Home / Browse projects / Nashik, Maharashtra / Revati Anandvan

Registered No litigation declared Residential / Group Housing project

Revati Anandvan

By Revati Group

RG-MH-52934 · RERA P51600050817 · Last updated on MahaRERA portal: 1 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
8 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 85%
49 of 80Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

Revati Anandvan is a Residential / Group Housing project by Revati Group in Nashik, Maharashtra, registered with MahaRERA as P51600050817 on 3 May 2023. Possession is promised by 31 Dec 2028. 31 of the 80 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete.

At a glance

Project

  • NameRevati Anandvan
  • TypeResidential / Group Housing
  • Location
    • Anandwali
    • Nashik (M Corp.)
    • Nashik
    • 422013
  • Pincode422013
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600050817
  • ReraGenie IDRG-MH-52934

Builder

  • NameRevati Group
  • Entity typePartnership
  • PartnersShekhar Uttamrao Dhikle, Radhey Bhalchandra Yeole

Key dates

this monthRegisteredMay 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 May 2023
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed90 files

Current status

39%31 of 80 units booked
46.0%Work done, per cost certificate

Figures as on 1 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Revati Anandvan Wing - BNA111040040
Revati Anandvan Wing - DNA111040040

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 1 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 85%.

Revati Anandvan Wing - B71%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.85%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.55%
Revati Anandvan Wing - D57%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 1 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed454

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots454
Closed/Covered76
Open Space378
BuildingClosed/CoveredOpen SpaceTotal
Revati Anandvan Wing - B38189227
Revati Anandvan Wing - D38189227

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,645 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Sep 2025
LandownerVillageDistrict
Sajid Ahmed Gulamdastagir ShaikhNashik (M Corp.)Nashik

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI7717.74
Proposed, not sanctioned7,718 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor Hotel Pachavati Elite Opp Seble Hotel Trimbak Road Nashik 422002
Estimated costRs 20.00 cr
Cost incurredRs 9.19 cr
Work done45.96%
BuildingWingEstimatedIncurred
Revati Anandvan Wing - BNARs 9.50 crRs 4.60 cr
Revati Anandvan Wing - DNARs 9.50 crRs 4.60 cr
-NARs 1.00 cr-

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Rupali&.Vivek Jaykhedkar.
ArchitectAR Vivek Jaykhedkar
EngineerEr Rohit N Yeole
EngineerRohit N Yeole
EngineerMayur Nana Varade
Chartered AccountantCA Paresh Sabadra
Chartered AccountantRSPH & Associates
Chartered AccountantP.N Sabadra & Associates
PartnerRole in project
Revati Group-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2023-2024)File: Form 2A - March 25.pdf1 Jul 2026
Form 2A (FY 2025-2026)File: From client Form 2A - March 26.pdf1 Jul 2026
Withdrawal Update Form 1File: 4th Qtr Architect Certificate- R Anandvan.pdf28 Apr 2026
Withdrawal Update Form 2File: ER .pdf28 Apr 2026
Withdrawal Update Form 3File: CA - Final.pdf28 Apr 2026
Withdrawal Update Form 1File: AR - Dec 25.pdf13 Feb 2026
Withdrawal Update Form 2File: ER - Dec 25.pdf13 Feb 2026
Withdrawal Update Form 3File: CA - Dec 25_final.pdf13 Feb 2026
Form 1File: AR-Certificate Mar-2025.pdf12 Jan 2026
Form 2File: Engineers Certificate- Revati Anandvan (Mar 25).pdf12 Jan 2026
Form 3File: CA-Certificate Mar 2025 final.pdf12 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure.pdf12 Jan 2026
Form 2A (FY 2024-2025)File: Quality Assurance Certificate .pdf7 Jan 2026
Form 5 (FY 2024-2025)File: Signed RERA audit report 24-25.pdf12 Dec 2025
Withdrawal Update Form 1File: AR - Sep 25.pdf7 Nov 2025
Withdrawal Update Form 2File: ER - Sep 25.pdf7 Nov 2025
Withdrawal Update Form 3File: CA - Sep 25_final.pdf7 Nov 2025
Form 5 (FY 2023-2024)File: Rera Audit Report FY 23-24 (Revati Anandwan).pdf11 Oct 2025
Form 1File: AR - June 25.pdf2 Aug 2025
Form 2File: ER Certificate - june 25.pdf2 Aug 2025
Form 3File: CA Certificate- June 25 final.pdf2 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Jun 25.pdf2 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR-Certificate Mar-2025.pdf22 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA-Certificate Mar 2025 final.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate- Revati Anandvan (Mar 25).pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory - Revati Anandvan.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate- Dec 24 (Anandwan).pdf12 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final CA certificate(Revti Group).pdf12 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate- Dec 24 (Anandwan).pdf12 Mar 2025
Disclosure of sold/ booked inventoryFile: 3rd Qtr Disclosure of Sold Inventory (Revati Anandwan).pdf4 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sept 24 (Revati Anandwan).pdf28 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final_CA Certificate Sept 24 (Revati Anandvan).pdf28 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Sept 24 (Revati Anandwan).pdf28 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclousere Sold Inventory July 24 to Sept 24.pdf6 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Rera Audit Report FY 23-24 (Revati Anandwan).pdf24 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR June 2024.pdf9 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA June 24 final.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ER June 24.pdf9 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure Sold Inventory - Revati Grp (1st Qtr).pdf7 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Revati Group.pdf4 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure Sold Inventory.pdf4 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate June 23.pdf3 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Sept 23.pdf3 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Dec 2023 Final.pdf3 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate -March 24.pdf3 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer June 23.pdf3 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Sept 23.pdf3 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Dec 23.pdf3 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer March 24.pdf3 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate June 23.pdf3 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Sept 23.pdf3 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Dec 23.pdf3 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate March 24.pdf3 May 2024
Disclosure of sold/ booked inventoryFile: Disclosure Sold Inventory 30-6-23.pdf29 Nov 2023
Disclosure of sold/ booked inventoryFile: Disclosure Sold Inventory 30-9-23.pdf29 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: CC_merged.pdf26 Apr 2023
Other - TechnicalFile: Form D-Revati Anandvan.pdf26 Apr 2023
Layout approvalFile: 1_rotated.pdf7 Apr 2023
Copy of Layout Approval (in case of layout)File: 1_rotated.pdf7 Apr 2023
Layout approvalFile: Plan 2 of 4.pdf28 Mar 2023
Layout approvalFile: Plan 3of 4.pdf28 Mar 2023
Layout approvalFile: Plan 4 of 4.pdf28 Mar 2023
Building plan approvalFile: Plan 2 of 4.pdf28 Mar 2023
Building plan approvalFile: Plan 3of 4.pdf28 Mar 2023
Building plan approvalFile: Plan 4 of 4.pdf28 Mar 2023
Copy of Layout Approval (in case of layout)File: Plan 2 of 4.pdf28 Mar 2023
Copy of Layout Approval (in case of layout)File: Plan 3of 4.pdf28 Mar 2023
Copy of Layout Approval (in case of layout)File: Plan 4 of 4.pdf28 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 2 of 4.pdf28 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 3of 4.pdf28 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: Plan 4 of 4.pdf28 Mar 2023
Other - TechnicalFile: Clerification Letter-Final.pdf28 Mar 2023
Building plan approvalFile: 1_rotated.pdf25 Mar 2023
Copy of the legal title reportFile: Title Report.pdf25 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: 1_rotated.pdf25 Mar 2023
Declaration about Commencement CertificateFile: Form D.pdf25 Mar 2023
Declaration in FORM BFile: Form B developer.pdf25 Mar 2023
CERSAI detailsFile: CERSAI_Search_Report (1).pdf25 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate- Revati Anandwan.pdf25 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Discloure.pdf25 Mar 2023

How this compares with Nashik

39%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Revati Anandvan on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Anandwali4,100+ in Nashik

2 kmRevati AnandvanCompleted 51Lapsed / revoked 12Other 46Dot size: filed unitsN

Filed coordinates, straight-line distance. 109 registered projects within 2 km.

Builder: Revati Group

Revati Group has 1 registration on MahaRERA, including Revati Anandvan. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if Revati Anandvan is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Revati Anandvan?

The registered promoter entity is Revati Group, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Revati Anandvan?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Revati Anandvan?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Revati Anandvan?

The professionals named in the filing: Architect: Ar Rupali&.Vivek Jaykhedkar.; Architect: AR Vivek Jaykhedkar; Engineer: Er Rohit N Yeole; Engineer: Rohit N Yeole; Engineer: Mayur Nana Varade; Chartered Accountant: CA Paresh Sabadra. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Revati Anandvan?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Revati Anandvan. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Revati Anandvan to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.