Revati Anandvan
By Revati Group
RG-MH-52934 · RERA P51600050817 · Last updated on MahaRERA portal: 1 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Revati Anandvan is a Residential / Group Housing project by Revati Group in Nashik, Maharashtra, registered with MahaRERA as P51600050817 on 3 May 2023. Possession is promised by 31 Dec 2028. 31 of the 80 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.
At a glance
Project
- NameRevati Anandvan
- TypeResidential / Group Housing
- Location
- Anandwali
- Nashik (M Corp.)
- Nashik
- 422013
- Pincode422013
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600050817
- ReraGenie IDRG-MH-52934
Builder
- NameRevati Group
- Entity typePartnership
- PartnersShekhar Uttamrao Dhikle, Radhey Bhalchandra Yeole
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on3 May 2023
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings2 building records
- Documents filed90 files
Current status
Figures as on 1 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Revati Anandvan Wing - B | NA | 11 | 10 | 40 | 0 | 40 |
| Revati Anandvan Wing - D | NA | 11 | 10 | 40 | 0 | 40 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 1 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 85%.
Revati Anandvan Wing - B71%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 85% |
| Sanitary Fittings within the flats / premises | 80% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 55% |
Revati Anandvan Wing - D57%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 30% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 10% |
Progress on shared amenities15
As on 1 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed454
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| Revati Anandvan Wing - B | 38 | 189 | 227 |
| Revati Anandvan Wing - D | 38 | 189 | 227 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Sajid Ahmed Gulamdastagir Shaikh | Nashik (M Corp.) | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Revati Anandvan Wing - B | NA | Rs 9.50 cr | Rs 4.60 cr |
| Revati Anandvan Wing - D | NA | Rs 9.50 cr | Rs 4.60 cr |
| - | NA | Rs 1.00 cr | - |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar Rupali&.Vivek Jaykhedkar. |
| Architect | AR Vivek Jaykhedkar |
| Engineer | Er Rohit N Yeole |
| Engineer | Rohit N Yeole |
| Engineer | Mayur Nana Varade |
| Chartered Accountant | CA Paresh Sabadra |
| Chartered Accountant | RSPH & Associates |
| Chartered Accountant | P.N Sabadra & Associates |
| Partner | Role in project |
|---|---|
| Revati Group | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Mar 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Apr 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Mar 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 26 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed90
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2023-2024)File: Form 2A - March 25.pdf | 1 Jul 2026 |
| Form 2A (FY 2025-2026)File: From client Form 2A - March 26.pdf | 1 Jul 2026 |
| Withdrawal Update Form 1File: 4th Qtr Architect Certificate- R Anandvan.pdf | 28 Apr 2026 |
| Withdrawal Update Form 2File: ER .pdf | 28 Apr 2026 |
| Withdrawal Update Form 3File: CA - Final.pdf | 28 Apr 2026 |
| Withdrawal Update Form 1File: AR - Dec 25.pdf | 13 Feb 2026 |
| Withdrawal Update Form 2File: ER - Dec 25.pdf | 13 Feb 2026 |
| Withdrawal Update Form 3File: CA - Dec 25_final.pdf | 13 Feb 2026 |
| Form 1File: AR-Certificate Mar-2025.pdf | 12 Jan 2026 |
| Form 2File: Engineers Certificate- Revati Anandvan (Mar 25).pdf | 12 Jan 2026 |
| Form 3File: CA-Certificate Mar 2025 final.pdf | 12 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Disclosure.pdf | 12 Jan 2026 |
| Form 2A (FY 2024-2025)File: Quality Assurance Certificate .pdf | 7 Jan 2026 |
| Form 5 (FY 2024-2025)File: Signed RERA audit report 24-25.pdf | 12 Dec 2025 |
| Withdrawal Update Form 1File: AR - Sep 25.pdf | 7 Nov 2025 |
| Withdrawal Update Form 2File: ER - Sep 25.pdf | 7 Nov 2025 |
| Withdrawal Update Form 3File: CA - Sep 25_final.pdf | 7 Nov 2025 |
| Form 5 (FY 2023-2024)File: Rera Audit Report FY 23-24 (Revati Anandwan).pdf | 11 Oct 2025 |
| Form 1File: AR - June 25.pdf | 2 Aug 2025 |
| Form 2File: ER Certificate - june 25.pdf | 2 Aug 2025 |
| Form 3File: CA Certificate- June 25 final.pdf | 2 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Jun 25.pdf | 2 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR-Certificate Mar-2025.pdf | 22 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA-Certificate Mar 2025 final.pdf | 20 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate- Revati Anandvan (Mar 25).pdf | 20 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - Revati Anandvan.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate- Dec 24 (Anandwan).pdf | 12 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final CA certificate(Revti Group).pdf | 12 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate- Dec 24 (Anandwan).pdf | 12 Mar 2025 |
| Disclosure of sold/ booked inventoryFile: 3rd Qtr Disclosure of Sold Inventory (Revati Anandwan).pdf | 4 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sept 24 (Revati Anandwan).pdf | 28 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final_CA Certificate Sept 24 (Revati Anandvan).pdf | 28 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Sept 24 (Revati Anandwan).pdf | 28 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclousere Sold Inventory July 24 to Sept 24.pdf | 6 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Rera Audit Report FY 23-24 (Revati Anandwan).pdf | 24 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR June 2024.pdf | 9 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA June 24 final.pdf | 9 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER June 24.pdf | 9 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure Sold Inventory - Revati Grp (1st Qtr).pdf | 7 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Revati Group.pdf | 4 May 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure Sold Inventory.pdf | 4 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate June 23.pdf | 3 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sept 23.pdf | 3 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Dec 2023 Final.pdf | 3 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate -March 24.pdf | 3 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer June 23.pdf | 3 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Sept 23.pdf | 3 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Dec 23.pdf | 3 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer March 24.pdf | 3 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate June 23.pdf | 3 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sept 23.pdf | 3 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dec 23.pdf | 3 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate March 24.pdf | 3 May 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure Sold Inventory 30-6-23.pdf | 29 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure Sold Inventory 30-9-23.pdf | 29 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC_merged.pdf | 26 Apr 2023 |
| Other - TechnicalFile: Form D-Revati Anandvan.pdf | 26 Apr 2023 |
| Layout approvalFile: 1_rotated.pdf | 7 Apr 2023 |
| Copy of Layout Approval (in case of layout)File: 1_rotated.pdf | 7 Apr 2023 |
| Layout approvalFile: Plan 2 of 4.pdf | 28 Mar 2023 |
| Layout approvalFile: Plan 3of 4.pdf | 28 Mar 2023 |
| Layout approvalFile: Plan 4 of 4.pdf | 28 Mar 2023 |
| Building plan approvalFile: Plan 2 of 4.pdf | 28 Mar 2023 |
| Building plan approvalFile: Plan 3of 4.pdf | 28 Mar 2023 |
| Building plan approvalFile: Plan 4 of 4.pdf | 28 Mar 2023 |
| Copy of Layout Approval (in case of layout)File: Plan 2 of 4.pdf | 28 Mar 2023 |
| Copy of Layout Approval (in case of layout)File: Plan 3of 4.pdf | 28 Mar 2023 |
| Copy of Layout Approval (in case of layout)File: Plan 4 of 4.pdf | 28 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 2 of 4.pdf | 28 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 3of 4.pdf | 28 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 4 of 4.pdf | 28 Mar 2023 |
| Other - TechnicalFile: Clerification Letter-Final.pdf | 28 Mar 2023 |
| Building plan approvalFile: 1_rotated.pdf | 25 Mar 2023 |
| Copy of the legal title reportFile: Title Report.pdf | 25 Mar 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 1_rotated.pdf | 25 Mar 2023 |
| Declaration about Commencement CertificateFile: Form D.pdf | 25 Mar 2023 |
| Declaration in FORM BFile: Form B developer.pdf | 25 Mar 2023 |
| CERSAI detailsFile: CERSAI_Search_Report (1).pdf | 25 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate- Revati Anandwan.pdf | 25 Mar 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Discloure.pdf | 25 Mar 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 90 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Revati Anandvan on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Anandwali4,100+ in Nashik
Filed coordinates, straight-line distance. 109 registered projects within 2 km.
Samraat AmOzon
M/S Shweta Infrastructure & Housing (I) Pv
ELYSIAN
ROONGTA HOMES LLP
HAPPY LIFE AT APNA GHAR PHASE III
M/S Shweta Infrastructure & Housing (I) Pv
SKY53
SKY53
ROONGTA ROSEWOOD APARTMENT
SHREE TIRUMALA BUILDCON
ROONGTA EMINENCE APARTMENT
SHREE TIRUMALA BUILDCON
See every Nashik project, with the district possession charts
Builder: Revati Group
Revati Group has 1 registration on MahaRERA, including Revati Anandvan. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if Revati Anandvan is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Revati Anandvan?
The registered promoter entity is Revati Group, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Revati Anandvan?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Revati Anandvan?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Revati Anandvan?
The professionals named in the filing: Architect: Ar Rupali&.Vivek Jaykhedkar.; Architect: AR Vivek Jaykhedkar; Engineer: Er Rohit N Yeole; Engineer: Rohit N Yeole; Engineer: Mayur Nana Varade; Chartered Accountant: CA Paresh Sabadra. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Revati Anandvan?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback