mumbai Suburban
    • 400057
  • Pincode400057
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800078144
  • ReraGenie IDRG-MH-19102

Builder

  • NameZee Developers Private Limited
  • Entity typeCompany
  • DirectorsAkshay Kalpesh Shah, Ishan Rahul Shah, Jayant Chhotalal Shah, Pragneshbhai Jayantibhai Patel, Rameshchandra Prathviraj Jain, Meena Jayant Shah, Kunhal Manoj Jain, Punjalal Ranchhod Patel

Key dates

this monthRegisteredNov 2024PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Nov 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed73 files

Current status

13%11 of 87 units booked
64.5%Work done, per cost certificate

Figures as on 21 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing BNA9823023
Wing CNA9818018
Wing ANA98301646

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 21 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Staircases, at 50%.

Wing B55%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing C55%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing A55%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed104

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots104
Closed/Covered104
BuildingClosed/CoveredTotal
Wing B4040
Wing C2424
Wing A4040

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,475 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofICICI HOME FINANCE COMPANY LIMITED
Secured amountRs 50.00 crore
CERSAI search filedYes
Declared on10 Feb 2026

Approvals and building plan

Sanctioning authoritySLUM REHABILATION AUTHORITY
Permissible FSI5199.25
Proposed, not sanctioned5,199 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKadamgiri Complex, Hanuman Road, Vile Parle East, Mumbai 400057
Estimated costRs 114.33 cr
Cost incurredRs 73.78 cr
Work done64.53%
BuildingWingEstimatedIncurred
Wing BNARs 38.11 crRs 24.59 cr
Wing CNARs 38.11 crRs 24.59 cr
Wing ANARs 38.11 crRs 24.59 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVishwas J Satodia
EngineerAkshay Shah
EngineerRajesh R Bauskar
Chartered AccountantCA Manoj Jain
Chartered AccountantManoj V Jain
PartnerRole in project
Zee Developers Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Oct 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Oct 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Fy 2025-26 Q4.pdf21 Apr 2026
Withdrawal Update Form 2File: zee sadguru Engineer Form 2_31-03-2026 N.pdf21 Apr 2026
Withdrawal Update Form 3File: Zee Sadguru Form 3 Fy 2025-26 Q4.pdf21 Apr 2026
Form 1File: Achitect Form 1 2025-26 Q3.pdf16 Jan 2026
Form 2File: zee sadguru Engineer Form 2_31-12-2025.pdf16 Jan 2026
Form 3File: Zee Sadguru Form 3 2025-26 Q3_compressed.pdf16 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory 2025-26 Q3.pdf16 Jan 2026
Form 1File: FORM-1 2025-26 Q2.pdf17 Oct 2025
Form 2File: zee sadguru Engineer Form 2 2025-26 Q 2.pdf17 Oct 2025
Form 3File: Zee Sadguru Form-3 2025-26 Q2.pdf17 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold zee sadguru 30-09-2025.pdf17 Oct 2025
Form 2A (FY 2024-2025)File: Form 2A FY 2024-25.pdf19 Aug 2025
Form 5 (FY 2024-2025)File: Form 5 Zee developers pvt ltd_0001.pdf22 Jul 2025
Form 1File: FORM 1 Q1 2025-26.pdf18 Jul 2025
Form 2File: FORM 2 Q1 2025-26.pdf18 Jul 2025
Form 3File: FORM 3 Q1 2025-26.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of unsold inventory.pdf18 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ZEE SADGURU FORM 1 2024-25 Q4.pdf10 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ZEE SADGURU FORM 3 2024-25 Q4.pdf10 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ZEE SADGURU FORM 2 2024-25 Q4.pdf10 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ZEE SADGURU FORM 1 2024-25 Q3.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ZEE SADGURU FORM 3 2024-25 Q3_compressed (1).pdf30 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ZEE SADGURU FORM 2 2024-25 Q3.pdf30 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf19 Nov 2024
Building plan approvalFile: 14.pdf24 Oct 2024
Building plan approvalFile: 13.pdf24 Oct 2024
Building plan approvalFile: 12.pdf24 Oct 2024
Building plan approvalFile: 11.pdf24 Oct 2024
Building plan approvalFile: 10.pdf24 Oct 2024
Building plan approvalFile: 9.pdf24 Oct 2024
Building plan approvalFile: 8.pdf24 Oct 2024
Building plan approvalFile: 7.pdf24 Oct 2024
Building plan approvalFile: 6.pdf24 Oct 2024
Building plan approvalFile: 5.pdf24 Oct 2024
Building plan approvalFile: 4.pdf24 Oct 2024
Building plan approvalFile: 3.pdf24 Oct 2024
Building plan approvalFile: 2.pdf24 Oct 2024
Building plan approvalFile: 1.pdf24 Oct 2024
Layout approvalFile: 1.pdf24 Oct 2024
Copy of Layout Approval (in case of layout)File: 1.pdf24 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 7.pdf24 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf24 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf24 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf24 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf24 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf24 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf24 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 8.pdf24 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 9.pdf24 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 10.pdf24 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 11.pdf24 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 12.pdf24 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 13.pdf24 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 14.pdf24 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: Amended Plan Letter.pdf23 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: plinth CC zee developers.pdf18 Oct 2024
Copy of the legal title reportFile: Legal Title Certificate 23-09-2024_0001.pdf8 Oct 2024
Deviation Report with respect to model copy of AgreementFile: Deviation for sale_0001.pdf10 Aug 2024
Proforma of Agreement for saleFile: AFS.pdf10 Aug 2024
Declaration about Commencement CertificateFile: Form D.pdf15 Feb 2024
PAN CardFile: PAN CARD.pdf13 Feb 2024
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Finance - Zee Sadguru.pdf13 Feb 2024
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Legal - Zee Sadguru.pdf13 Feb 2024
Proforma of Allotment letterFile: Allotment Letter - Zee Sadguru_compressed.pdf13 Feb 2024
Declaration in FORM BFile: Developers Form B - Zee Sadguru noatry.pdf13 Feb 2024
CERSAI detailsFile: Declaration-Nil-CERSAI Report - Zee Sadguru.pdf13 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account Declaration - Zee Sadguru.pdf13 Feb 2024
Deviation Report with respect to Allotment letterFile: Deviation of Allotment Letter - Zee Sadguru.pdf13 Feb 2024
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Finance - Zee Sadguru.pdf13 Feb 2024
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal - Zee Sadguru.pdf13 Feb 2024
Other - TechnicalFile: Declaration of One Plot One Registration - Zee Sadguru.pdf13 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest - converted (1).pdf13 Feb 2024

How this compares with Mumbai Suburban

13%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Zee Sadguru on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vile Parle East6,700+ in Mumbai Suburban

2 kmZee SadguruCompleted 145Lapsed / revoked 68Other 142Dot size: filed unitsN

Filed coordinates, straight-line distance. 355 registered projects within 2 km.

Builder: Zee Developers Private Limited

Zee Developers Private Limited has 1 registration on MahaRERA, including Zee Sadguru. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Zee Sadguru is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Zee Sadguru?

The registered promoter entity is Zee Developers Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Zee Sadguru?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Zee Sadguru?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Zee Sadguru?

The professionals named in the filing: Architect: Vishwas J Satodia; Engineer: Akshay Shah; Engineer: Rajesh R Bauskar; Chartered Accountant: CA Manoj Jain; Chartered Accountant: Manoj V Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Zee Sadguru?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Zee Sadguru. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Zee Sadguru to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.