Home / Browse projects / Pune, Maharashtra / ROHAN YUVA - BUILD A
ROHAN YUVA - BUILD A
By ANUMIT BUILDCON PRIVATE LIMITED
RG-MH-14642 · RERA P52100023080 · Last updated on MahaRERA portal: 16 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 40 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
ROHAN YUVA - BUILD A is a Commercial project by ANUMIT BUILDCON PRIVATE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100023080 on 29 Nov 2019. Possession is promised by 30 Apr 2027. The completion date has moved by 40 months from the original filing. 25 of the 127 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameROHAN YUVA - BUILD A
- TypeCommercial
- Location
- PUNE NAGAR HIGHWAY
- PUNE NAGAR ROAD
- WAGHOLI
- Haveli
- Pune
- 412207
- Pincode412207
- RERA no.P52100023080
- ReraGenie IDRG-MH-14642
Builder
- NameANUMIT BUILDCON PRIVATE LIMITED
- Entity typeCompany
- CINU41001PN2025PTC248816
- PartnersARUN RAGHU THIGALE, JALINDAR VITTHAL SASWADE
- Other registrations2 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 Nov 2019
- Promised completion30 Apr 2027
- Revised completionRevised to 30 Apr 2027 (originally 30 Dec 2023)
- Buildings1 building record
- Documents filed175 files
Current status
Figures as on 16 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| ROHAN YUVA - BUILD A | NA | 6 | 6 | 0 | 127 | 127 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 16 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 72%.
ROHAN YUVA - BUILD A: 61% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 70% |
| Sanitary Fittings within the flats / premises | 5% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 72% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 55% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 20% |
Progress on shared amenities15
As on 16 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 25% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed113
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership3
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| VISHNU PANDURANG SATAV & FAMILY | WAGHOLI | Pune |
| DATTATRAY PANDURANG SATAV & FAMILY | WAGHOLI | Pune |
| Vishnu Pandurang Satav | WAGHOLI | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| ROHAN YUVA - BUILD A | NA | Rs 13.62 cr | Rs 13.46 cr |
| - | NA | Rs 3.73 cr | Rs 3.45 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ATIT SHRIKANT ADMULWAR |
| Engineer | LAXMIKANT MORE |
| Chartered Accountant | RSMS AND ASSOCIATES |
| Chartered Accountant | K D Gargorte & Associates |
| Chartered Accountant | Indrajit Tambade |
| Chartered Accountant | Prasad Nandkumar Malkar |
| Chartered Accountant | DBT AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| ANUMIT BUILDCON PRIVATE LIMITED | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe have declared our date of completion is 30/12/2023 however due to some hindrances which are more specifically mentioned below we are requesting you for granting of extension for the project completion date till 29/12/2024. Reason for Delay Project:- Due to lockdown 1.0 we are facing lots of issue to complete the project on time. There are various issues standing in front of us in this pandemic. • There is lack of supply of construction Material as well as transportation of material on site. • Also facing problem of labours as they are migrated to their native place in this covid situation.
Reason as filed by the promoterWe have attached declaration form explanation the reason for delay in other tab, also attached the explanation for extension period.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Nov 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Nov 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Nov 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Nov 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Apr 2027
Documents filed175
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 175 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 - Building A - Jun 26.pdf | 16 Aug 2026 |
| Withdrawal Update Form 2File: Form 2-A Bldg Jun 26.pdf | 16 Aug 2026 |
| Withdrawal Update Form 3File: Form3.pdf | 16 Aug 2026 |
| Form 2A (FY 2020-2021)File: Form 2A - A Bldg - 2021.pdf | 16 Aug 2026 |
| Form 2A (FY 2021-2022)File: Form 2A - A Bldg - 2022.pdf | 16 Aug 2026 |
| Form 2A (FY 2022-2023)File: Form 2A - A Bldg - 2023.pdf | 16 Aug 2026 |
| Form 2A (FY 2023-2024)File: Form 2A - A Bldg - 2024.pdf | 16 Aug 2026 |
| Form 2A (FY 2024-2025)File: Form 2A - A Bldg - 2025.pdf | 16 Aug 2026 |
| Form 2A (FY 2025-2026)File: Form 2A - A Bldg - 2026.pdf | 16 Aug 2026 |
| Form 2A (FY 2026-2027)File: Form 2A - A Bldg - 2027.pdf | 16 Aug 2026 |
| Form 2A (FY 2019-2020)File: Form 2A - A Bldg - 2020.pdf | 14 Aug 2026 |
| Withdrawal Update Form 1File: Form 1 - Building A - Jun 26.pdf | 24 Jul 2026 |
| Withdrawal Update Form 2File: Form 2-A Bldg Jun 26.pdf | 24 Jul 2026 |
| Withdrawal Update Form 3File: Form3.pdf | 24 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 - A Bldg.pdf | 6 May 2026 |
| Withdrawal Update Form 2File: Form 2- Build A.pdf | 6 May 2026 |
| Withdrawal Update Form 3File: Form 3 - A Bldg.pdf | 6 May 2026 |
| Withdrawal Update Form 1File: A Bldg - Form 1 Dec 25.pdf | 31 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 - A Bldg - Dec 25.pdf | 31 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 - A Bldg - Dec 25.pdf | 31 Jan 2026 |
| Form 1File: A Bldg - Form 1 - Mar 25.pdf | 13 Nov 2025 |
| Form 2File: A Bldg - Form 2 - Mar 25.pdf | 13 Nov 2025 |
| Form 3File: Form 3 Q-4 F.pdf | 13 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: 24-25 Q-4.pdf | 13 Nov 2025 |
| Withdrawal Update Form 1File: A Bldg - Form 1 - Mar 25.pdf | 13 Nov 2025 |
| Withdrawal Update Form 1File: A Bldg - Form 1 - Jun 25.pdf | 13 Nov 2025 |
| Withdrawal Update Form 1File: A Bldg - Form 1 - Sep 25.pdf | 13 Nov 2025 |
| Withdrawal Update Form 2File: A Bldg - Form 2 - Mar 25.pdf | 13 Nov 2025 |
| Withdrawal Update Form 2File: A Bldg - Form 2 - Jun 25.pdf | 13 Nov 2025 |
| Withdrawal Update Form 2File: A Bldg - Form 2 - Sep 25.pdf | 13 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 Q-4 F.pdf | 13 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 Q-1 25-26.pdf | 13 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 Q-2 25-26.pdf | 13 Nov 2025 |
| Declaration in FORM BFile: Form - B - A Bldg.pdf | 5 Mar 2025 |
| Declaration about Commencement CertificateFile: Format D - Building A.pdf | 5 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 12 A Bldg - Form 3 - 30-09-22.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 13 A Bldg - Form 3 - 31-12-22.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 14 A Bldg - Form 3 - 31-03-23.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 15 A Bldg - Form 3 - 30-06-23.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 16 A Bldg - Form 3 - 30-09-23.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 17 A Bldg - Form 3 - 31-12-23.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 18 A Bldg - Form 3 - 31-03-24.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 19 A Bldg - Form 3 - 30-06-24.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 20 A Bldg - Form 3 - 30-09-24.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 21 A Bldg - Form 3 - 31-12-24.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7 A Bldg - Form 3 - 30-06-21.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10 A Bldg - Form 3 - 31-03-22.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9 A Bldg - Form 3 - 31-12-21.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8 A Bldg - Form 3 - 30-09-21.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 11 A Bldg - Form 3 - 30-06-22.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6 A Bldg - Form 3 - 31-03-21.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 A Bldg - Form 3 - 31-12-20.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 A Bldg - Form 3 - 30-09-20.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 A Bldg - Form 3 - 30-06-20.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 A Bldg - Form 3 - 31-03-20.pdf | 18 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 A Bldg - Form 3 - 31-12-19.pdf | 18 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: A Bldg - Form 5 2023-24.pdf | 18 Feb 2025 |
| Details of encumbrances concerned to FinanceFile: A Bldg - Legal Encumbrance.pdf | 17 Feb 2025 |
| Details of encumbrances concerned to FinanceFile: A Bldg - Financial Encumbrances.pdf | 17 Feb 2025 |
| Details of encumbrances concerned to FinanceFile: A Bldg - Financial Encumbrances.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 13 A Bldg Form 1 - Dec 23.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 17 A Bldg Form 1 - Dec 24.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 16 A Bldg Form 1 - Sep 24.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 15 A Bldg Form 1 - Jun 24.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 14 A Bldg Form 1 - Mar 24.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12 A Bldg Form 1 - Sep 23.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 11 A Bldg Form 1 - Jun 23.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 A Bldg Form 1 - Dec 22.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 A Bldg Form 1 - Dec 21.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 A Bldg Form 1 - Sep 21.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 A Bldg Form 1 - Jun 21.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 A Bldg Form 1 - Sep 22.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 A Bldg Form 1 - Dec 20.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 A Bldg Form 1 - Sep 20.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 A Bldg Form 1 - Jun 20.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 A Bldg Form 1 - Mar 20.pdf | 17 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 A Bldg Form 1 - Dec 19.pdf | 17 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 Form 2 Jun 22.pdf | 17 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 Form 2 Sep 22.pdf | 17 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 Form 2 Dec 22.pdf | 17 Feb 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 175 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep ROHAN YUVA - BUILD A on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PUNE NAGAR ROAD13,700+ in Pune
Yashwin Enchante Phase 2
Vilas Javdekar Infinitee Developers Pvt. L
Godrej Greens
DREAM WORLD LANDMARKS LLP
Yashwin Enchante Phase 1
Vilas Javdekar Infinitee Developers Pvt. L
Kohinoor Kaleido
Intofinity Promoters Private Limited
VIJAY VIHAR
COL. RPS RAWAT
FLAMANTE BY VTP LUXE PHASE 1
INTEGRATED BUSINESS ECOSYSTEM PRIVATE LIMI
Builder: ANUMIT BUILDCON PRIVATE LIMITED
ANUMIT BUILDCON PRIVATE LIMITED has 3 registrations on MahaRERA, including ROHAN YUVA - BUILD A and ROHAN YUVA - BLDG E. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if ROHAN YUVA - BUILD A is delayed beyond 30 Apr 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of ROHAN YUVA - BUILD A?
The registered promoter entity is ANUMIT BUILDCON PRIVATE LIMITED, a company as per the filing. Its CIN U41001PN2025PTC248816 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in ROHAN YUVA - BUILD A?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for ROHAN YUVA - BUILD A?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at ROHAN YUVA - BUILD A?
The professionals named in the filing: Architect: ATIT SHRIKANT ADMULWAR; Engineer: LAXMIKANT MORE; Chartered Accountant: RSMS AND ASSOCIATES; Chartered Accountant: K D Gargorte & Associates; Chartered Accountant: Indrajit Tambade; Chartered Accountant: Prasad Nandkumar Malkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in ROHAN YUVA - BUILD A?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback